27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) Overview April 27, 2006.

Slides:



Advertisements
Similar presentations
Introduction to CAD/CAM/CAE
Advertisements

ISO Implementation and Processor Validation Keith Hunten, P.E. Lockheed Martin Aeronautics April, 2002 ESA-NASA Workshop
16 May06 1 Integrated Shipbuilding Environment 4 (ISE 4) Demonstration Overview Presentation for Seattle NSRP Panel Meetings May 16, 2006 Ron Wood Burt.
Statistical Metadata Driven eForms Oleg Volguine Assistant Director Technology Services Division Australian Bureau of Statistics.
27 Apr ‘06 1 STEP translator for distribution systems for ShipConstructor ISE-2 & ISE-3 follow-up CATIA V4 to ShipConstructor piping demo ShipConstructor.
Development of ISE Interoperability Modules
Building an Operational Enterprise Architecture and Service Oriented Architecture Best Practices Presented by: Ajay Budhraja Copyright 2006 Ajay Budhraja,
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
1 Autodesk’s Manufacturing Solutions Kvalitetssikring i engineering processen Mads Storgaard.
Open Cloud Sunil Kumar Balaganchi Thammaiah Internet and Web Systems 2, Spring 2012 Department of Computer Science University of Massachusetts Lowell.
Private Cloud: Application Transformation Business Priorities Presentation.
Computer Aided Design, Manufacturing & Measurement Integration August Coordinate Measurement System Committee Albuquerque, New Mexico Richey-McIvor-Sandwith.
Ship Common Information Model (SCIM)
Annual SERC Research Review - Student Presentation, October 5-6, Extending Model Based System Engineering to Utilize 3D Virtual Environments Peter.
Managing Data Interoperability with FME Tony Kent Applications Engineer IMGS.
MAHI Research Database Project Status Report August 9, 2001.
Long Term Retention of Product Model Data
KPI Business Pack Christa Fine Sr. Product Manager, Information Delivery.
Vice President, Engineering NSRP Executive Director
Interim SCIM and STEP Implementation 2008 NSRP System Technology Panel Project Ted Briggs, Intergraph Corp. Mike Olson, Northrop Grumman Information Systems.
Reuse and Data Module Code Naming Considerations Mike Olson, Northrop Grumman IT Ted Briggs, Intergraph Integrated Shipbuilding Environment (ISE) ISE-6.
Agenda  Contract issues?  Review AP 214 Linkage mechanisms  Review external reference mechanisms  Populate PDM schema  Next Steps.
Publish Your Work BIM Curriculum 04. Topics  External Collaboration  Sharing the BIM model  Sharing Documents  Sharing the 3D model  Reviewing 
U.S. Department of the Interior U.S. Geological Survey NWIS, STORET, and XML National Water Quality Monitoring Council August 20, 2003.
Leveraging Oracle Data for Web- Based Reporting Northern California Oracle Users Group May 2001.
December 15, 2011 Use of Semantic Adapter in caCIS Architecture.
THE GITB TESTING FRAMEWORK Jacques Durand, Fujitsu America | December 1, 2011 GITB |
Integrated Shipbuilding Environment
Integrated Logistics Environment (ILE) NSRP Joint Panel Meeting 7 – 9 December 2010 New Orleans, LA 1 Presented by: Michael Olson Northrop Grumman Technical.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael.
27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) ISE4 Project Demonstration April 27, 2006.
1 Improving Interoperability through the use of ISO Presented by : Ron Wood Date:August 25, 2005.

STEP Shipbuilding Demonstration Highlights Integrated Shipbuilding Environment 4 (ISE 4) 26 June 2006 Ron Wood.
U.S. Department of the Interior U.S. Geological Survey NWIS, STORET, and XML Advisory Committee on Water Information September 10, 2003 Kenneth J. Lanfear,
1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented.
XML & Mediators Thitima Sirikangwalkul Wai Sum Mong April 10, 2003.
Navy Ship Advanced Modeling & Simulation - NSRP Projects Navy Ship Advanced Modeling & Simulation - NSRP Projects.
1 Integrated Logistics Environment (ILE) Project Presented by : Dr. Burton Gischner Date:May 3, 2011 NSRP Joint Panel Meeting San Diego, CA.
30 April Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE-6 Final Demonstration Overview.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
Leading Edge Architecture for Prototyping Systems An Overview.
Overview of the DON XML Vision, Policy, and Governance Bob Green & Stephanie Gernert Office of the Dept. of Navy Chief Information Officer (DON CIO)
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
3 February Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE Overview Presentation (to.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
NMI End-to-End Diagnostic Advisory Group BoF Fall 2003 Internet2 Member Meeting.
Interim SCIM and STEP Implementation 2008 System Technology Panel Project Ted Briggs, Intergraph Mike Olson, Northrop Grumman Ron Wood, Northrop Grumman.
1/22/08 RTR Project Presentation to TPTF RTR Project Michael Daskalantonakis & Brian Cook.
Ken Youssefi Mechanical Engineering department 1 Introduction to Concurrent Engineering Computer Aided Design (CAD) Computer Aided Manufacturing (CAM)
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005.
30 April Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE-6 Final Demonstration Overview.
ISE4 Integrated Demo Ver 2 May 11, ISE4 Integrated Demo2 Revised Arrangements Demo Scenario Design agent –Export AP 216 hull form Navy –Import hull.
ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD.
Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): Integrated Logistics Environment.
November 4, An Integrated Logistics Environment for an Effective Shipbuilding & Supporting Enterprise Prepared by: Dr. Burton GischnerElectric Boat.
The next generation in cadastral mapping - MUNSYS Presented by Colin Hobson California Cadastral Mapping Association, Conference of.
1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
1 S HIP T ECH 2011 A S HIPBUILDING T ECHNOLOGIES I NFORMATION E XCHANGE Total Ownership Cost/Quality/Energy Efficiency Completion and Validation of the.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
1 Long Term Retention of Product Model Data Ben Kassel Naval Surface Warfare Center Carderock Division Distribution Statement A : Approved For Public Release;
ISWG / SIF / GEOSS OOS - August, 2008 GEOSS Interoperability Steven F. Browdy (ISWG, SIF, SCC)
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
Overview of CATIA V5.
Company Profile.
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
Modern Graphics Communication
DCN# Jamie Breakfield R&D Project Manager/Systems Engineer
Presentation transcript:

27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) Overview April 27, 2006

27 Apr ‘06 2 ISE Background First NSRP major systems technology project Phase 1: Requirements definition and architecture for shipbuilding systems interoperability »March 1999 to December 1999 Phase 2: Deployment for Structure & Piping »March 2000 to December 2003 Phase 3: Deployment for HVAC & CPC Interfaces »October 2003 to October 2004 Phase 4: Current Project –Deployment of Ship Compartmentation –Deployment for Engineering Analysis –Prototype for Electrical –Prototype, Steel Processing with Rules Processing »April 2005 to July 2006

27 Apr ‘06 3 ISE Project Approach Develop and demonstrate tools that are low cost –can be selectively used by shipyards to support interoperability –capitalize on XML and related Internet technologies Flexibility is critical –allow shipyards to transform their data to/from common information model Drive development of international shipbuilding product data standards (e.g. STEP, PLIB) –Construct a single Shipbuilding Information Model –Demonstrate and educate U.S. shipbuilding community –Now approved international standards

27 Apr ‘06 4 ISE Architecture Accessible to large and small shipyards –Only system dependency is Web infrastructure –Utilizes open standards Innovative integration of STEP and XML technologies –Supports sharing of geometry & geometric product models Permissive (mediation) architecture –Lets each enterprise choose its own tool set Incorporated into CAD platforms used by U.S. shipbuilders ISE architecture represents an innovative, practical solution to the information interoperability challenge

27 Apr ‘06 5 The Navy and Shipbuilders Are Using Product Model Data Technology Product Model Data = 3-D CAD + definitions + other documentation Continued investment is key indication of value

27 Apr ‘06 6 This ship is used to locate and retrieve torpedoes and missile drones. It has a maximum payload capacity of 42 long tons which includes the deck cargo plus full liquids, full complement, and normal stores. This ship was selected because it is in-service, has a complete set of drawings available for distribution, and is: Approved for Public Release: Distribution Unlimited. The ISE Test Ship - TWR 841

27 Apr ‘06 7 Team Participants

27 Apr ‘06 8 ISE2 Demonstration 2 LEAPS 3 IntelliShip 1 FlagShip Foran SafeHull Supplier Parts Lib S IMSMART CAM (IPT) Tribon 14 ST-Viewer Database Deliverables CAM CAE 8 9 7a AutoCAD Pipe Stress CATIA 7b

27 Apr ‘06 9 Demo Scenario – AP216

27 Apr ‘06 10 Demo Scenario FORAN Structural Detailed Design FORAN Preliminary Design StandardsSeams & Butts structure, Internal Hull,Decks TWR ship TWR ship’s structure ready to be exported by FORAN-AP218 STEP Export translator Midship Section Calculations Selective STEP Export To ABS Finite Elements Calculations To EB Transverse Bulkheads To Central DB Whole Structure STRUCTURAL DETAILED DESIGN and STEP EXPORT

27 Apr ‘06 11 ISE Process CATIA V5 Tribon M2 ISE Detail Piping Design demonstration

27 Apr ‘06 12 Analysis (Simsmart ™) Analysis (Simsmart ™) Initial HVAC Design (ISDP) Initial HVAC Design (ISDP) Detailed Design Tool 1 (TRIBON) Detailed Design Tool 1 (TRIBON) Manufacturing (EB Sheet Metal) Manufacturing (EB Sheet Metal) Teaming Shipyard Detailed Design (FORAN) Teaming Shipyard Detailed Design (FORAN) Analysis Detailed Design Tool 2 (CATIA) Detailed Design Tool 2 (CATIA) Parts (CPC) Legend demonstrated discussed Order Material Parts (CPC) Parts (CPC) Parts Catalog CAD Tool ISE3 Demo Overview Parts (CPC) Parts (CPC) Analysis Tool Manufacturing

27 Apr ‘06 13 HVAC Demonstration

27 Apr ‘06 14 DONXML The Department of Navy (DON) vision for Extensible Markup Language (XML) is to fully exploit XML as an enabling technology to achieve interoperability in support of maritime superiority For cataloging product data in XML format, the DONXML working group has agreed to allow the STEP Schemas developed under the ISE Project to be registered in the DONXML repository. Schemas registered to date: –Ship Moulded Forms (AP216):2 Use cases –Ship Structures (AP218):2 Use Cases –Piping (AP227):2 Use Cases –HVAC (AP227):1 Use Case –Common Parts Catalog:1 Use Case ISE4 Schemas will be registered

27 Apr ‘06 15 Demo will Feature Product Model Data TWR 3D Product Model Geometry Engine Room ISE4: Arrangements Engineering Analysis Electrical Design Steel Processing from the TWR Engine Room

27 Apr ‘06 16 ISE Product Model Prototyping