GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration.

Slides:



Advertisements
Similar presentations
T1 status and plans INFN Genova November 2014 Collaboration Meeting.
Advertisements

Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
CMS GEM Workshop III, April 20, 2012
GEM Design Plans Jason Gilmore TAMU Workshop 1 Oct
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Gueorgui ANTCHEVNEC’2013 – Varna, Bulgaria 1 The TOTEM Experiment Consolidation and Upgrade G. Antchev * On behalf of the TOTEM Collaboration * INRNE-BAS,
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Overview of Production for CMS GE1/1
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
12-nov-2003Muon Plenary, R.Richter1 Status of MDT elx and services ON-chamber –mezzanines –ON-chamber cables –hedgehog boards –CSM Motherboard –CSM Daughterboard.
M. Bianco On behalf of the ATLAS Collaboration
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
Marcus Hohlmann (Florida Institute of Technology) with C. Armaingaud, S. Colafranceschi, R. De Oliveira, and A. Sharma (CERN) on behalf of the CMS GEM.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
DT UPGRADE STRATEGY M.Dallavalle for the DT Collaboration 6/26/12 Muon IB1.
Preparation for TS3 Mariana Rihl. Known issues Implications on light leaks on all modules – Visible on current feedback of bias – Confirmed by study performed.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
GEM Integrated PCB readout and cooling
OTMB Development and Upgrade Plan for LS2
“Medium Term”: VFAT2 + SRS readout system
HF “Slice test box” installation
L. Benussi On Behalf of LNF crew
Cables for the RE4 Upscope in CMS
University of Wisconsin
CMS GEM services: Cooling
Integration and Services RE3/1 and RE4/1
Rack Design Proposal as of 01/03/2013
Integration and Services RE3/1 and RE4/1
CMS Area Working Group Meeting
HF “Slice test box” fabrication and installation
On behalf of the GEMs for CMS Collaboration
CMS November Upgrade Week
GEM Upgrade Projects: Schedule
EMU Slice Test Run Plan a working document.
Chamber Design and Integration RE3/1 and RE4/1
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
Study of Chinese oil-less chamber
Pierluigi Paolucci - I.N.F.N. Naples
CSC Electronics Installation and Commissioning CSCE I&C
The digital read-out for the CSC system of the experiment TOTEM at LHC
B904 Status Report by Fred B.
on behalf of Barrel RPC Collaboration
Pierluigi Paolucci & Giovanni Polese
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
Needed for Team A on -End
Presentation transcript:

GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration

LS1 GE1/1 Super Chamber – Powering and Signals GEM Technical Review2 2 x HV Lines (8mm-diam) to USC 4 x LV Lines (10mm-diam) 4 x Fiber lines to USC GE1/1 PP To UXC YE-1 Tower 4 x Fiber lines to PP CSC TMB YE-1 X1 2 HV Lines to USC 4 LV Lines to UXC YE-1 Towers 8 Fibers (cable with 12 fibers) 4 lines to USC 4 lines to CSC TMB Via trigger tunnel 18/02/2013

Services for GE1/1 Project During LS1 I have to install and commission all the services needed for the CY2016 slice test Gas and Cooling are defined. Cables and connections are still under discussions. – HV lines – Defined OK – Fiber cables – Not defined yet. – LV lines – Not defined yet. – Cu Lines for control and signals – Not defined yet.

To Summaries In order to have the cable services installed in time we should freeze the floating points above very soon. Routing of spare lines can be an option. Once we declare our cable schema in front of the CMS coordinators there will be no change after.

Development of the Multilayer GEM PCB A small 30x30 cm^2 strips board was fabricated The design of a trial 30x30 cm^2 multilayer PCB is under way. A electrical diagram for the connections needs to be made ASAP. If the noise tests are showing no perturbation of the signal due to the VFAT digital activity we can launch the design of the full-size Multilayer GEM PCB for connections and Power.

30x30 cm^2 Test Board

Thank you