THE DUFFY SCHOOL ADDITION & RENOVATION **Rendering of building supplied by Gary Gardner with Owner Permission Penn State AE Senior Capstone Project Jeremy.

Slides:



Advertisements
Similar presentations
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Advertisements

jackie eury senior thesis presentation lighting | electrical 15 april 2015 DENVER POLICE DPT. CRIME LAB.
| Michael Gallagher | Construction Management AE Faculty Consultant: Dr. Riley The Pennsylvania State University AE Senior Thesis Project.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
Penn State Architectural Engineering Senior Capstone Project Ramy Labna | Construction Option | Advisor: Prof Ray Sowers 2B + G + M + 7 Mansoura Development.
C AMPUS S QUARE H ARRISBURG, P ENNSYLVANIA A NDREW M ARTIN | C ONSTRUCTION M ANAGEMENT | A PRIL 12, 2010.
Kyle Goodyear BAE in Construction Management Pennsylvania State University Senior Thesis Presentation April 12, 2010.
Thesis by: Josh Raphael Architectural Engineering Construction Management Introduction  Personal and Building Intro Building Background  Building Size,
Ballenger East Building Final Presentation Design Development Architectural Engineering Senior Thesis Presentation 2009 Lighting / Electrical Option Student.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Senior Thesis Hotel and Convention Center Schaumburg Structural Option Eric Yanovich S tructural O ption S chaumburg H otel and C onvention C enter S.
Fisk Corporate Headquarters Houston, Texas Penn State AE Senior Capstone Project Stephen Blanchard – Construction Management Option Advisor: Dr. John Messner.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Adam Trumbour 2010 AE|CM Introduction Building Overview Thesis Overview Breadth Analysis 1: CHPS Study Breadth Analysis 2: Green Roof Breadth Analysis.
The Office Building Washington, D.C. Penn State Architectural Engineering Senior Capstone Project Brett Miller | Construction Option Advisor: Dr. Ed Gannon.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
GLOBAL VASCULAR INSTITUTE BUFFALO, NY PENN STATE AE SENIOR CAPSTONE PROJECT MADISON SMITH | CONSTRUCTION MANAGEMENT DR. RILEY – CM ADVISOR.
University Medical Center of Princeton David Bodnar Construction Management 2010 Senior Thesis.
CARDEROCK SPRINGS ELEMENTARY SCHOOL Bethesda, Maryland Joe Hirsch | Construction Management | Dr. Magent.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Research Facility Core and Shell (RFCS) Presented by Tim Maffett on April 8 th, 2013.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
H OTEL | N ORTHEAST U.S. J ORDAN R UTHERFORD | S TRUCTURAL O PTION F ACULTY A DVISOR | D R. T HOMAS B OOTHBY AE S ENIOR T HESIS | A PRIL 8, 2013.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
PRESENTATION OUTLINE: I. P ROJECT B ACKGROUND II. A NALYSIS # 1 : BIM I MPLEMENTATION 1. W AYS T O P AY F OR BIM 2. C REATING A BIM M ODEL III. A NALYSIS.
Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskey’s Senior Thesis The Pennsylvania State University Architectural.
N EW Y ORK, N EW Y ORK 100 Eleventh Avenue © Tyler E. Graybill | Structural Option AE Senior Thesis Presentation | April 12, 2010 Faculty.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Penn State Architectural Engineering Senior Capstone Project Quaid Spearing | Construction Option Advisor: Dr. Anumba April 15, 2014 South Halls Renovation.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Presented by Cameron Mikkelson April 16, 2014 Silverado Senior Living Brookfield, WI Analysis Topics On-site Prefabrication of Interior Wall Panels Installation.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
PENN STATE AE SENIOR CAPSTONE PROJECT Adam Lasher │Construction Management Dr. Robert Leicht Susquehanna Health Patient Tower Expansion Williamsport, PA.
North Hills Junior High School Pittsburgh, PA Senior Thesis Final Presentation 2005 Chris Rush Lighting / Electrical Faculty Consultant: Dr. Mistrick.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Harley-Davidson Museum Milwaukee, WI. Jonathan Rumbaugh, BAE/MAE Mechanical Option Advisor: Dr. William Bahnfleth.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Philip Mackey The Pennsylvania State University Architectural Engineering L/E Option HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Holy.
A MERICAN A RT M USEUM Northeast, United States Sean Felton | Structural Advisor: Sustersic AE Senior Thesis 2013.
AE Senior Thesis Natalie Bockhorst│Construction Management Chimay Anumba, PhD. PE Advanced Individual Training A.I.T. Barracks Fort Eustis, VA.
HAMAD ALRAHMANI ARCHITECTURAL ENGINEERING SENIOR THESIS PRESENTATION
Penn State AE Senior Capstone Project
North Hall | American University| Washington D.C.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Wrangle Hill Elementary School New Castle, DE
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
Presentation transcript:

THE DUFFY SCHOOL ADDITION & RENOVATION **Rendering of building supplied by Gary Gardner with Owner Permission Penn State AE Senior Capstone Project Jeremy Drummond Construction Option Advisor: anumba April 14 th, 2014

` J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP S OLAR P ANELS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP S OLAR P ANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS INTRODUCTION A NALYSIS 3 │P REFABRICATED E XTERIOR W ALL P ANELS P ROJECT O VERVIEW A NALYSIS 1 │ R OOFTOP S OLAR P ANELS A NALYSIS 2 │H ISTORICAL R EQUIREMENTS Googlemaps.com equipment/solar-panels/ Taken by Jeremy Drummond s.php

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW P ROJECT B ACKGROUND III. A NALYSIS #1: R OOFTOP S OLAR P ANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS PROJECT BACKGROUND General Building Information Building Name The Duffy School Addition and Renovation Location Florence, NJ Function Residential Size 70,593 GSF Height 3 Stories Cost $9.3 Million GMP Construction April ‘14- April '15 Delivery Design-Bid-Build  Building History:  Marcella. L Duffy School 1870  Expansion 1950  Closed 2008  Building Use:  Affordable Senior Citizen Apartments  53 New Units  Gym, Entertainment Center, Library, Doctors Office, Kitchen, Etc.

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP S OLAR P ANELS P ROBLEM I DENTIFICATION C OMPONENTS F EASIBILITY A NALYSIS E LECTRICAL B READTH I MPLEMENTATION & R ECOMMENDATION IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS Analysis #1 Implementing Rooftop Solar Panels

ENERGY COSTS J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS P ROBLEM I DENTIFICATION C OMPONENTS F EASIBILITY A NALYSIS E LECTRICAL B READTH I MPLEMENTATION & R ECOMMENDATION IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS  Proposed Solution:  Rooftop Solar Panels  Research Goal:  Different types of photovoltaic systems  Sunlight Properties  Cost vs. Schedule  Problem Identification:  Affordable Apartments  Apartment Amenities  Payment Method? panels/

SOLAR PANEL COMPONENTS J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS P ROBLEM I DENTIFICATION C OMPONENTS F EASIBILITY A NALYSIS E LECTRICAL B READTH I MPLEMENTATION & R ECOMMENDATION IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS  System:  Grid-tied system  4 rows of 9 panels (36 panels)  SunPower X Panel  UltraLITE Model ELU14000 Centralized Inverter  IronRidge XR1000  Placement:  New Addition  EPDM Roof  Inverter Location  AC panel and utility tie in located in RM Created by Jeremy Drummond

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP SOLAR P ANELS P ROBLEM I DENTIFICATION C OMPONENTS F EASIBILITY A NALYSIS E LECTRICAL B READTH I MPLEMENTATION & R ECOMMENDATION IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS FEASIBILITY ANALYSIS  Schedule:  Installation Process  Longest Task  Total Days  Cost:  Prices  Installation  Total- $69,270 Solar Panel Installation ItemQty.UnitHoursTotal Mount36Ea Rack4Per 9 Mounts0.753 Solar Panels36Ea.136 Inverter1Ea.44 Circuit Breaker1Ea.1.5 #12 AWG20LF0.510 #8 AWG6LF0.53 3/4" Conduit1153LF /2" Conduit42LF Solar Panel Cost ItemCostQty.UnitTotal Cost Mount$ Watt$1, Rack$ Ea.$1, Solar Panels$ Ea.$15, Inverter$5, Ea.$5, Circuit Breaker$ Ea.$ #12 AWG$ LF$ #8 AWG$89.236LF$ /4" Conduit$ LF$4, /2" Conduit$2.4442LF$ Solar Panel Installation$ Watt$39, $69,270.76

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP SOLAR P ANELS P ROBLEM I DENTIFICATION C OMPONENTS F EASIBILITY A NALYSIS E LECTRICAL B READTH I MPLEMENTATION & R ECOMMENDATION IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS ELECTRICAL BREADTH  Power Usage:  Receptacles  Lighting  Dryer  Washer  Refrigerator  Fireplace  Exercise Equipment  Shading:

Payback Period: Total Cost- $69, Panels kWh Electrical Rate Federal Cash Incentive J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP SOLAR P ANELS P ROBLEM I DENTIFICATION C OMPONENTS F EASIBILITY A NALYSIS E LECTRICAL B READTH I MPLEMENTATION & R ECOMMENDATION IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS ELECTRICAL BREADTH  Payback Period:  Total Cost- $69,270  36 Panels  kWh per day Output  Electrical Rate- $0.12  Payback Period:  Annual Energy Value- $3,559  Annual System Output-  11 Years

SOLAR PANEL IMPLEMENTATION J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP S OLAR P ANELS P ROBLEM I DENTIFICATION C OMPONENTS F EASIBILITY A NALYSIS E LECTRICAL B READTH I MPLEMENTATION & R ECOMMENDATION IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS  Recommendation:  Implement Rooftop Solar Panels  Potential Value Added:  Occupant Satisfaction  Profit after 11 years  NJ Green Checklist  Schedule Implications:  Design Phase: Implement Early  Design-Review meetings between project participants & end users  Changes can be costly to implement later in the project lifecycle  Construction Phase: During interior finishes  Schedule Impact:  18.5 Days  Cost Impact:  $69,270

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: ROOFTOP SOLAR PANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS C URRENT VS. P REFABRICATED F AÇADE P ANEL D ESIGN M ECHANICAL B READTH A NALYSIS P ANEL I MPLEMENTATION C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: PREFAB EXTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS Analysis #2 Historical Requirements

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: ROOFTOP SOLAR PANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS R EQUIREMENTS H ISTORICAL C ONSULTANT C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: PREFAB EXTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS REQUIREMENTS  Requirements:  Chalkboards  Trim  Tin Ceilings  Border  Panels Provided by Gary Gardner Construction

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: ROOFTOP SOLAR PANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS R EQUIREMENTS H ISTORICAL CONSULTANT C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: PREFAB EXTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS HISTORICAL CONSULTANT  Consultant:  Keystone Preservation Group  Location  Previous Projects  Cost???  Issue #1:  Current Storage  Item Movement  On-Site Containers Created by Jeremy Drummond Taken by Jeremy Drummond

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: ROOFTOP SOLAR PANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS R EQUIREMENTS H ISTORICAL CONSULTANT C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: PREFAB EXTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS HISTORICAL CONSULTANT  Issue #3:  Installation Issues  Labeling  Consultant  Issue #2:  Window Procurement  Schedule Delays  Consultant Provided by Keystone Preservation Group Taken by Jeremy Drummond Provided by Gary Gardner Construction

Comparision Summary ItemConsultant FirmNo Firm Fee$35,000x General Conditionsx$37,000 ScheduleSave 27 Daysx Total$35,000$37,000 Save $2,000 J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 IMPLEMENTATION  Final Conclusions:  On-Site Storage Container  Material Procurement  Labeling  Recommendation:  Recommend hiring The Keystone Preservation Group to do historical consulting for The Duffy School. P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: ROOFTOP SOLAR PANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS R EQUIREMENTS H ISTORICAL CONSULTANT C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: PREFAB EXTERIOR PANELS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: ROOFTOP SOLAR PANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS R EQUIREMENTS H ISTORICAL CONSULTANT C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: PREFAB EXTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS  Schedule Impact:  27 Days  Cost Impact:  +$2,000 Comparison Summary ItemConsultant FirmNo Firm Fee$35,000x General Conditionsx$37,000 ScheduleSave 27 Daysx Total$35,000$37,000 Save $2,000 Architectural Breadth

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS Analysis #3 Prefabricated Exterior Wall Panels P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP S OLAR P ANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS C URRENT VS. P REFABRICATED F AÇADE P ANEL D ESIGN P ANEL I MPLEMENTATION C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS  Opportunity Identification:  Time & Labor Intensive  Site Congestion  Weather Delays  Critical Path  Research Goals:  Identify alternative panel  Reduce schedule & cost  Reduce site congestion & trade coordination on site  Original Façade:  3.5” Brick on Wood Stud  Cost  Schedule  Proposed Facade:  9” Insulated Precast Panel  Embedded Thin Brick  Cost = $32/SF  Erection = 8 panels/ day P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP S OLAR P ANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS C URRENT VS. P REFABRICATED F AÇADE P ANEL D ESIGN P ANEL I MPLEMENTATION C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS FAÇADE COMPARISON Provided by Gary Gardner Construction Slenderwall.com

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS PANEL DESIGN  Panel Design:  Consistency & Transportation  Span Building Height  Maximum width 12’  Total 16 precast panels  4 different panel types Panel Installation Durations Elevation Panel QTY.DurationAdjusted Duration South 6.75 Days1 Day North 6.75 Days1 Day East 4.5 Days.75 Days Total 162 Days2.75 Days P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP S OLAR P ANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS C URRENT VS. P REFABRICATED F AÇADE P ANEL D ESIGN P ANEL I MPLEMENTATION C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS North South East Created by Jeremy Drummond

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS PANEL IMPLEMENTATION  Site Layout: Building Enclosure Construction Cost Comparison Material Total (SF) Prefabricated PanelsTraditional Brick Cost/SFTotalCost/SFTotal Exterior Face Wall6,200$32.00$198,400$10.47$64,914 Interior Components6,200$18.73$116,126$18.73$116,126 Insulation6,200$1.65$10,230$2.89$17,918 Caulking1,190$2.18$2,594.20xX TransportationxIncluded xX Erection EquipmentxIncluded x$35,026 Total$54.56$327,350$32.09$233,984 Cost Comparison Summary Item Prefabricated Panels Total Cost Traditional Brick Total Cost Cost of Assembly$327,350$233,984 General Conditions Cost$466,630$487,156 Total$793,980$721,140  Cost Implications: Difference + $72,840 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP S OLAR P ANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS C URRENT VS. P REFABRICATED F AÇADE P ANEL D ESIGN P ANEL I MPLEMENTATION C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS Created by Jeremy Drummond

J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 PANEL IMPLEMENTATION P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP S OLAR P ANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS C URRENT VS. P REFABRICATED F AÇADE P ANEL D ESIGN P ANEL I MPLEMENTATION C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS  Cost Implications:  Implement = Additional $6/SF  Interior Components Same  Vapor Barrier, Sheathing & Backup  General Conditions Savings  15 Days = $20,526  Final Conclusions:  16 Architectural Precast Panels  Schedule Reduction = 15 Days  Implementation Cost = $72,840  Recommendation:  Not in owner’s best interest to pursue  Increased cost and planning for implementation outweigh savings in schedule and building performance Created by Jeremy Drummond

CONCLUSIONS J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS IV. A NALYSIS #2: F AÇADE P REFABRICATION V. A NALYSIS #3: R EVALUATING C OMP. S LAB VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS A NALYSIS 1 │ R OOFTOP SOLAR P ANELS  Implement Rooftop Solar Panels  Save Cost  Help Occupants A NALYSIS 3 │ P REFAB E XTERIOR W ALLS  Would not recommend the prefabrication of the building’s facade  Increased Cost & Planning  Reduced Schedule A NALYSIS 2│ H ISTORICAL R EQUIREMENTS  Would hire an historical consultant firm  Reduced Schedule & Planning  Increased upfront Cost Provided by Gary Gardner Construction

ACKNOWLEDGEMENTS J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: R OOFTOP SOLAR P ANELS IV. A NALYSIS #2: H ISTORICAL R EQUIREMENTS V. A NALYSIS #3: P REFAB E XTERIOR W ALLS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS Architectural Engineering Faculty: Dr. Chimay Anumba (Advisor) Special Thanks to: My Family & Friends Alex Medvesky- Gary F. Gardner Dominic DeSantis- Gary F. Gardner Janine Owens- Conifer LLC. PACE Industry Members Industry Acknowledgements:

THANK YOU J EREMY D RUMMOND │ C ONSTRUCTION O PTION T HE D UFFY S CHOOL A DDITION & R ENOVATION April 14, 2015 P RESENTATION O UTLINE : I. I NTRODUCTION II. P ROJECT O VERVIEW III. A NALYSIS #1: V IRTUAL M OCKUPS I N -P LACE VS. V IRTUAL M OCKUPS V IRTUAL M OCKUP D EVELOPMENT V IRTUAL M OCKUP I MPLEMENTATION C ONCLUSION & R ECOMMENDATION IV. A NALYSIS #2: F AÇADE P REFABRICATION C URRENT VS. P REFABRICATED F AÇADE M ECHANICAL B READTH A NALYSIS S CHEDULE, C OST & S ITE L OGISTICS C ONCLUSION & R ECOMMENDATIONS V. A NALYSIS #3: R EVALUATING C OMPOSITE S LAB L IGHTWEIGHT VS. N ORMAL C ONCRETE S TRUCTURAL B READTH A NALYSIS P ROJECT I MPACTS C ONCLUSION & R ECOMMENDATIONS VI. F INAL R ECOMMENDATIONS VII. A CKNOWLEDGEMENTS Questions & Comments Provided by Gary Gardner Construction