Malte HildebrandtDC Status Report, 08.04.2009 Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.

Slides:



Advertisements
Similar presentations
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Advertisements

Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Solar Bake Off. PROCEDURE 1.1 st person traces a flap in the top of the box. Use the ruler and marker to measure a 1½” border around the lid, on the.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
1 ME 234/2 HV noise investigation N.Bondar CMU. 12/18/02.
Walls crates cables gas chambers electronics CERN adb.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Status and outlook of the Medipix3 TSV project
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Large Cell Scope Pictures HV Gnd 1nF Large Cell Tube Anode signal Cathode signal scope S1 S2 S1 S2 The following scope pictures were all taken with the.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Malte Hildebrandt MEG Review Meeting, Malte Hildebrandt MEG Review Meeting PSI, February 2010 Drift Chamber System hardware status in 2009.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
Malte HildebrandtMEG Review Meeting, Malte Hildebrandt MEG Review Meeting Feb 2009 Drift Chamber System hardware status Run 2008 shutdown activities.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
HV connection for a Common GEM foil design Aiwu Zhang
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
DC56 Bi-weekly Meeting: DC5 Modifications September 3, 2013 Robert Heitz University of Illinois.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
T1 Electronic status Conclusions Electronics Cards:
Equipment for Assembly – UK Experiences
“MUON” Collaboration meeting
Unexpected Failures of Modules on Rods
MEG DC HV supply preamplifier noise and DRS Input attenuation
Outer Endcap External Bus tape
50% Written Exam Explained
Status report MEG DC 20/6/06 Test in COBRA Hajime,Matthias,Johny Peter : beam, Wataru : COBRA Necessary Modifications in DC.
Presentation transcript:

Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as requested in the „Presentation of the Committee recommendations to the spokespersons“ at this year‘s PSI Open User Meeting held in February, as well as, in your written report „Review of the MEG Experiment“. The most important message of this report is the first and direct observation of a discharge connected to the „HV via hypothesis“ ! This is a breakthrough as up to now these HV vias, which face the GND layer, were seen as the most plausible weak point, but these observations give clear evidence for such a hypothesis ! With the new pcb design, which was already presented at the review meeting, this weak point will be eliminated. Best regards, the DC Team

Malte HildebrandtDC Status Report, dc activities in lab helium cabin dc01 skeleton in „aquarium“ „via-sample“ in HV test box next steps

Malte HildebrandtDC Status Report, DC System in Helium Cabin The next transparency summarises the activities with the dc system in the helium cabin. The important observations after ~3 more months with helium operation since the end of last years run are: dc planes which needed to be operated with reduced HV settings at the end of run 2008 continue to deteriorate. even planes which were still fine at the end of last years run start to deteriorate.

Malte HildebrandtDC Status Report, DC System in Helium Cabin dc system in helium cabin dc system inside helium environment since Jan 16 th dc modules flushed since Jan 16th: helium since Jan 30th: helium / ethane operated with MEG dc HV system goal: investigate HV status compare with HV status at end of last years run identify characteristics of weak anode channels observations: „weak“ planes (run 2008) get worse „good“ planes (run 2008) start to deteriorate characteristics of weak anode channels: similar to dc01 in „aquarium“ (Jan / Feb) →further proof for our assumptions:HV problem related to exposure to helium (most likely) same reason for deterioration

Malte HildebrandtDC Status Report, dc01 Skeleton in „Aquarium“ The next transparency summarises the activities with the dc01 skeleton in the „aquarium“. The dc skeleton was operated ~2 months („equivalent“ running conditions) inside the „aquarium“. The most important observation is the discharge between HV via and GND layer on the bottom side of the HV pcb! There are some more transparencies to remind you about the „via hypothesis“.

Malte HildebrandtDC Status Report, dc01 Skeleton in „Aquarium“ dc01 skeleton:anode middle cathode anode (no hood cathode) since Feb 19 th mounted inside „aquarium“ Feb 19 th – Mar 6 th : helium (30 days) Mar 6 th – Mar 9 th :helium / ethane (3 days) Mar 9 th : HV tests („rather“ stable) Mar 9 th – Mar 20 th :helium (22 days) since Mar 20 th : helium / ethane (until Mar 30 th : 10 days) since Mar 23 rd : HV tests →Mar 30 th :dc01A: first direct / optical observation of discharges between HV via and GND surface on bottom side of HV pcb trip during night at 1850 V to match with exposure time of digital camera increase HV to 2000 V → characteristics of signals on oscilloscope same as in Jan / Feb when complete dc01 was tested in „aquarium“ but now: no hood, no G10 isolators ! →65 days „run conditions“ (up to Mar 30 th )

Malte HildebrandtMEG Review Meeting, HV Via top layer bottom layer +HV GND 7 mm

Malte HildebrandtMEG Review Meeting, dc01A no glue glue no glue

Malte HildebrandtMEG Review Meeting, PCB Cross Section GND +HV pcb +HV G10 isolator glue G10 isolator glue carbon frame air He / C 2 H 6 He pcb bottom layer top layer bottom layer

Malte HildebrandtDC Status Report, dc01A anode 3

Malte HildebrandtDC Status Report, dc01A anode 3

Malte HildebrandtDC Status Report, dc01A anode 2

Malte HildebrandtDC Status Report, dc01A anode 2

Malte HildebrandtDC Status Report, dc01A anode 3

Malte HildebrandtDC Status Report, dc01A anode 3

Malte HildebrandtDC Status Report, HV Print 2009 The next transparency explains some of the modifications which are already implemented in the design of the new HV anode pcb in order to avoid this weak point on the bottom layer. These changes were already presented in the review meeting in February, this is just a reminder.

Malte HildebrandtMEG Review Meeting, HV Print 2009 HV print 2009 traces for HV on middle layer → no HV traces on bottom layer only GND on bottom layer → individual layers with „only HV“ or „only GND“ (3-layer →4-layer pcb) „blind vias“ → vias have only necessary depth to connect appropriate layers (like „blind hole“) vias for +HV pads for resistors +HV traces outer edge print 2007 print 2009 inner edge GND

Malte HildebrandtDC Status Report, „Via Discharge“ The direct observation of discharges between HV vias and GND is the first „positive“ observation during all of these investigations. Up to now we had a long list of suspicious and possible weak points concerning the construction and operation of the drift chambers. Numerous tests during the last months have excluded step by step the „most common suspects“ from this list, with one main point remaining on the list: the bottom layer of anode HV pcb where the HV-via faces the GND-layer. The observation of these discharge is the first positive evidence during these investigations!

Malte HildebrandtDC Status Report, „Via Sample“ in HV Test Box Certainly, there are still some open questions. For example: why do the „via samples“ in the HV test box, which have no glue on the via copper ring not discharge immediately? Helium should penetrate rather fast, as there is an „open“ channel. The situation of the HV test box is summarised in the next transparency.

Malte HildebrandtDC Status Report, „Via Sample“ in HV Test Box 2 pcb samples installed in HV test box 1 st pcb: 3 vias without glue on via copper ring 4 vias with glue only on via copper ring 2 nd pcb:4 vias with glue on via copper ring and with glue in via hole since Mar 3 rd mounted inside HV test box flushed with pure helium interruptions:Mar 9 th (sealing of HV feedthroughs) Mar 14 th (sealing of GND on pcb) HV applied T = 40-45° C (partially off from Mar 16 th to 30 th due to broken heating blanket) → not yet a clear result → test will continue →50 days „run conditions“ (up to Mar 30 th )

Malte HildebrandtDC Status Report, „Via Sample“ in HV Test Box 2 pcb samples installed in HV test box 1 st pcb: 3 vias without glue on via copper ring →why are there no discharges ? GND +HV pcb G10 isolator glue +HV glue He pcb expected situation:

Malte HildebrandtDC Status Report, „Via Sample“ in HV Test Box There is one possible explanation for this situation: The edge of the GND layer may be somehow passivated with glue (as shown in the next transparency). This situation may be caused by the special way of applying the glue on the GND layer whereas the HV via copper ring is protected.

Malte HildebrandtDC Status Report, „Via Sample“ in HV Test Box GND +HV pcb G10 isolator glue +HV glue He pcb possible situation: 2 pcb samples installed in HV test box 1 st pcb: 3 vias without glue on via copper ring →why are there no discharges ?

Malte HildebrandtDC Status Report, HV Via To answer this question we prepared another „via sample“. It was ensured that the glue was not applied on the edge of the GND layer and the via copper ring.

Malte HildebrandtDC Status Report, HV Via protection with tape before application of glue free edges of GND layer after glueing

Malte HildebrandtDC Status Report, New „Via Sample“ in HV Test Box GND +HV pcb G10 isolator glue +HV glue He pcb new situation: new pcb samples installed in HV test box 3 rd pcb: 7 vias without glue on via copper ring and edge of GND layer

Malte HildebrandtDC Status Report, New „Via Sample“ in HV Test Box →observation: after a few hours of flushing the HV test box with helium we observe the discharges between HV via and (not passivated) GND edge. →conclusion: in case of the previous „via samples“ in the HV test box, most likely the edge of the GND layer is passivated with glue and consequently no discharges will occur! top layer of pcb is covered with (red) capton tape in order to isolate / shield HV and GND on top layer rectangular cut out of the capton tape to allow helium to penetrate through the via hole into the gap between HV via and GND layer discharge in via sample mounted in HV test box

Malte HildebrandtDC Status Report, Further Tests in HV Test Box →Even the new pcb design, which will be used for chamber construction, will avoid this weak point of HV via and GND layer, we will continue with tests in the HV test box to understand better the reason for the accumulation of helium in this gap between HV via and GND layer. This will also include tests concerning the relation of breakdown voltage and gas mixture / pressure inside this gap.

Malte HildebrandtDC Status Report, Next Steps The pcb with the modified layout is ordered and is expected to arrive in the week after Easter. There is a small delay compared to the schedule presented at the review meeting. This is caused by intensive discussions (e.g. with the experts from the Pisa group) about further potential modifications of the design in order to avoid any other possible weak point. A new test is planned which represents a cross section through the wing of a dc plane and the transition of anode frame - isolators - pcb - G10 isolator (small) - G10 isolator (wide) - hood frame in order to exclude a „hidden“ discharge problem within this sandwich structure due to unexpected polarisation effects. Immediately after the delivery of the new pcb two „new“ anode wire frames will be constructed (wires are already prepared on take-over frames). Together with recycled hood cathodes and middle cathodes two new dc modules will be assembled and they will be placed inside the „aquarium“ for a long term test. In parallel we will then continue the repair work of the remaining dc modules as presented at the review meeting.