San Leandro Creek Hazardous Tree Removal Project Project Purpose 1998 “El Nino” knocked down over 200 hazardous trees Over 30 reports of property damage.

Slides:



Advertisements
Similar presentations
Current Tukwila Tree Policies & Regulations. Comprehensive Plan Goals and Policies Related to Trees/Landscape (1) Vegetated hillsides and freeway corridors.
Advertisements

What do you think? 1.Removal of water loving species like sycamore and willow or aquatic plants is the best way to increase stream flow. True or False.
TA Environmentally Sensitive Areas. Current Features: 1.Floodways, 100 yr 2.Floodplain, outside floodway, 100 yr 3.Jurisdictional Wetlands 4.Stream.
Treading Lightly on the Shore The Role of Residents and Developers in Keeping Lakes Healthy.
Urban Forest Hurricane Recovery Program
Presented by Julia Flanagan: County Arborist, Dept. of Public Works.
PLANTING NATIVE SPECIES Introduction to Watershed Science Merritt College Marc Epstein, Instructor.
Riparian Plants of the Bear Creek Watershed December 2009.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING October 29, 2014|3:00PM -5:00PM | ROOM 1E-113.
RECOGNIZING TREE HAZARDS. Introduction  Trees are an important part of our world. However, trees may be dangerous. Trees or parts of trees may fall and.
  Physical injury to the trunk and crown – construction equipment can injure the above-ground portion of a tree by breaking branches, tearing the.
Succession Review Answer Key.
Invasive Non-native Plant Management: Bear Creek and Hwy 95 Intersection Problem invasive species included kudzu. Invasives threatened walnut plantation.
The savanna (savannah) A medium energy Biome (Grassland Biome)
Coastal Live Oak Size-Class Distribution - Planting for Sustainability LA132-Computer Applications in Environmental Design Clients: Richard Trout & Janet.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING October 15, 2014|3:00PM -5:00PM | ROOM 1E-113.
IMPACTS OF CLIMATE CHANGE ON FORESTRY INDUSTRY Presented by Jude Tabi Forestry Department.
Estimating Tree Failure Risk Along Connecticut Utility Right-of-Ways Helen Poulos Wesleyan University Ann Camp Yale School of Forestry and Environmental.
Raster models in GIS What is GIS modelingWhat is GIS modeling Why GIS modeling Why GIS modeling Raster models Raster models Binary models Binary models.
Stormwater Quality Enhancement
Environmental Management Plan. Background Environmental Impact Assessment has made commitments to: –Meet defined standards –Implement defined mitigation.
Mount Sutro Open Space Reserve Proposed Demonstration Area Project 1 March 24, 2010.
Vegetation Establishment. Exposed soil occurs on all construction sites.
Storm Recovery David V. Bloniarz USDA Forest Service
Balancing Fire Hazard Reduction and Sensitive Resources in Suburban Forests and Open Space PLACER COUNTY PARKS DIVISION FIRE HAZARD REDUCTION PROGRAM Placer.
Lifecycle of a Tree. Lifecycle of Trees How to Measure & ID Week 1 Day 3 It is important that students understand the biology of trees to further be aware.
Environmental Quality Incentives Program (EQIP) Grazing – Our Most Commonly Used Conservation Practices.
Seedling Seed Sapling Mature Oak Snag. Like all living things trees have a life cycle: Birth Growth Aging Death.
R. Staib, RHIC Dec 061 Water Sustainability in Sydney’s Rouse Hill Development Area Past Practices, Future Plans Dr Robert Staib.
Urban FIA Data-- FIA core variables General stand and site characteristics Tree and sapling measurements, health, and condition Seedling data Derived estimates.
Tar-Pamlico Watershed Assessment. Proposed Water Quality Improvement Projects Improvement project types Model scenarios Targeted projects Stakeholder.
10/16/03Bohanan/Niemi/Wachtel1 Experimental Design & Motivating Student Questions Robert Bohanan, Center for Biology Education WEEB II.
Natural Hazard Mitigation Association 1 Storms Over the Urban Forest: Part 1 – Natural Hazards Management Planning Prepared for Alliance.
Desktop Analysis Used To: Identify areas that meet certain criteria (e.g. contig forest 50 acres+, id gaps as well, or set lower value in urban area) Identify.
Vermont’s Future Forests Sandy Wilmot Forests, Parks & Recreation.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
August 2009 Presented By: Tim Brodeur The Benefits of Keeping our Native Beauty Intact - Area IV Water Conservation Committee Model Native Plant Ordinance.
By Victoria wix October 28, 2014 Environmental science Period 3.
Treatments and methods to manipulate stand structure suitable for fuel reduction.
Overstory Vegetation Overstory Vegetation 2008 MOFEP PI Meeting John Kabrick and Randy Jensen.
Background The negative environmental and economic effects of invasive plant species are now widely appreciated. However, just 100 years ago, exotic plant.
Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.
Improving Outdoor Classrooms for Education and Recreation 91-C MN DNR SCHOOL FOREST PROGRAM CONSERVATION CORPS MINNESOTA.
Tropical Morphology How Plants Adapt Rain Forest The University of Georgia College of Agricultural and Environmental Sciences Root & Stem Structures Specialized.
Polepick DNR Salvage Sale. Polepick debris flows and flooding Waypoint 120.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
TREE MANAGEMENT WORKING PARTY 19 October Tree Management Working Party 1.Welcome Introduction of Staff and Committee Representatives.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Trees Click to Begin: Bark Leaves Trunk Roots. Leaves Live Oak –Notice the leaf structure Click here for sycamore leaves Click here for palm leaves Return.
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
Dudley R. Hartel, Center Manager Eric Kuehler, Technology Transfer Specialist John Slater, Arkansas U&CF Partnership Coordinator Urban Forestry South Athens,
Twin Peaks – Mt. SutroTwin Peaks – Mt. Sutro Connector Trail Community MeetingConnector Trail Community Meeting February 2, 2016February 2, 2016.
 Provide many social, environmental and economic benefits.  They provide 10,500 hectares of recreational space, improve air quality, control flood waters,
SEASONS ASHLEY MIDDLEBROOKS.  Content Area: Science  Grade Level: Kindergarten  Summary: The purpose of this instructional PowerPoint is to help the.
Students type their answers here
Adapted by Project Greenscape Coordinator LITTORAL SHELF PLANTING Collier County Growth Management Division - Natural Resources Department 2800 North Horseshoe.
1 Presented to the City Council By the Planning and Development Department November 11, 2008 PROPOSED AMENDMENTS TO LANDSCAPING ORDINANCE.
School of Chemistry and Chemical Engineering QUB 1 Phosphate removal from water using dolomites and constructed wetlands Professor Stephen Allen & Dr Gavin.
MASON GULCH LANDSCAPE MANAGEMENT PLAN PUBLIC MEETING August 4, 2016.
Intermediate Use Areas: Considerations and Tools
Mary Sisock, Ph.D. UVM Extension Forestry
FOR 350 Silvicultural Terminology Review
Tree Inspections for Real Estate Transactions
planipennis) Management Plan for the Gordon Natural Area
Prairie Restorations, Inc.
Water Reclamation Plant Feasibility Study Update
Self-Organizing System
TNT – Targets and Trees Vince Urbina ISA Certified Arborist
Mountain Meadows of the North Cascades
Presentation transcript:

San Leandro Creek Hazardous Tree Removal Project Project Purpose 1998 “El Nino” knocked down over 200 hazardous trees Over 30 reports of property damage since 1999 Over 400 hazardous trees identified in San Leandro Creek

The Project Removing 42 Hazardous trees from District owned properties Planting 350+ native plants Preserving over 60 mature native trees within project limits San Leandro Creek Hazardous Tree Removal Project

Project Locations Trees are being removed from District owned properties only Three Locations: 10 trees at Huff Ave. 11 trees at Cary Dr. 22 trees at St Mary Ave.

Project Schedule Construction will begin in early August Trees will be removed by the end of September or early October Restoration will occur at the beginning of the wet season San Leandro Creek Hazardous Tree Removal Project

Questions and Answers San Leandro Creek Hazardous Tree Removal Project

Location San Leandro Creek Hazardous Tree Removal Project Project Locations on District Owned Property District Owned Property

San Leandro Creek Hazardous Tree Removal Project CEQA Compliance - Categorically Exempt Environmental Considerations

IPIP Invasive Plants San Leandro Creek Hazardous Tree Removal Project Native Oaks struggle to survive under the canopy of the invasive non-native Blue Gums.

Invasive Plants San Leandro Creek Hazardous Tree Removal Project Native Oaks thrive in the absence of invasive Blue Gum

San Leandro Creek Hazardous Tree Removal Project No Water Quality Control Measures No Preservation of Existing Native Species No Enhancement of Riparian Corridor Improper Tree Removals

San Leandro Creek Hazardous Tree Removal Project Tree Evaluation Characteristics Species Indigenous Diameter Class Number of Trunk Height Class Condition Rating Crown Class Position in the Slope Slope Aspect Vines on Trunk Indigenous Saplings Failure Potential Target

San Leandro Creek Hazardous Tree Removal Project Failure Potential Criteria Tree Structural Characteristics Presence of Decay/Defect Weight Distribution in the Crown Lean Previous Failures within the Tree Whole Tree Failure Nearby Exposure to Wind Steepness of Slope

San Leandro Creek Hazardous Tree Removal Project Site 1 – Huff Ave

San Leandro Creek Hazardous Tree Removal Project Site 2 – Cary Ave

San Leandro Creek Hazardous Tree Removal Project Site 3 – St. Marys Ave