Rural Electrification Access by Department of Rural Development

Slides:



Advertisements
Similar presentations
ClimDev-Africa Program & African Climate Policy Center (ACPC)
Advertisements

World Bank and SPS With special emphasis on the recently established multi-donor Standards and Trade Facility Cees de Haan Agriculture and Rural Department,
Ministry of Electricity and Energy General Authority for Rural Electricity Rural Energy Access Project OFF GRID RURAL ELECTRIFICATION Service Provider.
Ministry of Electricity and Energy General Authority for Rural Electricity Rural Energy Access Project OFF GRID RURAL ELECTRIFICATION Summary of The Project.
A case study of off-grid solar PV in South Africa Louise Tait and Gisela Prasad LCEDN conference 4 – 5 April 2012.
- P G Ajith kumara.  Introduce strong community/ business concept  Build capacity of non technical aspects  Build capacity of technical Aspects  Identify.
Project ideas for Mozambique Country Context Project 1. Integrated project of electrification using low cost technologies for rural villages and biomass.
The Renewable Energy Development in Cambodia
DEVELOPMENT AND ENERGY IN AFRICA CASE STUDY FOR ZAMBIA GVEP M&EED Meeting UNEP Risø Center 7 December 2006.
National Electrification Program Investment Prospectus (2015–2019) Draft Final Results Alex Sundakov, September 2014.
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Outline of JICA’s Assistance prepared for
Rural Electricity Access by MOLFRD
Financing renewable energies in Myanmar COMMITTEE 2 ON RENEWABLE ENERGIES AND CLIMATE CHANGE ADAPTATION.
A Bridge to Universal Energy Access
Kenya Climate Innovation Center, Nairobi, Kenya We support Kenyan small and medium enterprises (SMEs) that are developing innovative solutions that address.
Local Government Development Program and Poverty Reduction in Uganda: Lessons from Aid Policies Shuaib Lwasa Department of Geography Makerere University.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 11 Renewable Energy Module 11: DISTRIBUTED GENERATION: OPTIONS AND APPROACHES.
PRIVATE SECTOR LED OFF-GRID ENERGY ACCESS The A-B-C Business Model and How Third Parties Can Support the Development of Energy Access Solutions Feb 20,
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
1 An Investment Framework For Clean Energy and Development November 15, 2006 Katherine Sierra Vice President Sustainable Development The World Bank.
The NEP Workshop on Off-Grid Electrification in Myanmar
Environment and Energy Htun Paw Oo 1 June Content Environment and Energy Ecosystem services The role of energy Myanmar energy context Way forward.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
Distributed Power Opportunities in the Developing World Presentation to the Distributed Wind Energy Association F. Andrew Dowdy February 13, 2013.
GEF National Dialogue Initiative 20 – 21 November 2008, Monrovia, Liberia Alternative Energy Provision in Liberia Augustus V. Goanue Center for Sustainable.
A Bridge to a Sustainable Energy Future A B RIDGE TO U NIVERSAL E NERGY A CCESS Nay Pyi Taw March 20, Development of Myanmar National Electrification.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
OPPORTUNITIES AND CHALLENGES OF POLICY AND REGULATORY REFORMS IN THE POWER SECTOR IN UGANDA (Cogeneration Development and the Private Forestry Sector Participation.
Institutional Structures and Processes for High-Quality, Scaled Implementation Mini-hydro power for energy access Oliver J. Haas.
The NEP Workshop on Off-Grid Electrification in Myanmar Nay Pyi Taw, January 2015 South-South Cooperation to Power Rural Communities through Renewable.
Institutional Framework for Implementing Myanmar’s NEP Interim Options and Recommendations Alex Sundakov, March 2014.
1 Development of Renewable Energy Application in Vietnam Energy and Petroleum Department MINISTRY OF INDUSTRY.
Myanmar: Towards Universal Access to Electricity by 2030 Nay Pyi Taw, January 28, 2015.
Small Wind Systems in Village Power Applications Southwest Windpower, Inc. “Renewable energy made simple” Andrew Kruse.
ELECTRIFICATION FOR DEVELOPMENT C T Gaunt University of Cape Town.
DISPERSED RURAL POPULATION ELECTRICITY SUPPLY PROGRAM OF ARGENTINA Lic. Aldo FABRIS Coordinator for R&D Energy Secretariat Ministry of Economy and Public.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
ESCAP’S Pro-Poor Public-Private Partnership (5P) Approach Presented by: Mr. Kohji Iwakami, Economic Affairs Officer, EDD, ESCAP.
RURAL ELECTRIFICATION AND THE LOCAL ECONOMIC INTEGRATE SYSTEM IN MALI Berlin, 26 Februay 2013 Presented par Mahamadou K DIarra WORKSHOP MICRO- ENERGY INTERNATION.
Jie Tang Lead Energy Specialist South Asia Region, The World Bank
Missionary Electrification in the Philippines
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
MiniGrid Group NEP Off Grid Electrification Breakout session.
Global Environment Facility Climate Change 14 May 2004 Siv Tokle GEF Monitoring and Evaluation Unit.
Expert Group on New and Renewable Energy Technologies (EGNRET) USA: Village Power Opportunities and Challenges 20th Meeting of the APEC Expert Group on.
IRENA-ADFD Project Facility: Funds Available for Renewable Energy Projects in Developing Countries – November 2015 Seleha Lockwood Programme Officer, International.
Solar PV Tender Overview Ministry of Livestock, Fisheries and Rural Development Department of Rural Development Place - Sule Shangri-La Hotel Date- 4 -
0 National Inter-Ministerial Dialogue on Climate Change Cape Hotel Monrovia, Liberia June 25, 2009 Assessing and Developing Policy Options for Addressing.
INTERNATIONAL RENEWABLE ENERGY AGENCY IRENA Renewables Readiness Assessment Comparative Analysis Silia Kilepoa Ualesi Suva, Fiji Islands 13 November 2015.
VANUATU Renewables Readiness Assessment Report November 2015.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
1 Manufacturer’s Outreach Workshop, Thingaha Hotel, Naypyitaw Myanmar. October
Myanmar: Toward Universal Access to Electricity by Role of Minihydro Xiaoping Wang Senior Energy Specialist World Bank July 30, 2015.
Environmental Land Management and Rural Livelihoods Project (2013 – 2018) Project Overview Zafar Mahmudov, Project Coordinator.
Technology Options & Cost of Increasing Access to Electricity in Taraba State, Nigeria Uduak Akpan +, Salisu Isihak, and Sanusi Ohiare
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Current Electrified Villages Sagaing Region Townships - 11 Villages - 91 Households Kayin State Townships - 5 Villages Households
SOUTHERN AFRICA Sectors represented Water Energy Agriculture
This project is co-funded by the EU and the Government of Nepal
CURRENT STATUS - ENERGY TRANSITION
Off-grid Electrification Department of Rural Development
Regional Perspectives of Community-Based Energy
Development of a Solar Water Heater NAMA Concept Belize
U.S. Support for Village Power
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
ACCESS TO SUSTAINABLE ENERGY PROJECT
Yoichiro Ishihara Resident Representative
Presentation transcript:

Rural Electrification Access by Department of Rural Development Ministry of Livestock, Fisheries and Rural Development 30. 7. 2015

Outline of Presentation Overview of Off-grid rural electrification by DRD National Electrification Plan (Off-grid)

Relevant Ministries on Myanmar Rural Electrification Ministry of Livestock, Fisheries and Rural Development Vision: In Line with MDG, to develop rural area, to improve socioeconomic life of rural populace and to narrow down the development gap between urban and rural areas. Relevant Ministries on Myanmar Rural Electrification Ministry of Energy Ministry of Electrical Power Ministry of Industry Ministry of Science and Technology Ministry of Agriculture and Irrigation Ministry of Livestock, Fisheries and Rural Development

Systems of Rural Electrified Villages in the Entire Country 1.64% 35% 33.24% 25% 5% Systems of Rural Electrified Villages in the Entire Country Grid Line 35% Diesel Generator 25% Mini-hydro 5% Solar 33.24% Solar Mini-grid 0.11% Wind 0.01% Bio-mass, Bio-gas 1.64%

Implementations of Rural Electrification from 2012-2013 to 2015-2016 ( By Department of Rural Development ) Sr. FY Years Total Electrification Systems Budget Effective Villages Electric Solar Hydro-Power Biogas Diesel Engine (Million) Household Population 1 2012-2013 184  - - 2955.4 17616 93386 2 2013-2014 205 4 148 51 4328.3216 39670 185652 3 2014-2015 1689 84 1595 131 8 40599.974 207465 1034344 2015-2016 2308 223 139863 34 36298.623 146123 749098 4386 311 141790 216 11 84182.3186 410874 2062480

International Development Partners Project Name & Implementer/Owner Brief Description of the project, activities IDA (loan) Grant Implementation Period JICS Pilot Project   994 millions (JPY) 2014-2017 ICDF 350,000 (USD) 2014-2015 ADB CDTA 2 millions (USD) 2014-2016 ESCAP 322,050 (USD) 2013-2015 KFW 9 millions (EURO) 2015-2016 JICA 0.279 millions (USD) WB National Electrification Plan 90 millions (USD) 2016-2021

National Electrification Plan: Phase 1- (2016 – 2030) Objective: To achieve universal access to electricity in Myanmar by 2030 Leading Ministries MOEP Grid Extension MLFRD Off-grid

Least‐cost recommendation for 2030 • By 2030, the majority are grid connections • This represents 7.2 million households • Total cost is estimated at US $5.8 billion (US$800 per connection, average)

NEP - Phase 1 (2016-2021) IDA credit of $400 million by World Bank finance. Four Components Component 1: grid extension (IDA $300 million) Component 2: off-grid electrification (IDA $80 million); Component 3: technical assistance and project management (IDA $20 million), and Component 4: contingent emergency response (IDA $0).

Financial Allocation by IDA for Off- grid Electrification (Phase-1, 2016-2021) Mini-grid SHS Public Institution Technical Assistance Total (USD) Million WB’s IDA contribution (USD) Million 7 53 20 10 90

Component 2: Off-Grid Electrification (IDA $ 80Million) To target the communities unlikely to receive grid-based access ever or within the next 10 years. Technology neutral approach; MFLRD (DRD) to lead needs assessment at community level. Technology options include: solar photovoltaic (PV); mini-hydropower; wind; diesel; hybrid (e.g. diesel/solar). IDA finance will support: Solar photovoltaic devices or systems for a target of 465,500 households Mini-grids to serve some 35,500 households Electricity connections for 11,400 health clinics, schools and other community buildings and 19,000 public street lights

Component 2: Off- grid Mini-grid: (IDA$ 7million) Micro-hydropower Other mini-grid technologies such as biomass, biogas, solar and wind. Up to 1MW in capacity are eligible Solar Home System: (IDA$ 53million) Solar panel peak wattage (Wp) 20 40 60 80 Design 3 LED lights, cell phone 4 – 5 LED lights, cell phone, TV 5-6 LED lights, cell phone, TV 6-7 LED lights, cell phone, TV, fan Estimated cost for quality system (USD) 230 300 350 400

Public institutions potion: (IDA$ 20million) Public institutions potion target Schools, Clinics, Religious buildings and Street lighting Each affected village is assumed to have one school, one clinic, one religious building and five street lights. Connection Type System quantity Cost per system Equipment Cost Total 30,400 N/A $20million Schools 3,800 $1,000 $3.8million Religious building Health clinics $2,000 $7.6million Public (street) lights 19,000 $250 $4.75million

Component 3: Technical Assistance, Off-grid (IDA$10Million) Capacity building and training of the Project Management Offices. (Union, State/Region, district, township and village level, private sector) Improve the policy and regulatory framework. Standards, technology assessments and technical design, economics and financial analysis, environmental and social impact management, procurement and financial management, Strengthening project management

Financial Contribution for sub-components of Component 2 System DRD contribution (USD) Million WB’s IDA contribution (USD) Million HH contribution (USD) Million Total (USD) Million Mini-grid 7 11 25 SHS 53 20 126 Public Institution - Total 60 80 31 171

SHS - Under the National Electrification Plan’s National Geospatial, Least-Cost Electrification Plan.; and - Only households that did not receive SHS previously under DRD’s earlier SHS programs are eligible. - focuses on best available, price-competitive technologies from pico-photovoltaic units and solar kits up to large solar home systems of 100 watts peak (Wp). Indicative portion of system cost covered by grant, customer contribution, and financing during Phase I. Year 1 Year 2 Year 3 Year 4 Year 5 Portion of cost covered by project funds 90 % 87 % 85 % 82% 80% Portion covered by customer contribution 10 % 13 % 15 % 18 % 20 % C

Mini-grid - Micro-hydropower , biomass, biogas, solar and wind. - Hybrid systems that include a backup diesel generator are also eligible. Mini-grids up to 1 MW in capacity are eligible for support under the program. Site conditions - Clustered housing - Nearby stream of sufficient water flow and head in case of mini-hydropower - - Opportunities for productive-use loads Indicative portion of system cost covered by grant, customer and mini-grid business contribution, and financing during Phase I.   Year 1 Year 2 Year 3 Year 4 Year 5 Portion of cost covered by project funds 80% 60% 50% Portion covered by customer contribution 20% 40%

Public institutions 100% grant-funded systems for schools, religious buildings, and health clinics , street lightings in target villages where households solutions are provided Connection Type System Quantity Schools 3800 Religious Buildings Health Clinics Street Lightings 19,000 Total 30,400

Implementation Arrangements

Organization Structures National Electrification Executive Committee (NEEC) NEP( PMO) MOEP (PMO) MLFRD (PMO)

Announcing the program to Target villages In coordination with Union level (PMO) DRD office and Local government The district or township level DRD office informs the villagers at Local Township Development Committee meeting. DRD is ready to initiate a local program to make available SHS, mini-grids, or both SHS and mini-grids in the area. To inform the public of the process by which SHS and /or mini-grid will be deployed, household contribution and subsidy through media.

procedures for SHS Site, villages and projects selection Prioritizing villages Community organization and mobilization Opportunity to pursue a Mini-grid Household-by-household solar home system size selection process Customer SHS selection and collection of down payment VEC / DRD down payment receipt and village total number of systems of each type Public Facilities and Costing Technical Standards for SHS products Tendering and procurement Supply and installation, user training and supervision Compliance verification of installations O&M and spares services Monitoring of company performance

procedures for Mini-grids From pilot mini-grids to full implementation Village criteria for mini-grid eligibility Mini- grid size limits Mini-grid screening process Projects identified by developers Projects identified by DRD Technical Standards for Mini-grids Commissioning and training O&M and spares services

Mini-grid Screening Process Viable Needs further investigation Screening by PMO (union level) SHS Not viable Feasibility study Projects identified by developers List of Mini- grid project proposals Projects identified by DRD Pre-feasibility study PMO evaluation Not viable Mini-grid construction & commissioning Input from VECs Project proposals

Monitoring & Reporting Report indicators every six months – put into their system. Reports – every 6 months need to send financial management report. Combination of record keeping, report generating, field visits and discussion meetings.

Budget Allocation for NEP, Off-grid Electrification Fiscal Year (2016-2017) System DRD budget USD World Bank (IDA) Community USD (Million) Total Estimated (HHs) Remark 36 million 18 million 6 million 60 million   SHS - 58 million 165714 350USD/HH Mini-grid -  2 million 2500 800USD/HH Technical Assistance 2 million 

Project Benefits Access to electricity (estimated 6 million people by 2021). Reduced cost of electricity supply. Enhanced well being through electricity for lighting in houses and streets, telecommunications and entertainment. Enhanced income generation opportunities and potential productivity improvements. Prioritization of connections for health clinics, schools, religious buildings and community centers. Strengthened institutional capacity of implementing agencies, including public and private sector agencies and organizations active in the grid and off-grid components. Improved participation of community members in decision-making processes for rural electrification. Strengthened capacity of Village Electrification Committees (VECs).