GridPP23 – Final Steps to Data David Britton, 8/Sep/09.

Slides:



Advertisements
Similar presentations
GridPP22 – Service Resilience and Disaster Planning David Britton, 1/Apr/09.
Advertisements

Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Oversight Committee Meeting.
Deployment metrics and planning (aka Potentially the most boring talk this week) GridPP16 Jeremy Coles 27 th June 2006.
Storage Workshop Summary Wahid Bhimji University Of Edinburgh On behalf all of the participants…
Project Status David Britton,15/Dec/ Outline Programmatic Review Outcome CCRC08 LHC Schedule Changes Service Resilience CASTOR Current Status Project.
RAL Tier1: 2001 to 2011 James Thorne GridPP th August 2007.
GridPP4 Oversight Committee Meeting 4th February 2010
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Oversight Committee Meeting.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP24 Collaboration Meeting.
GridPP From Prototype to Production David Britton 21/Sep/06 1.Context – Introduction to GridPP 2.Performance of the GridPP/EGEE/wLCG Grid 3.Some Successes.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP26 Collaboration Meeting.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP27 15 th Sep 2011 GridPP.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Oversight Committee 25.
UKI-SouthGrid Overview Face-2-Face Meeting Pete Gronbech SouthGrid Technical Coordinator Oxford June 2013.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Vendor Day 30 th April.
GridPP Steve Lloyd, Chair of the GridPP Collaboration Board.
D. Britton Collaboration Board Meeting David Britton 16/Jul/07.
Quarterly report SouthernTier-2 Quarter P.D. Gronbech.
D. Britton GridPP Status - ProjectMap 22/Feb/06. D. Britton22/Feb/2006GridPP Status GridPP2 ProjectMap.
GridPP Status Report David Britton, 15/Sep/09. 2 Introduction Since the last Oversight: The UK has continued to be a major contributor to wLCG A focus.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
Quarterly report ScotGrid Quarter Fraser Speirs.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
1 st EGEE Conference – April UK and Ireland Partner Dave Kant Deputy ROC Manager.
Overview & Status of the Middleware & EGI Core Proposals Steven Newhouse Interim EGI Director EGEE Technical Director 26/05/2016 Status of EGI & Middleware.
GridPP3 project status Sarah Pearce 14 April 2010 GridPP24 RHUL.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP28 17 th Apr 2012 GridPP28.
John Gordon STFC-RAL Tier1 Status 9 th July, 2008 Grid Deployment Board.
GridPP3 Project Management GridPP20 Sarah Pearce 11 March 2008.
Workshop summary Ian Bird, CERN WLCG Workshop; DESY, 13 th July 2011 Accelerating Science and Innovation Accelerating Science and Innovation.
Project Management Sarah Pearce 3 September GridPP21.
Tony Doyle - University of Glasgow 1 July 2005Oversight Committee GridPP: Executive Summary Tony Doyle.
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Computing for Particle.
LCG Introduction John Gordon, STFC GDB September 9th 2009.
11 March 2008 GridPP20 Collaboration meeting David Britton - University of Glasgow GridPP Status GridPP20 Collaboration Meeting, Dublin David Britton,
GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 8 February 2007 Outline Exec 2 Summary Grid status High level.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow PPAP Community Meeting Imperial,
25th October 2006Tim Adye1 RAL Tier A Tim Adye Rutherford Appleton Laboratory BaBar UK Physics Meeting Queen Mary, University of London 25 th October 2006.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
Multicore Accounting John Gordon, STFC-RAL WLCG MB, July 2015.
GridPP3 project status Sarah Pearce 24 April 2010 GridPP25 Ambleside.
Your university or experiment logo here The European Landscape John Gordon GridPP24 RHUL 15 th April 2010.
Ian Bird LCG Project Leader WLCG Collaboration Issues WLCG Collaboration Board 24 th April 2008.
UK Tier 1 Centre Glenn Patrick LHCb Software Week, 28 April 2006.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow UK-T0 Meeting 21 st Oct 2015 GridPP.
Alex Read, Dept. of Physics Grid Activities in Norway R-ECFA, Oslo, 15 May, 2009.
EMI INFSO-RI Accounting John Gordon (STFC) APEL PT Leader.
JINR WLCG Tier 1 for CMS CICC comprises 2582 Core Disk storage capacity 1800 TB Availability and Reliability = 99% 49% 44% JINR (Dubna)End of.
LCG Introduction John Gordon, STFC GDB July8th 2009.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI-InSPIRE APEL for Accounting John Gordon, Stuart Pullinger STFC.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
WLCG Status Report Ian Bird Austrian Tier 2 Workshop 22 nd June, 2010.
Status of GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
STFC in INDIGO DataCloud WP3 INDIGO DataCloud Kickoff Meeting Bologna April 2015 Ian Collier
HEPiX IPv6 Working Group David Kelsey david DOT kelsey AT stfc DOT ac DOT uk (STFC-RAL) HEPiX, Vancouver 26 Oct 2011.
Slide § David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
Accounting Update John Gordon. Outline Multicore CPU Accounting Developments Cloud Accounting Storage Accounting Miscellaneous.
UK Status and Plans Catalin Condurache – STFC RAL ALICE Tier-1/Tier-2 Workshop University of Torino, February 2015.
18/12/03PPD Christmas Lectures 2003 Grid in the Department A Guide for the Uninvolved PPD Computing Group Christmas Lecture 2003 Chris Brew.
Ian Bird WLCG Workshop San Francisco, 8th October 2016
HEPiX Spring 2014 Annecy-le Vieux May Martin Bly, STFC-RAL
Update on Plan for KISTI-GSDC
Readiness of ATLAS Computing - A personal view
John Gordon, STFC-RAL GDB April 8th 2009
UK Status and Plans Scientific Computing Forum 27th Oct 2017
GridPP4 Oversight Committee Meeting 4th February 2010
Presentation transcript:

GridPP23 – Final Steps to Data David Britton, 8/Sep/09

2 Since GridPP22 in April… Validated the UK infrastructure with STEP09. Moved the Tier-1 to R89. Procured new hardware. Exercised our disaster management process (several times!) 8/Sep/09 … and before GridPP24 at RHUL we will have data.

3 WLCG Growth March 2009 September 2009 >315,000 KSI2K

4 UK CPU Contribution Same picture if non-LHC VOs included 8/Sep/09

5 UK Site Contributions 2007 – NorthGrid: 34 – % London: 28 – % ScotGrid: 18 – % Tier-1: 13 – % SouthGrid: 7 – % GridIreland: 0 – 6 - 5%

6 UK Site Contributions: Non LHC VOs 8/Sep/09

7 CPU Efficiencies (CPU/Wall Time) 8/Sep/09

8 Storage Gstat gives: 8/Sep/09 September 2008March 2009September 2009 … the last set could actually be sensible!

9 Data Transfers 8/Sep/09

10 OPN Resilience 8/Sep/09

11 STEP09 Operations Report at wLCG MB; 16/Jun The lack of “hero-mode” is a direct consequence of all the (heroic) effort that has been put in over the last year to make the UK Grid more resilient. 8/Sep/09

12 More STEP09 Highlights I won’t preempt (too much) the upcoming talks… –RAL was the best ATLAS Tier-1 after the BNL ATLAS-only Tier-1 –Glasgow ran more jobs then any of the ATLAS Tier-2 sites throughout the world. –Most Tier-2 sites made good contributions and many gained valuable insight into tuning issues during STEP09 and subsequent testing. –“The responsiveness of RAL to CMS during STEP09 was in stark- contrast to many other Tier-1s.” –CMS noted the tape performance at RAL was very good as was the CPU efficiency. –Many (if not all) the metrics for the experiments were met, and in some cases, significantly exceeded at RAL during STEP09. 8/Sep/09

13 In the end, hand-over was delay from Dec to Apr 09. Hardware was delayed but we were (almost) rescued by the LHC schedule change. Minor (?) issues remain with R89 (Aircon-trips; water-proof membrane?) (GridPP22) Current Issues: R89 8/Sep/09

14 Tier-1 Hardware The FY2008 hardware procurement had to await the acceptance of R89. The CPU is tested, accepted, and being deployed (14,000 HEPSPEC06) The disk procurement (2.2 PB) was split into two halves (different disks and controllers to mitigate against acceptance risk). This has proved sensible, as one batch has demonstrated ejection issues. One half of the disk is being deployed; progress is being made on the other half and best guess is deployment by end of November. A second SL85000 tape robot is available. The FY09 hardware procurement is underway. 8/Sep/09

15 Disaster Management A four-stage disaster management process was established at the Tier-1 earlier this year as part of our focus on resilience and disaster management. Designed to be used regularly so that process is familiar. This means low-threshold to trigger Stage-1 “disasters” At Stage-3, the process formally involves stake-holders outside the Tier-1, including GridPP management. This has now happened several times including: –R89 aircon trip –R89 water leak –Disk procurement problem –Swine flu planning. The process is still being honed, but I believe it is very useful. 8/Sep/09

16 Tier-2 Performance Resource-weighted averages 8/Sep/09

17 Tier-2 Resources 1/Apr/09 8/Sep/09

18 - NGI EGI/NGI EGI UK-NGI Coordinating body in Amsterdam National initiatives in member countries GridPP NGS Involves STFC, EPSRC and JISC (at least) in the UK. EGI is vital to GridPP but it is not GridPP’s core business to run an e- science infrastructure for the whole of the UK: seek a middle ground. 8/Sep/09

19 Jigsaw Puzzle SSC EMI EGI Heavy Users SSC SSC (Roscoe) Unicore ARC gLite UK involvement with Ganga? UK involvement via the UK NGI with global tasks such as GOGDB, security, dissemination, training.... UK involvement with APEL, GridSite? … 8/Sep/09

20 Next Steps Oversight Committee meeting next week. –Approval for OPN resilient link –Confirmation of remaining GridPP3 spending profile –Some guidance on GridPP4? The LHC start-up, round-2 (Roger Bailey’s talk next!) Moving towards a UK NGI in the perspective of EGI, SSC’s, EMI, etc. (Monologue by John Cleese: “There will be a certain degree of uncertainty, of that we can be quite (long pause) … sure.”) Shaking down R89; Settling down for a long run. Tier-2 hardware allocations. GridPP4 … and data! 8/Sep/09

21 Summary and the Future LHC Data Oh god! STEP09 validated the UK infrastructure for LHC data-taking and proved that we are in good shape. We are building on this with careful tuning and further improvements to resilience and management processes. Great care must be taken not to invalidate the validation (but we cannot sit still either). Hand of god? Thoroughly deserved team effort which did not require (much) divine intervention. 8/Sep/09