Www.mimos.my © 2006 MIMOS Berhad. All rights reserved. MIMOS BERHAD TENDER BRIEFING ON THE APPOINTMENT OF CONSULTANT TO STUDY AND PROPOSE POWER QUALITY.

Slides:



Advertisements
Similar presentations
GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
Advertisements

Sistan & Balouchestan Electric Power Distribution Company
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
LAFA Food Distribution July 26, Introduction:
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Landon Roberts Lighting/Electrical Option 11/01/07 Medical Education Building Johns Hopkins University School of Medicine Electrical Systems Existing Conditions.
UPS Improvements to Beam Availability at the Australian Synchrotron Light Source Don McGilvery.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
2004 SUMMER UNIVERSITY WELCOME !. AGENDA Overview Granger Center Tour Central Heating & Power Plant Tour Grounds Tour Optional - General Services Bldg.
Armand Usher Electrical Engineer Intel Electronics Kiriat Gat Israel
1 Facilities Operations and Maintenance Overview Part 5 of 5.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Power Plant Construction and QA/QC Section 7.4 – Hydroelectric Generators, Transformers and Controls Engineering Technology Division.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Apr. 13, 2012 Local Organizing Committee J. Yu and A. White: Joint chairs C. Jackson UTA Pheno faculty F. Olness from SMU M. Jackymack: Secretariat V.
Computer Operations Group Data Centre Facilities Hitendra Patel June 2015.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Monthly Management Report Submitted By Facility Management Team
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
Lyndonville Electric Department Feasibility Analysis Review December 2,
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
LAFA Food Distribution
Monthly Management Report December Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Computer Centre Upgrade Status & Plans Post-C5, June 27 th 2003 CERN.ch.
Monthly Management Report March By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
Preliminary Solution Proposal For Data Center-Mumbai Modular Redundant Scalable UPS By Gamatronic Feb 2013.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
SYSTEM OF SELF-SUFFICIENCY OF ELECTRICITY IN PEAK HOURS The generation system has a design capacity of 7.24 MW, to operate during peak hours and during.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Introduction to Electrical Engineering. Be Prepared for Electrical Engineering Discussion Discuss what you (learner) know about electrical engineering.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
DRAKENSBERG PUMPED STORAGE SCHEME 29 June Unit 1-3 Generator Stator refurbishment (Tender: PS(DPS)2015/DJ/01) Clarification Meeting 29 June 2015.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
Interconnected Generation Preliminary Engineering Work Related to Fees.
Asahi Switchgear Products Ltd. (ASPL) is a joint venture between Hirose Co. Japan and ASABHANU Technical Services Ltd., (ABTS) India. Asahi is located.
Monthly Management Report September Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
West Cambridge Data Centre Ian Tasker Information Services.
Philip Mackey The Pennsylvania State University Architectural Engineering L/E Option HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Holy.
High Temperature Superconducting (HTS) Cable Project
Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution.
Anna FLESSA, Dipl.-Ing. Researcher of KEPA Aliki – Nefeli MAVRAKI, MSc. Researcher of Climate Change unit, KEPA National and Kapodistrian University of.
Progress Briefing - Energy Initiative
Electric Utility Master Plan Update
UMCP Learning Objectives
CERN Data Centre ‘Building 513 on the Meyrin Site’
Background B513 built in early 1970’s for mainframe era.
EN 4946 – Refurbishment of Electrical Substations
TECHjOSH.COM TechJosh.com.
Kosrae State Energy Action Plan Update
Design of Electric Power Systems and Utilities
Yangon Region Rural electrification plan
Maintenance at ALBA facility: Strategy for the conventional services
Electrical Distribution System Basics
ELECTRICAL HAZARD HSE LEARNINGS Always use insulated tools while working on live electrical equipment Contact MSE511 for further information or visit HSE.
Stoke Medical Centre RIBA Plan.
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

© 2006 MIMOS Berhad. All rights reserved. MIMOS BERHAD TENDER BRIEFING ON THE APPOINTMENT OF CONSULTANT TO STUDY AND PROPOSE POWER QUALITY UPGRADE AT MIMOS FAB MIMOS BERHAD 11 th Feb 2011

MIMOS CAMPUS : POWER DISTRIBUTION SYSTEM © 2006 MIMOS Berhad. All rights reserved. Version 2.0 Public Block East Block West Block Cafe Block Fab Entrance TNB SUBSTATION HT ROOM - MIMOS HT ROOM – FAB 2 HT ROOM – FAB1 HT ROOM –INTEC

© 2006 MIMOS Berhad. All rights reserved. Version

© 2006 MIMOS Berhad. All rights reserved. Version 2.0 PROBLEM STATEMENT PRESENT SYSTEM & LIMITATION -Electrical system - 2 x 11 kv feeders. Vulnerable to power quality incidents as 11 KV is not CLEAN -2 x 350KVA Diesel gen set for fab 1 and fab 2, are to support emergency lightings, scrubber and other emergency system -Small UPSs to support some critical production equipment. NO back up power for production A Switch board for Chillers and other facilities equipment under capacity

© 2006 MIMOS Berhad. All rights reserved. Version KV 630A VCB MSB 1 Transformer 1 11KV/433V 2.5MVA Feeder 2 Feeder 1 Transformer 2 11KV/208V 1.5MVA 415V 2500A ACB A ACB MSB 2 11KV 630A VCB PRODUCTION MCC MAIN DB UPW DB WW PLANT DB ESSETIAL FACILITY SUPPORT PRESENT POWER DISTRIBUTION AND UTILIZATION AT WAFER FAB 2 DB ETCH DB DVR DB LITHO DB DIFFUSION 1 DB DIFFUSION 2 DB THIN FILM 451KW 360KW 250KW 430KW 200KW 500KW 800KW 250KW 1.55MW 2.2MW NOTE : WAFER FAB 1 HAS SIMILAR CONFIGURATION. THE CURRENT LOADING IS LOW DUE TO NO PRODUCTION

© 2006 MIMOS Berhad. All rights reserved. Version 2.0 WHAT WE PLAN TO DO…. Undertake study to improve the power quality for wafer fab. To propose best option(s) with technically feasible cost effective measures Best practical implementation plan

© 2006 MIMOS Berhad. All rights reserved. Version 2.0 MCC MAIN DB UPW DB WW PLANT DB ESSETIAL DB WW PLANT 11KV 630A VCB 11KV 630A VCB 11KV 630A VCB Incomer Step down Transformer 1 11KV/433V 2.5MVA Feeder 2Feeder 1 Step down Transformer 2 11KV/208V 1.5MVA 415V 2500A ACB 208V 2500A ACB HT LT DB ETCH DB DVR DB LITHO DB DIFFUSION 1 DB DIFFUSION 2 DB THIN FILM PROPOSED UPGRADING OF THE POWER SYSTEM Gen set Batteries UPS

© 2006 MIMOS Berhad. All rights reserved. Version 2.0 Mandatory scopeOptional scope Preliminary Capacity study Proposals review Prepare tender document + drawings Tender evaluation Project management SCOPE OF THE TENDER PROCESS

© 2006 MIMOS Berhad. All rights reserved. Version 2.0 SITE VISIT DATETIME Friday 11 th Feb 11After tender briefing Monday 14 th Feb am Wednesday 16 th Feb am Thursday 17 th Feb am Assemble at MIMOS Lobby: Contact person : Kufad/ Norazri

© 2006 MIMOS Berhad. All rights reserved. Thank you FAB 1. The physical maintenance of system is carried out once every 2 years. In view of the current condition, it as recommend that the servicing and maintenance is carried out on yearly basis. There will be interruption to the FAB operation, but the plan maintenance is to minimize unplanned downtime, as a result of mechanical failure.