1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities.

Slides:



Advertisements
Similar presentations
November 16, 2002 Greetings to CLSI Users A Time of Transition W. Thomlinson CLSI Executive Director.
Advertisements

MSDE Alternative Governance Plan Development School: James Madison Middle School January 2012.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES Welcome: Workshop Overview of the Workshop Yong Cai NSLS-II February 7-8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Nanopositioning R&D Plan Yong Chu Experimental Facilities Division, NSLS-II Experimental Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Aesook Byon NSLS-II Deputy Project Director CFAC October 5, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Steve Hulbert, for John Hill CFAC May 8, 2007 Experimental Facilities Update.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
FY Division of Human Resources Development Combined COV COV PRESENTATION TO ADVISORY COMMITTEE January 7, 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES John Hill PAC May 24 th 2007 Initial Beamline Suite and Beamline Development.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview John Hill Experimental Facilities Division Director NSLS-II XPCS/SAXS workshop Jan 10 th 2008.
American Community Survey (ACS) Program Review Webinar March 6, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Beamlines Qun Shen NSLS-II Experimental Facilities Director NSLS-II Project Advisory Committee Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities John Hill CFAC review October 18 th, 2006.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES John Hill EFAC May 10 th 2007 Experimental Facilities Overview.
1 BROOKHAVEN SCIENCE ASSOCIATES User Access and Beamline Development John Hill Director, NSLS-II Experimental Facilities Division NSLS-II User Workshop.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities John Hill Director, NSLS-II Experimental Facilities Division NSLS-II User Workshop July 17, 2007.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities J.P. Hill Experimental Facilities Division Director PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-to-NSLS-II beamline transition plan Outline Reasons, Scope, Criteria, Further input, Timeline Transition plan, Beamline.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Mirror Metrology and Development Strategy Q. Shen, K. Kaznatcheev, A. Fluerasu Experimental Facilities Division NSLS-II.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition from NSLS to NSLS-II Chi-Chang Kao Chairman, NSLS NSLS-II EFAC October 5, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview John Hill Experimental Facilities Division Director NSLS-II Nanoprobe Workshop February 15 th 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Strategic Planning John Hill Experimental Facilities Division Director NSLS-II EFAC May 5 th 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beamline Development John Hill NSLS-II Experimental Facilities Division Director PAC Meeting November 20, 2007.
Beamline Conceptual Design Overview and Interface Management
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES A Wiggler Beamline for XAS at NSLS-II Paul Northrup NSLS-II Project and Environmental Sciences Department Brookhaven National.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
1 BROOKHAVEN SCIENCE ASSOCIATES Beamline Development and Facility Usage.
TEXAS NODAL Market Design Structure and Process August 19, 2003.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
BROOKHAVEN SCIENCE ASSOCIATES NSLS-II - New opportunities for high pressure research - Lars Ehm National Synchrotron Light Source Brookhaven National Laboratory.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Experimental.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
DOE Mini-Review Summary and Management Updates Mark Palmer Fermilab March 15, 2013.
Experimental Facilities Planning
IT Governance Planning Overview
LCLS Ultrafast Science Instruments
X-Ray Endstations Update
Preliminary Project Execution Plan
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Instrument MIE Project: Staffing, Schedule
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities Advisory Committee Meeting April 23-24, 2009

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Updates since May 2008 EFAC Meeting  Selection of project beamlines  Staffing, organization  Revised labor estimates for beamline construction at CD-3 Activities and progress  R&D and infrastructure  Beamline design progress  BAT Charter  Interface management  LOB programming Issues and outlook Summary

3 BROOKHAVEN SCIENCE ASSOCIATES Project Beamlines: LOI Reviews & Decisions Beamline and strategic planning workshops held January-March 2008 Received 11 Letters of Interest (LOIs) from groups wanting to form Beamline Advisory Teams (BATs) for the project beamlines and subsequent beamlines LOIs were reviewed by external reviews and Experimental Facilities Advisory Committee (EFAC). EFAC met May 5-7, 2008 and heard presentations from all 11 LOIs. EFAC report received June NSLS-II carefully evaluated the EFAC rankings and recommendations, and additional information in submitted LOI, external peer reviews, oral presentations and dialog at the EFAC meeting, as well as reviewers’ comments at technical and project reviews, and overall project priorities. Final decision on project beamline selection was communicated with DOE program office and announced at end of August 2008.

4 BROOKHAVEN SCIENCE ASSOCIATES Six Project Beamlines at NSLS-II 1 meV 0.1 meV Inelastic x-ray scattering Hard x-ray nanoprobe 100m long High-energy powder diffraction Sub-  m reso. x-ray spectroscopy 30m long hutch Coherent hard x-ray scattering Coherent soft x-ray scattering/polarization

5 BROOKHAVEN SCIENCE ASSOCIATES Staff Hiring Recruitment of high-quality staff is a major, high-priority activity of XFD during the past year Since last EFAC meeting in May 2008, 18 staff have joined XFD: Five group leaders for project beamlines; Final agreement for one remaining position expected soon; Ten staff for experimental R&D and photon source development; Two mechanical engineers for beamline designs. Experimental Facilities FTE Searches on-going for several key areas: Nanopositioning engineer / scientist; Mirror metrology expert; Beamline scientists.

6 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities Organization Beamline Advisory Teams (BATs)

7 BROOKHAVEN SCIENCE ASSOCIATES Design and Construction Labor Profile As part of CD-3 preparations, beamline labor requirement was refined: Total effort per BL during project is ~ 28.5 FTE-years (was ~ 23.1 FTE-yrs per BL in original baseline estimate)

8 BROOKHAVEN SCIENCE ASSOCIATES Revised Non-R&D FTE & Funding Profiles Added engineer and tech support during installation and testing Revised estimate for Nanoprobe satellite bldg. and beam-transport tunnel Adjustments have been made in initial beamline endstation instrumentation to offset increased cost due to added labor The initial scope of all beamlines can be met within baseline XFD non-R&D budget of $76.3M PCR approved & implemented. Total FTE-yrs = (baseline = 155.1)

9 BROOKHAVEN SCIENCE ASSOCIATES Revised Funding Profile in R&D Consolidated MLL and Kinoform into single 1nm R&D Added R&D beamline at NSLS for optics testing Redirected thermal modeling engineering effort to optical figure control for <0.1urad optics Total budget in R&D is within baseline $19M; Total FTE = 65.6 (baseline = 75.5) PCR

10 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities R&D Program 1 nm focusing optics and nanopositioning 0.1 meV high-resolution optics X-ray beam position monitors Optical figure control (heat load, metrology) Yan, Conley, Lima, Chu (NSLS-II); Maser, Macrander, Rose, Stephenson, et al. (ANL) Deposition Lab Optical Metrology Lab Optical Assembly Lab Mechanical & Electrical Tech Area Etching and Fine Polishing Lab General Purpose Lab Nano- positioning Lab General Purpose Lab Lapping and Cutting Lab The east wing of Bldg.703 has been renovated Seven labs are ISO 7 (Class 10000) clean rooms (4,200 ft 2 ) to accommodate XFD R&D activities Cai, Huang, Honnicke, Keister, Coburn, Struble (NSLS-II); Shvyd’ko (APS)

11 BROOKHAVEN SCIENCE ASSOCIATES Moving into R&D Labs and Offices in B703 Apr.21, 2009 Jan.2, 2009

12 BROOKHAVEN SCIENCE ASSOCIATES Multilayer Laue Lens (MLL) for 1 nm Optics H. Yan, PRB 79, 1 (2009). wMLL Deposition System (R. Conley): Contract awarded to CVD; delivery Jul’09; Grow 1 st MLL by Sep’09. MLL testing (H. Yan, E. Lima): Collaboration with CNM/APS; 1 st far-field image of 2D focusing by MLL MLL theory (H. Yan): Effect of interfacial roughness

13 BROOKHAVEN SCIENCE ASSOCIATES 0.1 meV Optics & R&D Beamline at NSLS NSLS X16a beamline SourceMirror Mono Crystal fabrication facility in Bldg.703 R&D beamline X16A at NSLS developed and started operations April 2009 End-station test instrument designed and assembled with temperature control ovens for dispersion crystals Tilting  (  rad) Cai, Huang, Honnicke, Keister, Coburn, Struble (NSLS-II) Shvyd’ko (APS)

14 BROOKHAVEN SCIENCE ASSOCIATES Optical Metrology Laboratory ALS: flat mirror (InSync) measurements NSLS-II Optical Metrology Lab plans to house/develop cutting-edge metrology tools for advanced optics development: Fizeau interferometer Long Trace Profiler (LTP) Phase shifting micro-interferometer Atomic Force Microscope (AFM) At wavelength metrology

15 BROOKHAVEN SCIENCE ASSOCIATES XPD BAT, November 24, 2008 BAT Meetings SRX BAT, October 30, 2008 CHX BAT, December 9, 2008 IXS BAT, December 5, 2008 CSX BAT, January 8, 2009 HXN BAT, January 26, 2009 All Beamline Advisory Teams (BATs) have completed first official meetings: Good progress made on scientific and technical scopes All BAT reports have been received Beamline conceptual designs in progress

16 BROOKHAVEN SCIENCE ASSOCIATES MOU and BAT Charter

17 BROOKHAVEN SCIENCE ASSOCIATES Main Elements of BAT Charter Beamline Advisory Team (BAT) is a small group of scientists who submit a Letter of Interest (LOI) to NSLS-II, representing a particular community, to propose a specific beamline based on a specific set of experimental techniques to carry out a particular scientific mission. Submitted LOIs are reviewed by external reviewers and by the NSLS-II Experimental Facilities Advisory Committee (EFAC), and approved by the NSLS-II. Primary role of BAT is to advise the NSLS-II Experimental Facilities Division Director on the scientific mission and the technical requirements for the beamline and to work closely with the beamline scientists during design, construction, and commissioning of the beamline. NSLS-II has the overall responsibility for the design and construction of the beamline, including hiring of staff. Major beamline revisions are to be made in consultation with the associated BAT and the community at large. Final decisions on any issues in the design and construction of a beamline reside with the NSLS-II.

18 BROOKHAVEN SCIENCE ASSOCIATES Need EFAC Advice on the Following … Does the BAT Charter adequately describe roles and responsibilities of the BAT? Does individual BAT membership adequately represent the particular user community for the beamline? To ensure high quality interactions between BAT and NSLS-II, we believe there is a need for formal communication channels between EFAC and the BATs: to periodically review how BAT is doing by EFAC, e.g. every 1-2 years; to allow BAT to register concerns and complaints about certain NSLS-II actions. Should NSLS-II have a BAT Council, consisting of representatives from all BATs?

19 BROOKHAVEN SCIENCE ASSOCIATES Beamline Construction Schedule Baseline CD-3 Review Procurement start EF beneficial occupancy Conceptual Design Preliminary Design Final Design Long lead time procurement Installation Testing Construction start Ready for Beam

20 BROOKHAVEN SCIENCE ASSOCIATES Project Beamline Conceptual Designs Finalizing X-ray optics and beamline layout; Optimizing insertion device specifications; Heat load analysis on x-ray mirrors and monochromators; Concept of end-station instrument; Iterating with BAT; Cost and schedule update

21 BROOKHAVEN SCIENCE ASSOCIATES Project Beamline Insertion Device Optimizations Studies on insertion device options: Oleg Chubar (XFD/ASD) Toshi Tanabe (ASD) New XFD/ASD joint working group on IDs: members include XFD, ASD, and NSLS staff; meets weekly to discuss ID options and specifications; current focus is on high-beta long straights. IXS beamline

22 BROOKHAVEN SCIENCE ASSOCIATES Project Beamline Heat Load Analysis Thermal analysis on x-ray monochromators Water-cooled Si mono. Max. slope error ~ 20  rad LN2-cooled Si mono. Max. slope error ~ 0.2  rad Vishy Ravindranath, Sushil Sharma (ASD) Lonny Berman (NSLS) Heat load analysis on x-ray optics are on-going for six beamlines Primary conclusion is that LN2-cooled Si mono is needed for hard x-ray undulator beamlines; Systematic study is underway.

23 BROOKHAVEN SCIENCE ASSOCIATES Hard X-ray Nanoprobe in Satellite Building Vibration isolation from main building 100 m long  larger working distance Concrete expt. hutch w/ acoustic damping Consideration of vibration isolation similar to EM, from ground up Air-lock entry and temperature stability …… N. Simos (CFD) vibration sources

24 BROOKHAVEN SCIENCE ASSOCIATES Laboratory Office Building (LOB) XFD effort on LOB programming requirements: Held several expanded staff meetings to discuss LOB space requirements Did detailed estimates on staffing levels and expected number of users, & their office needs Did detailed analysis on basic equipment needs that are required by most user groups in support of their experiments at beamlines Worked with professional lab planners from HDR on realistic laboratory layouts Held a town-hall meeting with broader community to discuss with the community about our current plan and invite feedback LOB design at CD-2 was baselined under certain financial constraints, and needs to be reevaluated. Expanded LOB design has been given the green light by DOE to proceed.

25 BROOKHAVEN SCIENCE ASSOCIATES Outreach to Community Six beamline advisory teams, with combined membership of >50 scientists representing a diverse user community, have been the main focus of community interactions during the past year. NSLS-II XFD participations in several community organized workshops and meetings, including: BER/NIH workshop on life science at NSLS-II, Sep.11-12, 2008 High pressure research workshop, Oct. 6, 2008 XAS community workshop, Mar. 6, 2009 Workshop on SR applications in microelectronics, Mar. 20, 2009 Workshop on SR applications in glass research, Apr. 6, 2009 Weekly beamline transition workgroup meetings Focused efforts in XFD on defining BATs, recruitment, R&D infrastructure, and beamline conceptual designs have made it difficult to be more engaged with the community during the past year. With more staff scientists on board, we fully expect that community outreach will regain momentum in the coming year.

26 BROOKHAVEN SCIENCE ASSOCIATES Responses to May 2008 EFAC Recommendations

27 BROOKHAVEN SCIENCE ASSOCIATES Responses to Previous EFAC Recommendations

28 BROOKHAVEN SCIENCE ASSOCIATES Issues and Outlook High resolution R&D programs, 1 nm and 0.1 meV, are very challenging; Outcomes may have impact on beamline designs  Need to design beamlines with built-in flexibility to accommodate R&D outcomes Interface activities with ASD especially in the area of insertion device optimization and front-end designs; may impact beamline schedule  Need proactive interface management and considerable interactions at several levels Recruiting and retaining best staff in XFD  Hiring of in the coming months will focus on nanopositioning eng., optical metrology expert, and beamline scientists.  Efforts to create and maintain a nurturing research environment in XFD and encourage discussions on science, R&D, and career developments. Managing priorities and interacting with BATs  Need open and transparent discussions with BAT so difficult decisions can be made with BAT inputs; EFAC input and advisory are welcome.

29 BROOKHAVEN SCIENCE ASSOCIATES Summary NSLS-II Experimental Facilities Division is making good progress in staff recruitment, infrastructure building, x-ray optics R&D, and beamline conceptual designs. Beamline Advisory Team selection process for project beamlines completed by CD-3. Beamline advisory team charter developed. Beamline conceptual designs, with full engagement of BATs, are well underway and on schedule. Considerable interactions with community and NSLS are on going, particularly in LOB programming and workshop participations. An increasing level of NSLS-II outreach activities are anticipated for the coming year, given much higher level of staffing in XFD. We appreciate EFAC input and advice on many topics discussed or to be discussed at today’s meeting