7.3.5 Student Book © 2005 Propane Education & Research CouncilPage 1 7.3.5 Identifying the Function and Characteristics of Draft Fans & Controls High efficiency.

Slides:



Advertisements
Similar presentations
Installing & Testing Regulators
Advertisements

7.3.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Components & Operating Characteristics of Wall Thermostats (Heat.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
Heating Control Devices
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
3.7.4 Student Book © 2004 Propane Education & Research CouncilPage Identifying Testing Procedures for Anhydrous Ammonia (NH3) Contamination Because.
4.1.9 Student Book © 2004 Propane Education & Research CouncilPage Sizing and Selecting Vapor Meters for Gas Distribution Systems Vapor meters.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
7.3.2 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Components and Operating Characteristics of Electronic Ignition.
1.1.2 Student Book © 2004 Propane Education & Research CouncilPage 1 A basic knowledge and understanding of propane’s physical properties and characteristics.
Unit 208: Central heating systems
Presented by: Terry Stohs Viessmann Manufacturing Company Inc.
Section 16.3 Using Heat.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
7.4.2 Student Book © 2005 Propane Education & Research CouncilPage Reading Electrical Control Circuit Diagrams In the course of repairing a gas.
Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.
4.1.7 Student Book © 2004 Propane Education & Research CouncilPage Selecting Regulators for Vapor Distribution Systems Regulators are mechanical.
4.1.6 Student Book © 2004 Propane Education & Research CouncilPage Designing Underground ASME Tank Installations A very important decision in designing.
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
STEAM HEATING.
Theory of Steam Generation P M V Subbarao Professor Mechanical Engineering Department Progressive Development of Power Generation through Steam Generation……
Pressure Switches. New modulating and multi-stage furnaces are more complex and require that installation instructions and procedures be followed so that.
7.3.1 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Operating Characteristics of Common Sensing Devices A sensing.
Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems
Gas Furnace Planned Maintenance
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
7.2.4 Student Book © 2005 Propane Education & Research CouncilPage Identifying Procedures for Measuring Current Between Two Given Points in an.
7.4.1 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Operating Characteristics of Circuit Control Devices, Electromagnetic.
In this module you will learn to:
1 Combustion Oil Fired Equipment. 2 OIL Combustion of oil fired equipment has the same basics of gas. Remember, Oil is a liquid and this must be converted.
2.3 Student Book © 2004 Propane Education & Research Council 2.3 Operating a Transport To Deliver Propane.
7.2.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Procedures for Measuring Resistance Between Two Given Points in.
5.1.? Student Book © 2005 Propane Education & Research CouncilPage 1 Selecting the pump for a propane dispenser should include a complete understanding.
7.1.3 Student Book © 2005 Propane Education & Research CouncilPage Applying a Systems Approach to Gas Appliance Troubleshooting Troubleshooting.
Student Book © 2004 Propane Education & Research CouncilPage Purging Vapor Distribution Lines & Appliances Purging is the controlled displacement.
3.4.7 Student Book © 2004 Propane Education & Research CouncilPage Examining Bulk Plant Electrical Systems Prevention of gas ignition in transfer.
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
7.3.4 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Components and Operating Characteristics of Limit and Fan Controls.
1 HVACR215 – Mechanical for Oil Oil Combustion. 2 Combustion The burning of a substance. Rapid Oxidation The burning of a substance. Rapid Oxidation.
Pressure.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
HVACR116 – Trade Skills Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems.
7.4.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Systematic Troubleshooting Techniques and Guidelines for Gas Operated.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
Why Maintenance Tasks are Important Produced by Joe Marchese.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
4.1.2 Student Book © 2004 Propane Education & Research CouncilPage Determining System Load and Customer Demand Profile Designing a satisfactory.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
3.5.6 Student Book © 2004 Propane Education & Research CouncilPage Verifying the Presence of Propane Odorant Drivers and plant unloading personnel.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Student Handout Packet – Page A7
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
HEAT-GENERATING EQUIPMENT INTRODUCTION SELECTION EFFICIENCY FURNACES BOILERS CENTRAL HVAC SYSTEMS.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – March 2011eere.energy.gov COMBUSTION BASICS HEATING SYSTEMS FOR ENERGY AUDITORS AND INSPECTORS.
Thermal power plant , panipat
Unit 13 Oil-Burning Equipment
Unit 7 Gas Heat: Natural and LP
Presentation transcript:

7.3.5 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Function and Characteristics of Draft Fans & Controls High efficiency appliances remove so much heat from the fuel gases that draft fans are needed to move the products of combustion through the appliance heat exchangers and venting system to the outdoors. In this module, you will learn to: 1.The function and characteristics of draft fans in high efficiency appliances 2.The function and characteristics of the pressure switch in the draft fan system

7.3.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Identifying the function and characteristics of draft fans in high efficiency appliances In the Basic Principles and Practices of Propane study course that you completed to start your propane certification studies, you were introduced to the phenomenon known as “latent heat of vaporization.” In the section that discussed physical properties of gases, it was stated that as water is heated, a thermometer will show the result of heat added to the water as a burner is turned up until the water reaches its boiling point. If the thermometer reads 212°F (100°C) at atmospheric pressure at sea level, no matter how much additional heat is added, the thermometer will not show a higher reading. The only observable outcome of the added heat is an increase in the boiling action. Scientists and engineers refer to this added heat as “hidden or latent heat” of vaporization.

7.3.5 Student Book © 2005 Propane Education & Research CouncilPage ? Combustion of propane or any fuel produces water vapor. This “boiled” water is a hot flue gas, and in conventional gas appliances, provides the energy for venting of the products of combustion. High efficiency furnaces and boilers use a second heat exchanger to recover the latent heat of vaporization by condensing the water vapor. As a result, the venting energy is reduced and must be replaced by a draft fan.

7.3.5 Student Book © 2005 Propane Education & Research CouncilPage 2 Figure 1. Diagram of a Condensing Furnace

7.3.5 Student Book © 2005 Propane Education & Research CouncilPage 1 The purpose of the draft fan is to ensure that the products of combustion will move through the primary heat exchanger, and through the secondary heat exchanger, and ultimately to a location completely outside of the building to be vented to the outside atmosphere. Most condensing appliances are readily identified because their venting systems and make up air intake piping are usually made up of PVC (or some other type of approved plastic) piping sections and fittings.

7.3.5 Student Book © 2005 Propane Education & Research CouncilPages 2 & 3 Identifying the function and characteristics of the pressure switch in the draft fan system Figure 2. Pressure Switch Assembly A pressure switch is connected to the draft fan by a sensing tube. The pressure switch confirms that the draft fan is producing a draft pressure sufficient to move flue gases through the heat exchangers to the outside atmosphere. In most condensing furnaces, the draft fan pressure switch is wired in series with a flame roll out switch, the blower fan limit switch and the ignition control module. This arrangement ensures that the draft fan is providing the required venting pressure or the entire system is shut down.

7.3.5 Student Book © 2005 Propane Education & Research CouncilPage 3 To test the operation of draft fan pressure switches, read and follow manufacturers’ instructions. Usually the instructions will call for the insertion of a tee fitting into the sensing tube, with the tee outlet tubing connected to a water column manometer. The manufacturers’ instructions will give the manometer pressure range required for normal operation. NEVER suck or blow on a pressure switch sensing tube—you may damage the pressure switch. Technical Tip A typical draft fan will supply air pressured to approximately 19 inches water column. Be sure that the manometer used to measure pressure is capable of measuring that pressure; typical u-tube water column manometers used for checking low-pressure gas regulator output may give the technician an unscheduled shower.

7.3.5 Student Book © 2005 Propane Education & Research CouncilPages 4 & 5 Time to See If You Got the Key Points of This Module… Complete the Review on page 4. See if you are ready for the Certification Exam by checking off the performance criteria on page 5.