Chilling at Penn: Weather-Analysis of Load Tool (WALT) Abstract: Penn’s MOD 7 plant supplies chilled water to the entire campus for its air- conditioning.

Slides:



Advertisements
Similar presentations
Text Chiller Plant Optimization that Reduces Energy Consumption 20-50%
Advertisements

© Actility – Confidential – Under NDA 1 Advanced flexibility management: concepts and opportunities Making Things Smart.
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
WHAT IS STEAM PRO? Thermoflow, Inc.
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
The Value of DOD Installation Energy Management Control Systems (EMCS) and Command Centers for Improved Operations and Increased Energy Efficiency Moderator:
1 Wal-Mart’s View on Demand Response Program Design Anoush Farhangi Angela Beehler.
Electronic Pitch Trainer Abstract: A baseball pitch has many properties that vary from pitch-to-pitch. Some of the more apparent properties are the release.
Energy Performance Analysis with RETScreen
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Franco Barnard M&V Project Engineer Baseline Service Level Adjustments of ECM on Compressed Air Systems 16 August 2012.
E_KINETIC WALL – Transformation of Kinetic Architecture from Architectural Concept to Engineering Design ABSTRACT Bus stop shelters are traditionally static.
System Overview Results Graphical User Interface GREENGINEERING: MATLAB Model that helps users select appropriate turbine based on their project limitations.
Local Agricultural Supply Chain Improvement Lindsey Arita, Joseph Lee, Julia Mahon, Jay Raghavan Advisor: Dr. Eric Bruun ESE Senior Design Demo.
SCENARIO #1: Housing Bubble Bursts  Negative shock in real estate sector: -18%  Most affected sectors through comparison of expected GDP without shock:
Chapter 12 - Forecasting Forecasting is important in the business decision-making process in which a current choice or decision has future implications:
Leaders in Sustainable Energy Stewart Conway & Prakash Patel.
Utility Monitoring System Overview AH&MA Annual Conference & Leadership Forum April 5, 2001 Chicago, IL Brian Burke, CEM Energy Manager.
T T18-05 Trend Adjusted Exponential Smoothing Forecast Purpose Allows the analyst to create and analyze the "Trend Adjusted Exponential Smoothing"
Integrating a Saving Energy controller in Existing Air Condition units Case Study.
ForecastingOMS 335 Welcome to Forecasting Summer Semester 2002 Introduction.
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
Energy Smart Room GROUP 9 PRESENTERS DEMO DATE SPECIAL THANKS TO ADVISOR PRESENTERS Thursday April 19, 2007 Department of Electrical and Systems Engineering.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Lecture Objectives: Finish wit introduction of HVAC Systems Introduce major ES software.
Methodological Issues Arising Across Different Types of Energy Efficiency Projects QualityTonnes Kevin James Montreal December 3, 2005.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
ResourceFull Authors: Matt Kaye (EE ‘12) Nitin Puri (SSE ‘12) Advisor: Dr. Alejandro Ribeiro Special Thanks.
ENTERPRISE ENERGY MANAGEMENT SYSTEM Jason Kutch, P.E. Malcolm Drane, P.E. UTILITY METERING AT PURDUE.
Team 20 Advisor Dr. John Keenan 2:30 pm – 3:00 pm 3:00 pm – 3:30 pm Abstract Course scheduling is an integral part of the college experience. At the University.
The system will output the following: Our analysis concluded that the average breakeven point for a given fire department installing solar panels on its.
Hierarchical Design Methodology This methodology allows the designer to: –Transform a schematic into a module –Use submodules to create new modules from.
ENERGY SCAVENGING SYSTEM ABSTRACT On a daily basis, energy is constantly being wasted in both large and small scales. In the U.S alone, 56% of energy produced.
Abstract On October 31 st, 2011, the United Nations reported that the world population had reached 7 billion and was projected to hit 9 billion by 2050,
M&V Part 2: Risk Assessment & Responsibility Allocation.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Forecasting and Verifying the Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
Lecture Objectives: Summarize sorption chillers Learn about Chiller modeling Cooling towers and modeling.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
WELCOME TO SEMINAR ON SCADA WELCOME TO SEMINAR ON SCADA Presented by: ANIL KUMAR RAUT Adm No:33IE/2k.
Forecasting and Verifying Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
IE337 Automatic Control Systems KSU - College of Engineering - IE Department 1 Chapter 1: Introduction to Factory Automation.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Using GIS to Find Suitable Locations for Solar Power Plants Submitted By: Scott Peterson May 12, 2005 Texas A&M University Department of Civil Engineering.
Dialing it in: A Year of Tuning the NCAR-Wyoming Supercomputing Center Aaron Andersen, Deputy Director of Operations, National Center for Atmospheric Research(NCAR)
Introduction to HVAC Optimization
Verification tools at the Norwegian Meteorological Institute By Helen Korsmo EGOWS 2004.
Introduction to Energy Management. Week/Lesson 12 Advanced Technology for Effective Facility Control.
7th International Scientific Conference on “Energy and Climate Change”
1 Regression-based Approach for Calculating CBL Dr. Sunil Maheshwari Dominion Virginia Power.
A Reliable but Simplified Method for Measuring the Savings from Advanced RTU Control Retrofits February 13, 2013 Presentation to: RTF Commercial Rooftop.
Better together... we deliver MODELLING, CONTROL AND OPTIMISATION OF A DUAL CIRCUIT INDUCED DRAFT COOLING WATER SYSTEM February 2016 C.J. Muller Sasol;
Robodog Frontal Facial Recognition AUTHORS GROUP 5: Jing Hu EE ’05 Jessica Pannequin EE ‘05 Chanatip Kitwiwattanachai EE’ 05 DEMO TIMES: Thursday, April.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
TRMAC Meeting April 14, 2015 TRM EUI Measure Development Project.
Energy Program Implementation Reducing Operational Expense by Benchmarking and Continuous Improvement Practices.
ENERGY SAVING AND EFFICIENCY OF AIR CONDITION & LIGHT SYSTEMS AT PUBLIC BUILDINGS Meitav-tec (Contel group)
Performance Margins for Snowmaking
Fort Stanwix National Monument Energy Audit Contract
Seminar On Energy Audit Submitted To: Submitted By:
Lecture Objectives: Discuss Final Project
Mid Semester UEB Energy Analysis of a Wastewater Treatment Plant by using Artificial Neural Network Presented by: Dr. Nor Azuana Ramli Electrical Engineering.
ANSI/ASHRAE 90.4 Energy Standard for Data Centers
Predicting Frost Using Artificial Neural Network
When: Monday 26, 4 pm Where: ECJ Building, Classroom 3.402
Behavior Modification Report with Peak Reduction Component
Calibrated Energy Models: One New Change
Presentation transcript:

Chilling at Penn: Weather-Analysis of Load Tool (WALT) Abstract: Penn’s MOD 7 plant supplies chilled water to the entire campus for its air- conditioning and other cooling needs. Currently at MOD 7, an operator selects the thermodynamic parameters of the supplied water based solely on qualitative experience. This results in volatility of the selected parameters and overconsumption of energy. We have created a model to systematically determine the parameters using the expected dry-bulb temperature, relative humidity, and cloud cover over the next 24 hours. MOD 7 operators can use the outputs of this model as the inputs into their current control center. This model can be used not only in determining the necessary plant outputs, but also as a tracking and monitoring tool. It forecasts energy consumption for the following day, allowing the plant operator to proactively plan for the costly effects associated with spikes in chilled water demand. The university can also use this tool to understand expected performance when doing life-cycle cost analysis of the plant and making upgrades.. University of Pennsylvania Department of Electrical and Systems Engineering TEAM 08 Authors: Christine Muller (SSE) Amrita Nag (SSE) Megan Purzycki (SSE) Daniel Sherman (EE) Advisors: Dr. Peter Scott Mr. Donald Bravo DEMO TIMES: Thursday, April 19 th, :30am - 12:00pm 1:30pm - 2:00pm 2:30pm - 3:00pm 3:00pm - 3:30pm Project Statement Even though the MOD 7 plant is regarded as a highly innovative chilling structure and uses many energy conservation measures, the plant lacks any systematic way of determining the parameters of the water it supplies. This causes certain parameters to be unstable, making the plant more likely to overconsume energy and causing more wear and tear on the machinery. In order to realize the savings that result from systematic determination of these parameters, there must be an accurate forecasting algorithm that predicts the chilled water demand. Figure 1. MOD 7 Chilling Plant Building the Model The model outputs predicted water flow (Q), temperature differential (ΔT) between supply and return, and energy consumption for the plant on an hourly basis using dry-bulb temperature (T), relative humidity (H), and cloud cover (C) (Figure 2). Regression equations determine the temperature differential and flow outputs (Equations 1 & 2). When creating the regression, we decided to screen the data, taking out data points where the operator overshot or undershot the parameters, to ensure our model reflects a more accurate prediction. An overshot was considered a data point that was both 15% higher than the previous point and 10% higher than the next point. Outlier data points were replaced with an average of the previous and next data points. We were aiming to get an adjusted R 2 value greater than 0.90 for both equations. A thermodynamic equation then determines energy consumption rate using the energy conversion factor of MOD7 and the outputs from the temperature differential and flow equations (Equation 3). To make the tool user friendly, we designed a system that will automatically extract the necessary inputs from the internet and display the final outputs in both table and graphical formats in a user interface (Figure 3). Verifying the Model The prediction model was verified by comparing the predicted parameters to the actual values over a 1 month interval (Figure 4,5). We created a 95% Confidence Interval (α=0.05) for each prediction to counteract the margin of error that occurs when using regression analysis (Equation 4). Over 94% of the actual values fell within our CI. Differences can be attributed to random fluctuations in building occupancy that could not be incorporated into regression. System Block Diagram InputsOutputsOutput Dry Bulb Temp ( o F) Cloud Cover (1-10) Relative Humidity (%) Linear Regression Chiller Efficiency (Tons/kW) Heat Removed (Tons) Temp Differential ( o F) Water Flow Rate (GPM) Water Flow Rate (GPM) Energy Consumption Rate (kW) Figure 2. System Block Diagram Project Objectives The objective of this project was to design a forecasting model using screened historical data and regression analysis. Our intention was to make a tool that the university’s Facilities and Real Estate Services (FRES) could use for the following purposes: Completely automated system to reduce the volatility in the thermodynamic parameters and the training time for new personnel with insufficient prior experience. The system makes predictions 24 hrs in advance, allowing operators to plan for spikes in chilled water demand or any other drastic deviations much sooner. Diagnostic tool to monitor the actual performance of the plant compared to the expected performance, allowing operators to recognize if any machinery is malfunctioning. Benchmarking tool to compare expected performance of the plant vs. historical performance when any upgrades are made in the future. Conclusion We automated selecting MOD 7’s chilled water supply conditions. While creating our model, we discovered that the plant does not always operate as efficiently as it can. The historical data contained several outliers that resulted from the operator misestimating demand. Using statistical analysis based on the weather forecast, on average, consumes less energy than the way the operators are currently predicting demand (Figure 6). We calculated cost savings of $3817 from using our model during the 1 month verification interval. This can equate to much higher savings over a longer time period. If FRES adopts this model, this university facility will operate more efficiently, conserve energy, and realize significant cost savings. Equation 4. Confidence Interval for Flow FLOW (GPM) = T H – C – R adj 2 = TEMPERATURE DIFFERENTIAL ( o F) = 0.169T H – R adj 2 = RATE OF ENERGY CONSUMPTION (kW)= 0.60×Q×ΔT 24 Equations 1, 2, 3. Final Model Equations Figure 6. Actual Energy Consumed – Model Energy Requirement : 2/20/12 - 3/20/12 Time Energy Consumption (kW) Figure 3. Partial User Interface