1 Department of Information Technology Centre Submission of initial Draft of Self Assessment Report 14.10.2009 Initial Draft of Self Assessment Report.

Slides:



Advertisements
Similar presentations
1 Department of Farm Power & Machinery Submission of initial Draft of Self Assessment Report Initial Draft of Self Assessment Report was returned.
Advertisements

So, What Happens Now? The Summary and Implementation Reports and Implementation of Initiatives and Outcomes.
Washtenaw County Strategic Space Plan Recommendations November 1, 2006.
1 Department of Correctional Services FIVE-YEAR REVIEW ( ) Considerations for Parliament 10 June 2009.
4 th Meeting of Quality Enhancement Cells (Phase-III) University of Health Sciences, Lahore Presented By: Waqas Latif M.Sc. Biostatistics Deputy Director.
Quality Enhancement Cell Dr. Dawar Hameed Mughal Director.
University of Banja Luka Faculty of Electrical Engineering.
2006 Administrative Services Program Reviews Program Review Schedule Business Office 2004 – completed Computing Services 2005 – completed O and M 2006.
University of Peshawar 13 th QEC Meeting August 18-19,2009, Karachi.
Preparing for your first annual progress review FMS postgraduate training workshop Monday 2 March 2015 Professor Dianne Ford Associate Dean for Taught.
University of Health Sciences, Lahore 2nd Meeting of Phase-III QECs [Reporting Period: July – Nov 2010 Presented By: Prof. Dr. Arif Rashid Khawaja FRCS(Ed),
University of Veterinary and Animal Sciences, Lahore 12 th Meeting of QECs Heads By Dawar Hameed Mughal Deputy Director QEC
CPA is a UKAS company Decision making process 2014 Seminars.
FARMERS TRAINING & SKILLS DEVELOPMENT CENTER HYDERABAD Progress Report 1.
UNC Budget Outlook November 7, 2008 The University of North Carolina UNC Faculty Council.
QEC initiates SA through the dean one semester prior to the assessment Department forms the PT that will be responsible for preparing SAR QEC reviews.
1 st Phase Model Department Institute of Food Sciences & Technology.
LLC Meeting August 26, Updates on Current Projects o UC journal access partnership o Integrated Library System (ILS) o Reports Submission System.
SUKESHI MEHTA COORDINATOR, CHEMICAL SAFETY OFFICE OF RADIATION, CHEMICAL & BIOLOGICAL SAFETY FRIDAY OCTOBER 3 RD,
1 G.Shirkov, JINR Scientific Council, SUPPLEMENTS TO THE PROGRAMME OF JINR’s SCIENTIFIC RESEARCH AND DEVELOPMENT FOR 2004–2009 I. JINR Engineering.
Counselor Conference November 19, 2013 Dr. Lawrence E. Whitman Kansas Affiliate Director, PLTW College of Engineering Wichita State University.
SELF ASSESSMENT CRITERIA 1.Program Mission Objectives and Outcomes 2.Curriculum Design and Organization 3.Laboratories and Computing Facilities 4.Student.
DRAFT Title I Annual Parent Meeting Alpha Charter of Excellence September 22, 2015 Isabel Navas, Principal.
DIMENSIONS OF QUALITY ASSURANCE IN HIGHER EDUCATION AND CHALLENGES OF FUTURE.
IN THE NAME OF ALLAH, THE MOST MERCIFUL, THE MOST BENEFICENT.
The program “Young Staff at JINR” G. Shirkov, A. Ayriyan JINR Scientific Council Dubna,
Helmut Skala, GÖD-Lehrer Austria1 ELFE 2 Regional Seminar Brussels, JANUARY 2009 “Individualisation in the learning process” “Individualisation in.
Disability Support Setting Goals and Making Plans According to Your IEP.
Fall, 2012 August 10,  Janet Rivera, President—Area 3  C. Jennet Stebbins, Vice President—Area 1  Lisa Turner, Clerk—Area 7  Dr. Mary Ann Cox—Area.
SELF ASSESSMENT CRITERIA 1.Program Mission Objectives and Outcomes 2.Curriculum Design and Organization 3.Laboratories and Computing Facilities 4.Student.
A Multi-Campus Model for Program Review & Integrated Institutional Planning Raúl Rodriguez, Ph.D., Chancellor 1.
1 Department of Animal Product Technologies Submission of initial Draft of Self Assessment Report Initial Draft of Self Assessment Report was.
1 Department of Veterinary Parasitology Submission of initial Draft of Self Assessment Report Initial Draft of Self Assessment Report was returned.
California State University CSU Math and Science Teacher Initiative: The Fundamental Role of Collaboration and Partnerships Beverly Young, Ph.D. Assistant.
2   Lab fees must be collected as E&G revenue per Texas Education Code.   Lab fee accounts must be reconciled for each semester’s activity to adjust.
On Site Review Process Office of Field Services Last Revised 8/15/2011.
University of Veterinary & Animal Sciences, Lahore 11 th Meeting of QECs Heads by Dr. Dawar Hameed Mughal Deputy Director QEC Deputy Director QEC.
FY13 Expenditure Budget Calendar ▸ 3/5/12 - 4/15/12: FY13 Position Management & Budget Submission Process ▸ 3/8/12 - 3/16/12 : Student fee Submission process.
2 LATEST STATUS OF FACULTY OF ISLAMIC STUDIES DepartmentProgram TeamsSAR Received Sent Back For Changes SAR Received After Improvement Audit Completed.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
1 Department of Entomology Submission of initial Draft of Self Assessment Report Initial Draft of Self Assessment Report was returned back by.
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
1 Department of Soil Science Submission of initial Draft of Self Assessment Report Initial Draft of Self Assessment Report was returned back.
Planning Your Case Study HROB 101 Spring As A Team Identify Current Conditions What does the instructor require? Is there a reward for early completion?
New England Association of Schools and Colleges Community Resources for Learning.
IT Strategic Plan 5 Years Later Fall Dr. Bradley C. Wheeler Assoc. VP of Research & Academic Computing and Dean of IT (Acting) Office of the Vice.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
3 STUDENT ASSESSMENT DEPARTMENT
SZABIST INSTITUTIONAL RESEARCH DEPARTMENT QUALITY ENHANCEMENT CELL.
1 Department of Plant Protection Submission of initial Draft of Self Assessment Report Initial Draft of Self Assessment Report was returned.
S AM H OUSTON S TATE U NIVERSITY O FFICE OF I NSTITUTIONAL E FFECTIVENESS A DMINISTRATIVE P ROGRAM R EVIEW.
Facilities Inspected FacilityParkingMap ReferenceComments High Bay Physics Laboratory 700 No recommended signage Cross Cultural Center 720 No recommended.
EMPOWERMENT THROUGH EDUCATION Business Retention and Expansion Task Force Workshop Joe Lucente Assistant Professor and Extension Educator OSU Extension.
Draft Revised Ordinance Cross Connection Control and Backflow Prevention March 27, 2015 Sun City Center.
ISTU Progress report. 2 nd year resume Ms. Varvara PANKO, assistant contact person Irkutsk State Technical University 2012.
School Improvement Updates Accreditation (AdvancED) Process ASSIST Portfolio for Schools May 2016 Office of Service Quality Veda Hudge, Director Donna.
Diana Dobie-Snober Final Assignment Week 6 Assistive Technology Interview Professor Benjamin Kirgan.
DBM 384 Week 4 Learning Team Executive Summary Memo Draft Check this A+ tutorial guideline at 384/DBM-384-Week-4-Learning-Team-
Mehran University of Engineering & Technology, Jamshoro
Audit Committees: Perspectives from an Elected Official
SCHOOL and DISTRICT ACCREDITATION
Ranking Parameters of Universities in Pakistan HEC Perspective
Department of Statistics
Sam Houston State University
Institution Name.
NWFP Agricultural University Peshawar
Purdue University The PURR campus data repository service: institutional effort looking towards international engagement Michael Witt, associate.
Sam Houston State University
Role of State Audit Bureau of Kuwait in promoting and audit of IT Security  
بسم الله الرحمن الرحيم.
Presentation transcript:

1 Department of Information Technology Centre Submission of initial Draft of Self Assessment Report Initial Draft of Self Assessment Report was returned back by QEC Submission of Final Draft of Self Assessment Report Visit of Assessment Team Submission of Executive Summary to Vice Chancellor Submission of Implementation Plan

2 Assessment Team 1.Dr. Mukhtiar Ali Unar Professor, Department of Computer Science, MUET, Jamshoro. 2.Dr. Mujeeb-ur-Rehman Mari, Assistant Professor Department of Computer Science, University of Sindh, Jamshoro. 3.Dr. Moin-u-Din Abro, Assistant Professor, MUISTD, MUET, Jamshoro.

3 Assessment Team Department of Plant Protection

4 Information Technology Centre Status of Implementation Plan  A new building may be constructed for the institute. Alternatively, the building should be properly renovated and modified so that ventilation is ensured.  It is strongly recommended that a dedicated standby generator should be made available so that lab work and classes are not disturbed due to frequent power breakdown.  The Center has a severe shortage of highly qualified teachers.  Serious efforts are required to bring teacher-student ratio down.  Number of trainers in laboratories may be increased.  P-III computers are being used which are almost obsolete. The P-III computers should be replaced immediately by the latest computers.  Regular annual budget may be allocated to the seminar library so that the purchase of latest books may be ensured. The work is in progress.