INDE 6332 ENGINEERING PROJECT MANAGEMENT Homework Project University of Houston Dept. of Industrial Engineering Houston, TX 77204-4812 (713) 743-4195.

Slides:



Advertisements
Similar presentations
Trawler. Seamar Marin Trawler – 31 Main Specifications Build Year 2011 Category Class B Type Trawler L.O.A m Beam 3.20 m Material GRP Cabin 1 Master.
Advertisements

Fishing Boat. Seamar Marin Fisherman – 6.70 m Main Specifications Build Year 2011 Category Class C Type Fishing L.O.A Beam 2.30 Material GRP Cabin.
Grain Handler U.S.A..
MAINTENANCE PLANNING AND SCHEDULING
Approved by DC-E USCG AuxA, Inc BOATING SKILLS AND SEAMANSHIP Lesson 1 Which Boat is For You.
Greenhouse Structures
Cylinder Design Cylinder Liner (Barrel) Design
Big Pond Tank Mobile, Reusable Construction/Frac-Water Storage.
SABOT Standardized Auxiliary Boat Operations Training Ninth District - Eastern Region COMO. Lew Wargo, Sr. DSO-OP/CQEC 12 April 2014 ANSC 7003.
INDE 6332 ENGINEERING PROJECT MANAGEMENT Homework Project University of Houston Dept. of Industrial Engineering Houston, TX (713)
ME 441 Senior Design CUA Hovercraft – Class of Joe Cochrane, Aldo Glean, James McMahon, Omar Monterrubio, Kalin Petersen ME 441 Semester Summary.
Stanley HP-1 Compact Power Unit.
200,000 sq ft Manufacturing 40,000 sq ft Engineering / Administration Office 200,000 sq ft Manufacturing 40,000 sq ft Engineering / Administration Office.
Let’s Learn About Bridges
100 guests 185 feet in length Beam 40’ Built 1970 Builder: American Marine Corporation 1995, completely remodeled Refurbished in December 2008 Cruising.
Horticulture Science Lesson 42 Exploring Greenhouse Structures
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
Heads Under Pressure Snowmobile Head Design Team Members: Peter Britanyak, Nick Harker, and Chris Tockey.
Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
Office Designs The Design Process at Work © MS Office Suite.
Approved by DC-E USCG AuxA, Inc Boating Skills & Seamanship Lesson 10 Powering Your Boat.
Development and Quality Plans
Boat Orientation Objectives: Identify parts of various boats List hull types and shapes List Vessel Classes Define Types of Motors Define Capacity Plate.
Engine Types and Uses.
Boating Skills And Seamanship 1 Copyright Coast Guard Auxiliary Association, Inc. Which Boat Is For You? Chapter 1.
Flexible Manufacturing System
Introduction To Engineering Bike Lab #1 - 1 Agenda Overview of the Bicycle Labs.
Miguel Nunes Information Systems Project Management IS Project Resources.
Hydroponics What is Hydroponics?
Page 1 Walk Through the 2011 Recreational Boating Statistical Abstract Section 1 Boating Population 1.Participation Estimates Participation Study.
MultiMedia by Stephen M. Peters© 2002 South-Western Operations Management.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Designing Goods and Services and Process Selection
Shipping Agenda Part 1. Introduction, Nomenclature, Major shipping companies Part 2. Charter - Voyage, time and others Part 3. Deck maintenance Part. Engine.
Conquering Complex and Changing Systems Object-Oriented Software Engineering Chapter 1, Introduction to Software Engineering.
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Team Members ? ? Chintan Goswami Nirav Tank Project Guide ? ? Mrs. Darshana H. Patel [Internal] Mr. Manish I. Vora [External]
1 Evaluation Of Evaporative Emissions From Pleasure Craft June 27, 2007.
Designing Goods and Services Chapter 3, Part 1. Operations and Operations Strategy Designing an Operations System Managing an Operations System Done We.
Part 3 Managing for Quality and Competitiveness © 2015 McGraw-Hill Education.
INDE 6332 ENGINEERING PROJECT MANAGEMENT CHAPTER 3 Part 2 University of Houston Dept. of Industrial Engineering Houston, TX (713)
Chapter 3 Dr. Bahaa Al-Sheikh & Eng. Mohammed Al-Sumady Intoduction to Engineering Introduction to Engineering Design 1.
1 Chapter 19 The Integrated Campaign. 2 What is Integrated Marketing Communications (IMC)? Integrated Marketing Communications is the practice of unifying.
What is a greenhouse structure?
Designing Goods and Services and Process Selection Chapter 3.
CARB Meeting Jim Hardin Grady-White Boats Greenville, NC April 12, 2006.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
In the name of Allah the Most Gracious the Most Merciful.
Designing Goods and Services and Process Selection
Cruise Planning and Cruising Course Chapter 3 Equipment and Systems United States Power Squadrons ® Instructors and Students Please Note: Post-release.
Bavaria 37 SH Bavaria 37 SH is a charter motoryacht 2008 model with less than 140 engine hours in excellent condition inside & outside Based in Leukas.
Designing Goods and Services Chapter 3, Part 1. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work.
Greenhouse Construction. What is a greenhouse? Structure enclosed by glass or plastic that allows light transmission for the growth of plants.
Silver Medallion IRB Driver PUAEQU001B Prepare, maintain and test response equipment PUASAR014A Operate and maintain a small powercraft and motor for rescue.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
ENTREPRENEURSHIP SABIR MALIK LECTURE 07. The Marketing Plan.
Brokered by Scruton Marine Services 1 PV2250 $299,000 USD.
1 Seamanship Chapter 2 The Boat. 2 Learning Objectives This lesson acquaints you with: This lesson acquaints you with: identity of boat types identity.
Maintaining internal combustion engines During maintenance routines, it is almost impossible to inspect internal components of the engine. This makes.
POWER PLANT ENGINEERING( )
Maintenance Scheduling
M/y Blue moon Sunseeker Martinique 39’.
Teknologi Dan Rekayasa
NSBE Space SIG Conference Call
MAINTENANCE PLANNING AND SCHEDULING
Leo Associates Services
Chapter 1, Introduction to Software Engineering
Exploring Greenhouse Structures
Let’s Learn About Bridges
Presentation transcript:

INDE 6332 ENGINEERING PROJECT MANAGEMENT Homework Project University of Houston Dept. of Industrial Engineering Houston, TX (713)

AGENDA l Group Homework/Project

YOUR GROUP PROJECT l A series of connected homework projects l Application of most of the concepts covered in class l You will be given time in class to coordinate project efforts l Each team to consist of 4 heterogenous team members l Each week your team will rotate project managers among the group members

PROJECT BACKGROUND l Conduct all the necessary project activities to select and modify a small power boat suitable for conducting daytrip scuba diving charters l Ultimately Determine n What type of boat configuration to select n Identify what components are needed n Identify what resources are needed n Determine the project plan including sequencing n Perform budget and cost estimation n Identify a means of monitoring the project progress n Etc. l Will need to use the Internet to perform project research

INITIAL PROJECT DESIGN DECISIONS l Size… l Hull material… l Engine… l Layout… l Many other design decisions, but we have to draw the line somewhere

SIZE l What size? l Must be big enough to conduct operations n Minimum capacity is 2 crew and 6 passengers l Popular range of sizes for these types of boats n feet l Bigger is more expensive to buy and cost more to berth and maintain

ENGINE l HP? n Appropriate for the boat size n Bigger engines costs more and uses up more fuel n Fuel tank size l Type of engine? n Outboard Gasoline - cheaper, external obstruction n Inboard Gasoline - cheaper to buy n Inboard Diesel – safer, more durable, cheaper to run l Number of engines? n Single-weigh less, consume less fuel n Twin- more reliable

ENGINE Gasoline Outboard Gasoline Inboard or Diesel Inboard

HULL MATERIAL l Which material? l Fiberglass n Cheapest material and easiest to make n Blisters, but does not corrode n Easy to repair l Aluminum n Most costly material and most difficult to make n Does not blister, but can corrode n Difficult to repair l Steel n More costly material and more difficult to make n Heavy – can only build larger boats n Does not blister, but corrodes n Easy to repair

LAYOUT DESIGN l Determine cabin and cockpit spaces l Cabin and cockpit sizes are complementary l Percentage of each? l What is needed in each…

LAYOUT DESIGN l Cabin n Protection from elements n Head – fresh water system l Cockpit n Equipment preparation area n Benches n Tank holders n Shower n Ladder

LAYOUT DESIGN