WBEA Passive Sampler Validation Study for NH3 and HNO3 Operation of the dual-channel Annular Denuder System (ADS)

Slides:



Advertisements
Similar presentations
Introduction to Pneumatic Components Build a Working Pneumatic Circuit
Advertisements

Baxter AS-40 Syringe Pump
Filter Changing Procedures For TEOM Series 1400ab and Model 8500 FDMS (B & C Types)
Analyzer flow (30 lpm) Carbon vane pump Exhaust filter System vacuum gauge Spare#1 (30 lpm) Spare#2 (30 lpm) Spare#3 (30 lpm) Spare#4 (30 lpm) Blower#1.
Congratulations! You have just installed the Presentation Game Add-In.
MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
Lokotrack ST352 Presentation
 1) The front coach lights are controlled by the photo switch.  2) Water heater breaker is labeled.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Pneumatic Systems (Part 2)
Module 6 : Flow control valves
AUDIO VISUAL TRAINING University Center. BLACK BOX EQUIPMENT IN CLASS University Center LCD Projector/Built In Screen Laptop Connection (VGA Cord) Control.
FoamPro 1600 Series Fully automatic Class A foam ONLY
VGA Input Cable Connect to the VGA jack on the back of the laptop Connect to VGA Input 1 on the back of the projector.
Simple Pressure Control Valves
FACSAria The basic parts
BE-2110i VF/WIDEBAND TRANSMISSION TEST SET OPERATING OVERVIEW Slide 1 of 9.
Filter manifold Holding tank Iron- manganese filter Aeration tank Control unit Pre- filter To storage tanks Backwash overflow SO2 vent Bypass Cutoff valve.
Nitric Oxide Set-up for Patients on Ventilator
2025 Partisol Sequential Sampler
AccuMax Single Point Injection Operation (See Installation and Operation Manual for detailed instructions)
1. Pump down the chamber from the atmosphere pressure 2. Using RHEED to obtain diffraction images 3. Open the RHEED chamber or venting from high vacuum.
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
Nitric Oxide Set-up for Patients on Ventilator
Equipment Familiarization Amatrol 850 Basic Hydraulic Training System
AccuMax Multi-Point Injection Mechanics
Electrical Measurements: Meters
Mass Flow Controller Calibration The following slides show how to calibrate mass flow controllers using a flow reference cell and a PID controller. This.
Pump is Blue part (right) - timer is black (left side) New Electrical Outlet This Photo shows where the Re-Cir pump is installed on the Output line on.
Left side compressor behind Left control box Right side compressor behind Right control box.
1 MUST HAVE SHOULD HAVE COULD HAVE Module # 140. Practical Class Exercise’s, 2 nd session Objectives: Know how to: –Setup a Flowmeter –add Channel based.
Lihdat  Manual for Lihdat (single sample processing)
Using a Multimeter McTigue Junior High Technology Ed. Click Here
Cressington 208 HR Sputter coater
Diagnostics – Quaternary Pump & Fraction Collector Analytical 920 LCSemi-Prep 940 LC.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
Content  1 Component  2 repair instruction  3 How to define problem  4 How to repair  5 How to disassemble  6 PC part  7 Button and Ports.
Engineer Training Pneumatic System Overview. Engineer Training Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:  Y Pistons.
Using a Marantz All information provided will be demonstrated in class.
1 THE VICTOR READER WAVE ● Plays DAISY books as well as music and books on MP3 or audio CD ● Powerful navigation features ● Go directly to any page number.
Lesson Using Pneumatic Systems. Interest Approach Can you explain how air makes a pneumatic hand tool work?
Electrical Circuits.
CHAPTER Fuel Pumps, Lines, and Filters 22 Copyright © 2016 by Pearson Education, Inc. All Rights Reserved ADVANCED ENGINE PERFORMANCE DIAGNOSIS Advanced.
HYDRAULICS & PNEUMATICS
LCMS-325 TQ Operation Chem 115 Paul Hrvatin Winter 2013.
Log in, you will see this:. To look at Cranberry Juice Drinkers: 1) open the folders on the left:
Original CPC Box schematic
Automotive Heating and Air Conditioning, Fifth Edition By Tom Birch © 2010 Pearson Higher Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ.
AUDIO VISUAL TRAINING Wilkins Theatre-Black Box. BLACK BOX EQUIPMENT IN CLASS Black Box LCD Projector/Built In Screen Laptop Connection (VGA Cord) Control.
Sound Mixing Basics. The columns on the left side are alike or very similar Each column represents a sound source The columns are called channels.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
NN-CS596S Steam Microwave Oven. NN-CS596S Oven Specification.
Texas Skyward User Group Conference Helpful Hints Jennifer Speulda.
Flow Controls Controls speed by metering the air into or out of an actuator Fixed Orifice Variable Orifice.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Quick Start Guide for Flex Flow Pump
14 Refrigerant Recovery, Recycling, and Recharging.
Power meter SB-DN-PM1P03 SB-DN-PM3P02.
Medela Symphony Breast Pump
ATM 322 – Pneumatics Module 4
The BioTector B3500ul TOC analyzer Process Tests
सोलर पॅनेलचा उपयोग करुन रीचर्जेबल टॉर्च बनवणे.
Diagnostics Analytical 920 LC Semi-Prep 940 LC
Filling of SAPPHIRE 25 & 42 Bar Systems (TFPP Hardware)
Presentation transcript:

WBEA Passive Sampler Validation Study for NH3 and HNO3 Operation of the dual-channel Annular Denuder System (ADS)

ADS Pump Operation Pump control settings at front panel of ADS pump box

ADS Channel Flow Control Connect brass tee with quick-connect fitting to port labeled Vacuum 1 (not as depicted!). Vacuum 2 will be closed per front panel setting. Needle valves at each of the two tee branches allow fine adjustment of sample flow through each ADS channel. Each channel’s total sample volume is measured by a dry test meter (DTM). Connect black sample tubing from each channel (left hand side in photo) via quick- connect adapter to each needle valve and make note of the corresponding ADS channel. Back panel of ADS pump module

ADS Monthly Sample Volume Before sample start, use BIOS Drycal (or similar flow reference) and set each channel’s ambient flow rate to 2.0 lpm by adjusting the needle valve. Check nominal 2.0 lpm after initial setting. Read displayed value of each channel’s dry test meter (DTM) before connecting it to the needle valve. Record the DTM readings and start time. Perform weekly readings (next slide). At end of 1 month’s sampling, record the DTM readings and stop time.

Weekly Sample Flow Checks 1.Elapsed timers (only channel 1 is active) 2.Timer reset buttons (reset monthly) 3.Vacuum gauge (indicates loaded filter) 4.Circuit breakers 5.Pump controller from slide #2 6.Volumetric flow control (set to >4 Lpm) 7.Display of actual flow rate in Lpm (channel 1 only, since OUT2 = Off, see slide #2) 8.Read/Set point toggle switch (should always be in “Read” mode) 9.Radiant shield for accurate T measurement needed for MFC density correction On a weekly basis, read each channel’s sample volume displayed on DTM units and note in log with reading date/time and displayed flow rate (# 7 above).