Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Slides:



Advertisements
Similar presentations
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 4 December 2008 Martin Postranecky Matt Warren, Matthew Wing.
Advertisements

● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.
First developments of DAQ\Trigger for RPC 30 October, 2002 General layout of OPERA DAQ\Trigger Naples activity Conclusions Adele Di Cicco Naples RPC Groups:
ATCA LLP CARRIER BLOCK DIAGRAMS LAST UPDATE 09/05/2007.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
ATCA LLP CARRIER BLOCK DIAGRAMS LAST UPDATE 09/05/2007.
Selection Board PRR G. Avoni, I. Lax, U. Marconi INFN Bologna PRR, 13/6/06.
Overview of the current TDR system Introduction Electronics for instrumentation TDR core : Metronome, ADC, Merge Data Handling Pete Jones, University of.
Prometeo Workshop (Valencia) November 17-18, 2011 A. Boujrad NUMEXO2 Mother Board Design Status Exogam Collaboration Abderrahman BOUJRAD GANIL France.
Pete Jones University of Jyväskylä INTAG Workshop GSI, Germany May 2007 Status of digital electronics at JYFL Pete Jones Department of Physics University.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Coupling an array of Neutron detectors with AGATA The phases of AGATA The AGATA GTS and data acquisition.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
Trigger-less and reconfigurable data acquisition system for J-PET
Manfred Meyer & IDT & ODT 15 Okt Detectors for Astronomy 2009, ESO Garching, Okt Detector Data Acquisition Hardware Designs.
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Napoli October 2007 WG3 - Pierre Edelbruck FAZIA WG3 – Front End Electronics.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Instytut Fizyki Jądrowej im. Henryka Niewodniczańskiego Polskiej Akademii Nauk Electronics for PARIS Searching for optimum solution Piotr Bednarczyk.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
M. Labiche - INTAG workshop GSI May Se - D prototype for the focal plane of the PRISMA spectrometer (Task4) Digitisers for SAGE & LISA (task1)
NEDA collaboration meeting at IFIC Valencia, 3rd-5th November 2010 M. Tripon EXOGAM2 project Digital instrumentation of the EXOGAM detector EXOGAM2 - Overview.
Coupling Neutron Detector array (NEDA) with AGATA The AGATA Front-End processing Electronics & DAQ The AGATA Trigger and Synchronization (GTS) Coupling.
Status of the CSC Track-Finder Darin Acosta University of Florida.
CERN Real Time conference, Montreal May 18 – 23, 2003 Richard Jacobsson 1 Driving the LHCb Front-End Readout TFC Team: Arek Chlopik, IPJ, Poland Zbigniew.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Agata Week – LNL 14 November 2007 Global Readout System for the AGATA experiment M. Bellato a a INFN Sez. di Padova, Padova, Italy.
22nd February 1999Ian Lazarus NPG, CLRC1 TDR for data processing 22nd February 1999 Ian Lazarus Nuclear Physics Group CLRC, Daresbury Lab.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
AGATA The Advanced Gamma Ray Tracking Array Ancillary Detector and Integration W.G. Status of the Working Group and Tasks A.Gadea.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
DAQ/Trigger System proposal for the Angra Neutrino Detector Herman Lima Jr (18 May 2006) Centro Brasileiro de Pesquisas Físicas.
AGATA: Status of the Implementation and Performance A. Gadea (IFIC, CSIC-Univ. Valencia) for the AGATA collaboration.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
DATA PROCESSING Working Group Digitisation P. Medina Pre-processing hardware I. Lazarus Pre-processing algorithms W. Gast Global Trigger and SynchronisationM.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
Agata Week – LNL 14 November 2007 LLP ATCA Carrier Status M. Bellato on behalf of the LLP Carrier Working Group.
 Digitisation P.Medina  Pre-processing I.Lazarus GTSM.Bellato GTSM.Bellato  PSA P.Desesquelle R.Gernhäuser 7 th AGATA Week, Uppsala, July 8-11, 2008.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
NEDA collaboration meeting Neutron and light charged particle detector-arrays as complementary detectors for the future European large gamma-arrays AGATA,
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
SPIRAL2 Andrea Triossi INFN - LNL Gaspard – Hyde – Trace Workshop October , Padova.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
DAQ Requirements M. Villa 21/02/2011.
The Data Handling Hybrid
Front-end and VME / VXI readout electronics for ASICs
Production Firmware - status Components TOTFED - status
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
Status of the Design & Development of the AGAVA interface module.
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Ch. THEISEN – CEA Saclay MUSETT: the segmented Si array for the focal plane of the VAMOS spectrometer Ch. THEISEN – CEA Saclay.
Presentation transcript:

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule & cost Ch. Theisen for the ADWG

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Goal Integration of ancillary detectors electronics with Agata Provide an interface  As many ancillary detectors as possible !

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Context When: for the demonstrator phase (2007) Where: Ganil, GSI, JYFL, Köln, LNL Who: Existing and/or identified ancillaries  ADWG meeting 22/06/2004  LUSIA, FRS, RFD, Neutron Wall, CUP, VAMOS, PRISMA, GREAT,…, γ arrays  List to finalize a.s.a.p…

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb LUSIA FRS RFD Neutron Wall

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb CUP VAMOS PRISMA RITU/GREAT

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Specifications  Correlate ancillaries with Agata (event number and/or clock counter)  Event filtering Keep relevant Agata and ancillary det. events “Slow-down” Agata Reduce ancillary det. dead-time  Interaction with AGATA GTS

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb How –LUSIAVME –FRSVME –RFDVME –Neutron WallVME –CUPVME –VAMOSVME –PRISMAVME –GREATVME –γ arraysVME  VME INTERFACE

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Interface with GTS GTSAncillary Trigger Request Val/Rej, Clock Val/Rej : combination of ancillary/Agata : “master”, “slave”, “mixed” modes Latency times  NOT A TRIGGER MODULE !

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Latency times Val/Rej : latency > 7μs Too late for most converters  Dead time !  Need prompt pre-trigger  Request to ADP : Agata prompt signal

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Global scheme Ancillary Front-end Ancillary Readout VME interface Trigger Request Val/Rej Clock counter Event Number GTS supervisor Agata Merge/ Ancillary post-merge Agata flow Agata prompt signal

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Three modes “Slow” conversion mode (common dead time) “Fast” conversion mode (parallel-like) Trigger-less (TDR)

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Slow conversion mode Trigger_Request Local_Trigger Local_Trigger_Tag Busy ADC conversion Validation_Rejection_Tag Interface VME Cycle Event_Number TR LT TAG Busy Val/Rej Val/Rej TAG Trigger_Validation or Trigger_Reject Only if trigger validated

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Busy2 “Fast” conversion mode”: parallel like Trigger_Request Local_Trigger Local_Trigger_Tag Busy ADC conversion Validation_Rejection_Tag Interface VME Cycle Event_Number TR1 LT1 TAG1 Busy1 Val/Rej1 Val/Rej TAG1 TAG2 LT2 TR2 Val/Rej2 Val/Rej TAG2 Trigger_Validation or Trigger_Reject

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb TDR (JYFL) mode Correlated data (DSSD, Gas) : Trigger request Uncorrelated data (Tunnel, Focal plane Ge…) No events: only data  Time Stamping Clock counter correlation ! TDR clock counter GTS clock counter  Embedded TDR data source

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb TDR mode Interface provides 100MHz clock Embedded TDR data source –Phase calibration –Time-stamp synchronisation –Time-stamp alignment  Interface with TDR metronome  Shark link

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Design: layout Mezzanine FPGA Optical fiber Ethernet I/O Jtag Bus Backplane memory Ethernet Shark

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb VIRTEX - II PRO XC2V7 FF672 (396 I/O) VIRTEX - II PRO XC2V7 FF672 (396 I/O) BANK_4 BANK_1 BANK_0 BANK_6 BANK_7 BANK_5 BANK_3 BANK_2. CR_CON1 CR_CON2 GTS_JTAG LSA_Trace_GTS CPU_TraceGTS LSA_Trace_VME CPU_TraceVME P1_VMEP2_VME Data Bus – [32] Address Bus - [31] Address Modifier – [6] Adr_, Data_Str – [3] LWORD, WRITE – [2] DTACK, BERR – [2] IRQ – [4] IACK,IN,OUT –[3] SYSRESET – [1] VXI -- [36] ? [3] TOTAL: [120] Front Panel Drive/Conv FRONT Trigger Request Local Trigger Veto Reject Validate Backpreasure LEDs CCLK [2] Inspection [4] ESTIMATE [20] SDRAM Ethernet POWER Shark-link [7] Metronome [4] Trigger_Req [1] Local_Trigger – [1] Trigger_Val/_Rej – [2] Local_Trig_Tag – [8] Clock_deskew – [6] GTS_Clock – [2] Val/Rej_Tag – [8] LLP_Status – [8] GTS_Status – [8] MSG_Out(Str) – [8(+1)] FPGA_Progr – [6] TOTAL: [75] LSA_Trace - [36] CPU_Trace – [16] Clock_IN – [2] Bcast_in(Str) – [8(+1)] TOTAL: [73]

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Schedule Main task: Krakow + Ganil (tests, real time soft.), Padova (GTS), Daresbury (TDR)

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Cost 2 prototypes : 6 k€ Production : 2.5 k€ /cards *6 = 15 k€ Prototypes + Production = 21 k€ + GTS Mezzanines 2.3 k€/board Total = 34.8 k€ with 6 mezzanines = 29.4 k€ with 4 mezzanines

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Common dead-time vs. Agata Losses ! Ancillary: Common dead-time Agata: Full parallel Future (post-demonstrator): switch to parallel read-out

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Conclusions Preliminary specifications ready We need feedback; contact us ! Mailing list: please register ! Web site (  GSI official site)

Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Contributors D. Bazzacco, P. Bednarczyk, M. Bellato, P.J. Coleman-Smith, A. Czermak, B. Dulny, A. Gadea, R. Isocrate, P. Jones, L. Olivier, V. Pucknell, Ch. Theisen, G. Wittwer, M. Zieblinski