SOUTHEAST DIVISION PERCHLORATE REMEDIATION AND PROPERTY TRANSFER SUCCESS AT A CLOSING FEDERAL FACILITY Naval Weapons Industrial Reserve Plant McGregor,

Slides:



Advertisements
Similar presentations
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Advertisements

BoRit Superfund Site Timeline
Resource Conservation and Recovery Act Authorizes EPA to identify hazardous wastes and regulate their generation, transportation, treatment, storage and.
Facility Lead Corrective Action Approaches Voluntary Agreements RCRA National Meeting August 13, 2003 Jennifer Shoemaker EPA Region 3.
John Lynch, P.E. Palisade Software Miami Users Conference October 25,
PA One Cleanup and Land Use Controls The “Business of Brownfields” Conference April 17, 2008 Terri Smith Environmental Liability Management, Inc.
Long-term Management of Land Use Controls Mare Island RAB Meeting February 23, 2006.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Stephen TerMaath Chief, BRAC Program Management Division 5 June.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Institutional Controls Pamela Elkow and Richard Fil.
Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer Camden County Municipal Utilities Authority Camden, New Jersey September 17, 2014.
PMOBRAC Ms. Kimberly Kesler Director, BRAC Program Management Office March
Navy Involvement with Perchlorate Issues and an Overview of Activities at Naval Weapons Industrial Reserve Plant McGregor, Texas Mario Dumenigo Naval Facilities.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Department of Defense Facilities Unit Hazardous Waste Management Program of the EPD Land Protection Branch.
Who’s Monitoring Land Use Controls on Brownfield Sites? Terri Smith Environmental Liability Management, Inc.
BIOMASS POWER PLANT Jo-Carroll Energy, Inc. (NFP).
Green Remediation An Overview of the State of the Practice
Environmental Management Systems An Overview With Practical Applications.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Dr. Stephen TerMaath Chief, BRAC Program Management Division 22.
Former DuPont Barksdale Works Project Update June 07, 2006 Great Lakes Visitors Center DuPont CRG.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Upper Blackfoot Mining Complex
Facility Lead Corrective Action Opportunities with Union Carbide RCRA National Meeting May, 2005 Bob Greaves EPA Region 3.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Update on the Superfund Program: U.S. Tour de Table NATO SPS Pilot Study Prevention and Remediation in Selected Industrial Sectors June 17-23, 2006 Ljubljana,
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
RESPONSIBLE CARE ® POLLUTION PREVENTION CODE David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
Italy: developments in the new legislation and progress in the remediation of contaminated sites F. Quercia, APAT Tour de Table NATO CCMS Pilot Study Meeting.
Fairbanks Areawide Industrial Reclamation Project ADEC AREAWIDE MANAGEMENT GOALS Janice Wiegers ADEC.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
What are some ways to reduce the risks to public health in drinking water from Salinas Valley? Andrew Mims Nitrates In Groundwater Presentation ENSTU 300.
Maryland Department of the Environment Harbor Point – Regulatory Overview Horacio Tablada, Director Land Management Administration November 14, 2013.
Environmental Regulations. Learning Objectives TLW understand the history of environmental regulations TLW be able to describe key content of environmental.
1 BULGARIA PUBLIC- PRIVATE PARNERSHIP FOR REMEDIATION OF HISTORICAL POLLUTION Dr. Vania Grigorova Ministry of Environment and Water Bulgaria Managing for.
Brownfields: Real Property, the expansion or redevelopment, or reuse of which may be complicated by the presence or potential presence of contamination.
SERDP- ESTCP- ITRC A PARTNERSHIP Dr. Jeffrey Marqusee ESTCP, Director SERDP, Technical Director.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Team Successes at the Former Memphis Depot, Memphis, Tennessee Presented by: David D. Nelson, P.G.Thomas C. Holmes Project Manager, CH2M HillProject Manager,
Mike Perlmutter 5th Annual Joint Services Pollution Prevention and
EPA P-1 Corrective Action Streamlined Consent Orders Bob Greaves Region 3 Deb Goldblum Region 3 Tom Krueger Region 5.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
RCRA 2020 Vision… A View from a Facility Owner Lloyd E. Dunlap Atlantic Richfield Company, BP.
The Dalles, Industrial Certification Northwest Aluminum Company The Dalles, Oregon Douglas C. MacCourt Ater Wynne LLP US German Bilateral Working.
DRAFT The RCRA Cleanup Vision for 2020 “Where are We Going? Matt Hale Director, Office of Solid Waste U.S.EPA.
The Woodlawn Landfill Site A Case Study in the Values and Methods of Ecological Revitalization.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
BROWNFIELDS 2005 Dealing with Unexpected Contamination Lowry Air Force Base Redevelopment Denver, CO Tom Markham, Executive Director, Lowry Redevelopment.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Long-Term Stewardship: Ensuring the Safe Use of Contaminated Sites Brownfields 2006 Boston, MA.
Remediation and Redevelopment at the Former Fort Devens, Massachusetts.
Proposed Plan for No Further Action
Sustainable Remediation Case Studies
Presentation on Livermore Lab Site 300 Superfund Cleanup Peter Strauss, Environmental Scientist, PM Strauss & Assoc. Community-Wide Meeting on
Drought in Texas Texas Division of Emergency Management
Chesterfield Neighborhood Coal Ash Update January 9th, 2019
Senator Dance Town Hall Coal Ash Update December 5, 2018
Board of Public Utilities August 17, 2017
EAST MESABI JOINT WATER SYSTEM A JOINT VENTURE BETWEEN THE east range communities REQUEST A $6 million request for State Funding in 2019 to build a comprehensive.
Presentation transcript:

SOUTHEAST DIVISION PERCHLORATE REMEDIATION AND PROPERTY TRANSFER SUCCESS AT A CLOSING FEDERAL FACILITY Naval Weapons Industrial Reserve Plant McGregor, Texas 2007 Region 4 EPA – DoD – States Environmental Conference June 20, 2007

2 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Facility Background NWIRP McGregor was a 9,700-acre government-owned, contractor-operated facility in McGregor, Texas approximately 20 miles southwest of Waco. The U.S. Army Ordnance Corps originally established the facility in 1942 as the Bluebonnet Ordnance Plant. Over the facility’s 50-year history, owners included the U.S. Army, U.S. Air Force, and its final owner, the U.S. Navy’s Naval Air Systems Command (NAVAIR). Past industrial activities at the site included weapons and solid-fuel rocket propulsion systems manufacturing. At its operational peak, the facility employed nearly 1,400 people, making it the largest employer in the area. Manufacturing operations at NWIRP McGregor ceased in late 1995 and the last operator vacated the facility in early The FY1996 National Defense Authorization Act authorized the conveyance of the NWIRP to the City of McGregor for purposes of economic redevelopment.

3 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007

4 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Investigation Background A multi-phased Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) was initiated in 1992 at NWIRP McGregor. In March 1998, perchlorate was identified as a contaminant of concern in both soil and groundwater and additional investigations were undertaken. Extensive areas of perchlorate affected soil and groundwater were identified both on and offsite. The extensive perchlorate contamination in groundwater raised significant concerns among local stakeholders due to the close proximity of two lakes used to supply drinking water to approximately 500,000 people.

5 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Partnering Success The complex environmental and redevelopment issues associated with NWIRP McGregor required that the Navy work closely and collaboratively with many other agencies. Formal partnering was implemented in 1996 between the Navy, USEPA and Texas Commission on Environmental Quality (TCEQ). –Quarterly meetings were held in McGregor –Open and candid discussions were encouraged –Technical data was shared as it became available –An GIS-based internet website was used to share data, maps and reports with the partnering team Partnering encouraged a greater sense of ownership by all parties involved and expedited decision making. As a result, the project was completed more quickly and efficiently and achieved many “firsts”.

6 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Partnering Success Beyond the core partnering team, the Navy worked collaboratively with many other government agencies including: –the City of McGregor to address property transfer and redevelopment concerns, –the Brazos River Authority (BRA) and City of Waco to address concerns over potential impacts to nearby Lakes Waco and Belton, and –the Army Corp of Engineers to share data with their offsite study in support of the BRA and their work on an adjacent formerly utilized defense site. Working in a collaborative fashion minimized “surprises” for the Navy and resulted in greater cooperation from all agencies.

7 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Risk Communication Beyond just communicating with regulatory and other governmental agencies, the Navy realized the importance of communicating with the local community and stakeholders. To facilitate that communication the Navy established a community based Restoration Advisory Board (RAB) in The RAB included representatives from the local community, the Navy, TCEQ, USEPA and City of McGregor. At quarterly meetings, information was shared openly and RAB members and those in the audience were encouraged to ask questions. Early RAB meetings had a large number of people in the audience as well as television and newspaper reporters. The open and honest sharing of information with the RAB helped to build trust in the local community and allayed their concerns regarding perchlorate.

8 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Risk Communication In addition to the quarterly RAB meetings, the Navy held a perchlorate symposium in Temple, Texas in 1999 and invited national experts to speak and share information with the local community. Also, the Navy frequently met with local landowners whose properties were impacted by contaminated groundwater to discuss the type, design, and locations of remedial systems that would be installed on their properties. Congressional and senatorial staffers were also routinely updated on NWIRP McGregor’s progress in Washington, D.C. and McGregor, Texas.

9 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Regulatory Innovation From 1998 to 2005, a total of 6,000 acres had been transferred to the City of McGregor, all of which were either uncontaminated, had contamination which was below applicable cleanup criteria, or were remediated to applicable cleanup standards prior to transfer. Environmental investigation and cleanup activities at NWIRP McGregor have been governed by a RCRA permit and Compliance Plan. In order to complete property transfer of the remaining 3,700 acres, several issues had to be resolved.

10 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Regulatory Innovation The City needed title to the remaining Navy owned portions of the NWIRP in order to effectively redevelop the NWIRP’s assets. Successful redevelopment of the NWIRP would result in numerous new owners and/or operators of the remaining 3,700 acres of the property. Under the RCRA Post-Closure Permit, all new owners would have to be identified on the permit and sign future permit renewal applications. The City did not want to become the “owner” (or co-owner with others) on a RCRA permit and believed that retaining the current permit would negatively affect property marketability. The Navy had its own regulatory compliance, cost, and liability concerns about retaining (potentially for many years to come), permittee status over property which they no longer either own or operate. Working cooperatively, an ingenious plan was developed by TCEQ and the Navy called a Post-Closure Order (PCO), the first to be issued in the State of Texas.

11 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Regulatory Innovation The PCO takes the place of the RCRA permit for all affected portions of the facility except the Area S burn pads, which then allowed a shrinkage of the RCRA Permit from the original 9,700 acres to only 16.4 acres. The PCO sets out all of the long-term remediation and monitoring requirements. NWIRP McGregor Area S Burn Pad Cap

12 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007

13 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Regulatory Innovation This solution eliminated the need for the City to be named as owner on a permit that would cover all 3,700 acres left to be conveyed. By modifying the RCRA permit to only include the burn pads, it eliminated the need for any successors in interest to be named in the permit thereby enhancing property marketability. This solution limited the range of regulatory requirements and associated liability exposures normally associated with permitted facilities to just a small portion of Area S.

14 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Regulatory Innovation The PCO provides an alternative enforceable mechanism for oversight of the Navy’s facility-wide groundwater cleanup. The PCO only had to be signed by the responsible party, the Navy. The PCO better defines the Navy’s clean-up obligations and future on-site involvement so as to minimize potential redevelopment impacts and stigma. The PCO also serves to minimize the Navy’s regulatory/cost liability exposures associated with the future actions of new owners and operators. The final PCO and a revised RCRA permit were finalized on October 3, 2006 and October 6, 2006, respectively. This was the first PCO ever issued by the TCEQ.

15 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor OPS Determination In addition to the PCO, because some of the treatment systems installed by the Navy will have to operate for years into the future, EPA concurrence that all remedial measures were operating properly and successfully also had to be obtained before property transfer. The process of obtaining this concurrence took approximately one year. During a meeting held on June 29, 2006 EPA indicated that all of their questions had been addressed and they could issue an OPS determination for all of the remaining 3,700 acres. The OPS approval letter was issued by the EPA, October 12, 2006, after they received a copy of the PCO. First Navy facility to receive an EPA “Ready for Reuse” Determination.

16 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Redevelopment Final property transfer at NWIRP McGregor was completed on October 31, The results of the investigation, remedial, and transfer efforts are now paying off. Economic redevelopment has created over 1,000 new jobs for the City of McGregor (new tenants include two Fortune 500 companies). New tenants have invested over $3 million in the facility and employment is increasing. Companies like Dell Computer, SpaceEx, Ferguson Enterprises, and McClennan Electric Co-Op have moved onto the property. Additionally, there are four smaller companies that have operations onsite with several more in negotiations with the city. An indoor rodeo arena has also been built that has brought more than 40,000 people through McGregor.

17 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Process Optimization One of the areas of greatest concern was of former manufacturing complex known as Area M that is located in the southwest corner of NWIRP McGregor. Concentrations of perchlorate up to 91,000 µg/L were found in groundwater monitoring wells in Area M and a groundwater plume covering an area of approximately 360 acres was delineated in and around Area M. Perchlorate concentrations up to 5,600 µg/L were detected in surface water samples collected from a surface water body running through Area M (Tributary M). Perchlorate concentration up to 200 µg/L were detected in surface water approximately 1 mile downstream of the property boundary and concentrations up to 56 µg/L were detected at a location 3 miles downstream of the property boundary. There were no detected impacts to the Leon River or Lake Belton, which is nearest source of drinking water, but concern was high.

18 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Process Optimization The highest priority was given to Area M due to the relatively high concentrations detected and the proximity of Lake Belton. A series of collection trenches were installed near the property line south of Area M beginning in September Several water storage lagoons were also constructed. Various exsitu treatment technologies were tested from late 1999 through mid In November 2001, construction began on the final ex-situ treatment system, a 400 gallon-per-minute (gpm) fluidized bed reactor (FBR) supplied by Envirogen. The FBR began operation in May 2002 after receiving the necessary permits and regulatory approvals. These allowed for the discharge of treated effluent to Tributary M.

19 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 A-LINE TRENCH C-LINE TRENCH B-LINE TRENCH 0400 Onsite Treatment System

20 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007

21 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007

22 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007

23 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Process Optimization The collection trenches and FBR effectively minimized the offsite migration of perchlorate. However, for the following reasons the system required intensive operator involvement: –The Texas Pollutant Discharge Elimination System (TPDES) permit for the system required daily sampling for perchlorate when there was a discharge. –The TPDES permit also required analysis of a grab sample if the system was being operated such that water was being discharged in a batch mode. –One of the operational goals of the trenches is to prevent seeps to Tributary M. As a result, pumping rates have to be adjusted frequently. This required daily, manual adjustments at the FBR. –ORP readings are critical to monitoring the performance of the reactor and these had to be performed manually twice each day at the FBR. –During periods of heavy rain and high groundwater levels, contaminated groundwater could seep into the treated water storage lagoons causing significant water management issues.

24 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Process Optimization In the pre-optimization operating mode, daily staffing of the treatment system was required. During the first several months of operation, approximately 72 to 90 operator hours per week were required to effectively operate the system and meet the TPDES permit conditions. Annual pre-optimization operator labor costs were estimated at approximately $190,000.

25 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Process Optimization In late 2004, NAVFAC EFDSOUTH undertook a series of studies to optimize the performance of the Area M FBR and associated collection, conveyance and storage system. Recommendations for improvements and/or modifications were developed considering the following objectives: –Optimization of the existing groundwater treatment system, –Selection of the most appropriate and reliable mode of operation, –Implementation of an efficient operations program to minimize O&M cost, in particular labor, –Incorporate automatic process control and monitoring to reduce labor, and –Provide highest assurance of compliance with permit limits.

26 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Process Optimization The original TPDES permit, issued in November 2002, was up for renewal at approximately the same time the optimization study was conducted, providing an opportunity to renegotiate sampling requirements. Several beneficial modifications were successfully negotiated based on the past operational reliability of the system and the enhancements to the system that were planned based on the optimization study. The most significant change was a reduction in the required outfall sampling for perchlorate from daily to weekly. A new TPDES permit was issued on July 13, 2005.

27 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Process Optimization Navy contractors (EnSafe Inc. and CCI) completed a treatment system upgrade in September This upgrade included the following major elements: –A control and communication system to provide remote monitoring, remote control, and continuous, uninterrupted remote alarming capability to reduce operator labor and to simplify operation. –Water management modifications to an existing treated effluent water polishing/storage unit (Soil Cell C) to increase operator flexibility and eliminate the potential for groundwater infiltration.

28 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Process Optimization Specific elements of the process optimization included: –Selection of a direct discharge mode of operation utilizing only Soil Cell C for effluent polishing –Rehabilitation of Soil Cell C through the clearing of vegetation, the raising of the cell bottom (to prevent contaminated groundwater infiltration), the installation of an HDPE liner, and the installation of a cascade aerator. –Installation of a Human Machine Interface (HMI)/Supervisory Control & Data Acquisition (SCADA) system with software, configuration, back up power supply and necessary programming to allow day-to-day monitoring and process tracking to be conducted remotely. –Installation of dual inline ORP probes to provide constant, real time monitoring of FBR performance. –Installation of an automated diversion valve to automatically divert water to Lagoon A in the event of a problem with the FBR. –Completion of various minor piping changes to allow greater flexibility in managing untreated water during periods of heavy rainfall.

29 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007

30 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007

31 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007

32 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 NWIRP McGregor Process Optimization Optimization of the Area M groundwater treatment system has been a success in terms of both cost savings and greater operational efficiency. –Sampling has been reduced –Operator labor has been reduced –Problems with contaminated groundwater infiltrating into treated water storage lagoons has been eliminated The approximate cost of the optimization effort was $1,070,000. Based on savings in operator labor, laboratory analysis, and periodic maintenance of the soil cells; the payback period for the optimization effort is 4.75 years.

33 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 First Navy and State of Texas PCO First Navy non-Base Realignment and Closure (BRAC) OPS determination by the USEPA First Navy facility to receive an USEPA “Ready for Reuse” determination First full-scale permeable reactive barrier (PRB) (also called biowall) for groundwater remediation of perchlorate and volatile organic compounds (VOCs). World’s longest biowall application (nearly three miles) Savings of more than $20 million in remedial construction costs and expected savings of more than $1 million annually as a result of the innovative remediation approach, as well as the progressive operation and maintenance (O&M) and project management strategy More than 1,000,000 construction man-hours with no reportable health and safety incidents No regulatory violations during the environmental restoration of the facility NWIRP McGregor Accomplishments

34 NAVFAC EFD SOUTHEAST -- NWIRP McGregor June 20, 2007 Further questions, please contact: Mark Craig Remediation Project Manager NAVFAC Southeast (843) Questions