Guido_Tonelli _Tracker_Week_April_21_ 20041 ORIGIN OF THE CMN IN TOB/TEC MODULES A PLAUSIBLE EXPLANATION BASED ON MEASUREMENTS PERFORMED ON 1 (AND ONLY.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

Surface Sensitive Bolometers (SSB): last development MARISA PEDRETTI INFN - Milano.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
November 7th 2002Jim Libby (CERN/SLAC)1 Opposite Polarity Signals in Wide Pitch Sensors Jim Libby (CERN/SLAC) Introduction to the R&D in LHCb The test-beam.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
Frank Hartmann Module Construction Meeting1 Analysis on TEC Expressline II modules Two different topics: Strip defects (3 modules) Global IV (2.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Sensor meetingF. Hartmann 1 Status report St & HPK plus add. Scratch tests. IEKP – University of Karlsruhe Frank Hartmann.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 CMN Problem Review-Anthony AffolderTPO, December 11, 2003 Review of CMN Problem/Studies Ariella requested me to review the current understanding of the.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Charge collection studies on heavily diodes from RD50 multiplication run G. Kramberger, V. Cindro, I. Mandić, M. Mikuž Ϯ, M. Milovanović, M. Zavrtanik.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
Charge collection studies on heavily diodes from RD50 multiplication run (update) G. Kramberger, V. Cindro, I. Mandić, M. Mikuž Ϯ, M. Milovanović, M. Zavrtanik.
New Developments in Large Area THGEMs & APV Exercise INFN – Sezione di Trieste Carlos Alexandre Fernandes dos Santos 11/December/2014.
February, 2004CMS Tracker Week1 Sensor Stability Measurements Objective: find simple method of observing sensor stability -> measure fluctuations in overall.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Heavy ion irradiation on silicon strip sensors for GLAST & Radiation hardening of silicon strip sensors S.Yoshida, K.Yamanaka, T.Ohsugi, H.Masuda T.Mizuno,
Effects of long term annealing in p-type strip detectors irradiated with neutrons to Φ eq =1·10 16 cm -2, investigated by Edge-TCT V. Cindro 1, G. Kramberger.
Low Resistance Strip Sensors – RD50 Common Project – RD50/ CNM (Barcelona), SCIPP (Santa Cruz), IFIC (Valencia) Contact person: Miguel Ullán.
Jan, 2001CMS Tracker Electronics1 Hybrid stability studies Multi – chip hybrid stability problem when more then ~ 2 chips powered up -> common mode oscillation.
1 Device Simulations & Hardware Developments for CBM STS Sudeep Chatterji CBM Group GSI Helmholtz Centre for Heavy Ion Research CBM Collaboration Meeting,
Investigation of effects associated with electrical charging of fused silica test mass V. Mitrofanov, L. Prokhorov, K. Tokmakov Moscow State University.
TCT measurements with SCP slim edge strip detectors Igor Mandić 1, Vladimir Cindro 1, Andrej Gorišek 1, Gregor Kramberger 1, Marko Milovanović 1, Marko.
Paul Dolejschi Progress of Interstrip Measurements on DSSDs SVD.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Charles University Prague Charles University Prague Institute of Particle and Nuclear Physics Absolute charge measurements using laser setup Pavel Bažant,
Paul Dolejschi Characterisation of DSSD interstrip parameters BELLE II SVD-PXD Meeting.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
Comparison of the AC and DC coupled pixels sensors read out with FE-I4 electronics Gianluigi Casse*, Marko Milovanovic, Paul Dervan, Ilya Tsurin 22/06/20161.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
TCT measurements with strip detectors Igor Mandić 1, Vladimir Cindro 1, Andrej Gorišek 1, Gregor Kramberger 1, Marko Milovanović 1, Marko Mikuž 1,2, Marko.
Influence of humidity on the IV characteristics A.Chilingarov Lancaster University ATLAS SCT Week CERN,
Clear Performance and Demonstration of a novel Clear Concept for DEPFET Active Pixel Sensors Stefan Rummel Max-Planck-Institut für Physik – Halbleiterlabor.
Rint Simulations & Comparison with Measurements
INFN and University of Florence Test Beam Meeting Tracker Week
I. Rashevskaya on behalf of the Slim5 Collaboration, Trieste Group
INFN and University of Florence Test Beam Meeting Tracker Week
Investigation on tray MID 063 Back
Update of US Testing Status
Review of CMN Problem/Studies
Results from module testing
Overview Time structure of leakage currents
US Module Production Quality
Recent TOB Developments
The measurement set-up
UCSB Qualification Module Grading
Sensor probing (Summary)
CORRELATION BETWEEN LEAKAGE CURRENT AND NOISE
Anthony Affolder UC Santa Barbara
Metal overhang: an important ingredient against “micro-discharge”
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Presentation transcript:

Guido_Tonelli _Tracker_Week_April_21_ ORIGIN OF THE CMN IN TOB/TEC MODULES A PLAUSIBLE EXPLANATION BASED ON MEASUREMENTS PERFORMED ON 1 (AND ONLY 1) MODULE. Guido Tonelli Laura Borrello Mariarosaria D’Alfonso Lino De Maria Suchandra Dutta Alberto Messineo Giusy Valvo B. Caltabiano C. Cerri, A. Profeti, P. Mammini

Guido_Tonelli _Tracker_Week_April_21_ Outline Introduction. Preliminary diagnostic analysis on TEC Module # Electrical measurements. Study of the dependence of CMN and leakage current from the potential difference  V between strip implant and metal. Analysis of the time evolution of the CMN vs  V. Simulation of the effect at the device level. Consistency of the explanation with other observations. Possible actions. Conclusions.

Guido_Tonelli _Tracker_Week_April_21_ The Common Mode Noise Module 5081(Sensors ) Channels: 20 at 300 V and 420 at One or more strips exhibiting a noise incompatible with the leakage current; so large that it affects the entire chip (sometimes in un- recoverable way). Strong correlation with increase in sensor leakage current with respect to sensor QTC data.

Guido_Tonelli _Tracker_Week_April_21_ AAA B (different scale) Attempt to use sensors grading (W7B) 1.5  A Kink in IV Grade AA : I tot < 1.5 µA (and no kink) Grade A: I tot < 1.5 µA (and kink) Grade B: I tot > 1.5 µA Contractual limit: I 450 V < 10  A 1.5  A

Guido_Tonelli _Tracker_Week_April_21_ CMN modules and sensors grading. Sensor Total Grade#CMN%# %# % # % GRADE A %4125.0%1200.0% % GRADE A4224.8%1119.1%1616.3% % GRADE B % %100.0% 33515% Total9666.2%25416%2913.4% % Over 150 modules 11(7%) exhibit CMN. Grade B sensors develop CMN in about 15% of the cases. Grade AA and A develop CMN in about 5% of the modules. No additional selection criteria found so far to further reduce this fraction.

Guido_Tonelli _Tracker_Week_April_21_ The Common Mode Noise The general quality of the first 300 TOB/TEC modules is good but the production yield is around 90-95% (to be compared with 95-97% of the TIB modules). In addition a part of the community attributes this effect to an intrinsic weakness of the STM sensors and believes to have collected enough evidence that this effect will propagate with time to an important fraction of the tracker. Hence the actions to revise the STM contract (7000 sensors ordered to HPK); to slow down in using STM sensors to build final modules; to stop the STM production to initiate a new qualification procedure (new pre-series of 1000 sensors).

Guido_Tonelli _Tracker_Week_April_21_ intrinsic micro-discharge due to STM implant technology effect of the leaky strips in-appropriate handling mechanical deformations (vacuum effect) sensitivity to humidity abnormal time structure of the leakage current degradation of the leakage current with time? Most/all explanations were concentrated on some intrinsic weakness of the STM sensors BUT NO CONCLUSIVE EVIDENCE HAS BEEN FOUND SO FAR. Proposed explanations

Guido_Tonelli _Tracker_Week_April_21_ The CMN module: TEC Built and tested in UCSB. Re-tested in Vienna. Received in Pisa on March 14-th. Investigations started on March the 22-nd.

Guido_Tonelli _Tracker_Week_April_21_ Preliminary diagnostics: initial tests Noise of strip 400V = 60 ADC counts ! Ch 96 noisy 30V; CMN switched ! Strip #360: normal leaky strip (no CMN). The results reproduce perfectly the data obtained at UCSB. 450 Volt = 13,3  A (1-2  A expected from QTC)

Guido_Tonelli _Tracker_Week_April_21_ General optical inspection Several small irrelevant mechanical damages spotted. The only relevant defect is a scratch on the bias ring (and on one strip-normal in terms of noise-). The scratch is mostly on the inner part of the bias ring. Not conclusive. No significant mechanical scratch on the back of the sensors.

Guido_Tonelli _Tracker_Week_April_21_ Optical Inspection of the critical strip A suspicious defect on the poly resistor. Considered not relevant.

Guido_Tonelli _Tracker_Week_April_21_ Study of the mechanical deformations The z positions of the two sensors have been measured under a CMM with the module lying free on the granite table. The spread of the measurement points is several hundreds  m. No evidence of mechanical stress on the sensors similar to deformations due to vacuum.

Guido_Tonelli _Tracker_Week_April_21_ Behavior with humidity and time Measurements done using dry air in the test box (1% humidity APV ON) and high environment humidity (in the probe station APV OFF and in the test box APV ON). Some trend toward a reduction of the leakage current with time at high humidity but still a factor 2/3 higher and CMN still present in data. Basic independence of CMN from humidity and time. CMN

Guido_Tonelli _Tracker_Week_April_21_ Removed the bonding bias ring-pitch adapter- ground through the hybrid Study of different ground connections A direct connection to ground of the silicon sensors was used. Different shielding schemes used (clamshell/CF plate/support plate grounded or floating). CMN still present in data. Basic independence of CMN from shielding and grounding scheme. Special bond to connect the sensors directly to ground.

Guido_Tonelli _Tracker_Week_April_21_ CMN module 13,3µA)Residual system noise Zoomed View, red line depicts average system noise CMN due to the leakage current time structure? CMN present already in data taken at 80V!! Not conclusive. The same module was studied in Vienna to look for anomaly in the leakage current time structure.

Guido_Tonelli _Tracker_Week_April_21_ We then decided to concentrate the attention on the interaction between sensors and read-out electronics at the module level (talk with Lino at CERN at the end of the CMS week). Investigation of the over-metal effect in CMS modules. The issue is particularly important for large pitch thick detectors (OB2). It was found to be critical already during the R&D phase when most of the work was done on HPK multi-geometry structures (see Lino’s talk to review the issue). Study of the interaction sensors-APV25

Guido_Tonelli _Tracker_Week_April_21_ The idea. R 1.5M  2.2k  V The input of the APV is slightly positive +0.75V; for normal strip leakage current I leak <10nA the implant is practically at ground (a few tens of mV for a total I leak = 10  A ). A metal over-hang at positive potential may induce breakdown.

Guido_Tonelli _Tracker_Week_April_21_ Cross-check R 1.5M  2.2k  V We measured the potential difference of the two points during module operation using special micro-bonding to external wires. Measurement points

Guido_Tonelli _Tracker_Week_April_21_ Measurement of the bias-ring voltage

Guido_Tonelli _Tracker_Week_April_21_ Measurement of the input voltage of the APV Several APV input channels measured during normal operations with different detector leakage current. Results consistent with expectation:  V=0.75V +- 40mV

Guido_Tonelli _Tracker_Week_April_21_ The measurement set-up By using an external variable resistor to connect the sensors to ground we can exploit the total sensors leakage current to increase the potential of the bias ring. Resistors from 100k  to 7M  were used. The CMN should disappears when restoring the correct potential difference between metal strip and implant. R

Guido_Tonelli _Tracker_Week_April_21_ CMN vs V R= 0M  Strip 30V and CMN switched 80V

Guido_Tonelli _Tracker_Week_April_21_ CMN vs V R= 2M  Strip 150V and CMN switched 350V

Guido_Tonelli _Tracker_Week_April_21_ CMN vs V R= 5M  Strip 350V and NO CMN UP to 500V

Guido_Tonelli _Tracker_Week_April_21_ Summary table RLEAKY STRIP ONCMN ON CMN FINAL 0 M  30V80V2.3 ADC counts 1 M  80 V150V2.0 ADC 2 M  150V350V1.0 ADC 5 M  350V___________

Guido_Tonelli _Tracker_Week_April_21_ CM subtracted noise vs V bias and R

Guido_Tonelli _Tracker_Week_April_21_ Normal behavior of the entire module Strip 96 is now a normal “leaky strip”. The module is a grade A module.

Guido_Tonelli _Tracker_Week_April_21_ Normal response to Led & Pulse Shape Fiber spot

Guido_Tonelli _Tracker_Week_April_21_ IV vs R The most impressive evidence is the strong dependence of the total sensor current from the small potential applied between implant and metal. A factor 7 reduction in the leakage current which is now compatible with QTC data.

Guido_Tonelli _Tracker_Week_April_21_ Why a so small potential difference can affect the sensors ? Because it affects the field distribution at the edge of the implants. The metal over-hang at a positive potential with respect to the implants favors the breakdown.

Guido_Tonelli _Tracker_Week_April_21_ Metal over-hang Metal lines 4-8  m wider than the corresponding implant strips (metal over-hang) are adopted to increase the breakdown performance. We expect higher fields at large pitch & small w/p. Over-metal moves the high field region from Si to SiO 2 V brk (Si) = 30 V/  m V brk (SiO 2 ) = 600 V/  m BUT THE METAL SHOULD BE AT THE SAME OR LOWER POTENTIAL WITH RESPECT TO THE IMPLANT OTHERWISE IT COULD BE DANGEROUS

Guido_Tonelli _Tracker_Week_April_21_ Metal over-hang at positive V 10nA I V 10  A The high density of field lines at the implant edges yields to breakdown. The strip leakage current increases of orders of magnitude. A current of a few  A flowing through the poly resistor (1.5M  ) increases the strip potential to values higher than the metal strip. We jump to the following case.

Guido_Tonelli _Tracker_Week_April_21_ Metal over-hang at negative V 10nA I V 10  A The density of field lines decreases and the strip exits from breakdown. 10 nA flowing through the poly resistor (1.5M  ) are not able to maintain the implant potential positive with respect to to the metal. We step back to the previous situation.

Guido_Tonelli _Tracker_Week_April_21_ Huge CMN: intermittent breakdown The previously described mechanism can explain why this “leaky strip” is so different. A “normal” breakdown (10  A through a single strip) is not sufficient to account for these effects (60 ADC rms noise and CMN on the chip). It is not a normal breakdown it is an intermittent phenomenon. To study the time evolution of the process we analyzed the data taken on the module in different conditions..

Guido_Tonelli _Tracker_Week_April_21_ Data taking in multiframe-mode Huge variations (oscillations) in the noise behavior. Silent periods followed by explosions.

Guido_Tonelli _Tracker_Week_April_21_ Time evolution of the CMN strip Neighboring strip (95/97) and far away strips (50/106) plotted for comparison #96 #95 and #97 #50 #106

Guido_Tonelli _Tracker_Week_April_21_ Comparison with a normal TIB leaky strip Noise amplitude distribution. TEC 0M  TIB

Guido_Tonelli _Tracker_Week_April_21_ Area vs  t and number of flips  TIB 

Guido_Tonelli _Tracker_Week_April_21_ TEC R=1M  Un-distinguishable from TIB in all variables. Area vs  t Number of flips Amplitude

Guido_Tonelli _Tracker_Week_April_21_ Back bias voltage Q oxide AC pad potentialCase V 1.0·10 10 charge/cm 2 Ground A + 10 Volts B 1.5·10 11 charge/cm 2 Ground C + 10 Volts D Simulation To understand better the mechanism in our devices, we have asked STM to perform a detailed simulation for OB2 devices (need of using the appropriate doping profiles). The exercise was done for two different oxide charge density (roughly corresponding to Flat Band Voltage of 1V-recent productions- and 5V- old sensors-). Details in Lino’s presentation.

Guido_Tonelli _Tracker_Week_April_21_ Electric field (detailed view) Case C Case D Q ox =1.5·10 11 charge/cm2 Aluminum Oxide

Guido_Tonelli _Tracker_Week_April_21_ Electric field across the implant The combined effect of oxide charge density and positive voltage on the metal may account for more than a factor 2 increase of the peak. A few percent increase may account for a small probability effect. Case A Case B Case C Case D

Guido_Tonelli _Tracker_Week_April_21_ Consistency with other observations The effect escaped our QTC measurements because in the standard set-up the metal is floating (see Alberto’s talk). The appearance of CMN is more likely in old (high flat band) and lower quality (B-C grade) sensors (the sensor grading could be already an indication that some strips are close to breakdown). In OB2 should be more likely than in OB1. Observations by F. Hartmann (effect reduced after irradiation). Observations by T. Affolder (effect disappeared if the AC metal is connected to ground). Observations by M. Poettgens (increase of the sensors leakage current only when connected to the electronics). Remember that we are dealing with a small probability effect: 5% of the modules exhibiting CMN means 2.5% of the sensors, or 2-3 strips over (less than ).

Guido_Tonelli _Tracker_Week_April_21_ Actions (1) I would require the technical endorsement of the sensor group to recommend a list of actions to be approved by the TSC/TIB. 1)Review and repeat our measurements on more CMN modules; increase the statistical significance of our tests; add further tests. 2)Implement/optimize a new procedure of testing with the metal fixed at some positive potential (+5V ?) to identify potentially weak strips (Alberto’s talk) and operate a screening. 3)Discuss with STM the possibility to adopt the same procedure for the 1000 sensors to be delivered as new pre-series before using them to build modules.

Guido_Tonelli _Tracker_Week_April_21_ Actions (2) 4) Use ourselves the same screening procedure on the sensors already delivered that could be probably used without any risk for CMS. 5) Perform a stress test on the several hundreds of good TOB-TEC modules already built. The test could be done by biasing the APV with respect to a virtual ground brought at a positive potential of a few volts with respect to the sensor ground. 6)Cure the CMN modules by simply removing the connection to the APV of the noisy strip and bonding it to ground. 7)Study feasibility (and drawbacks) to use this feature to increase in general the breakdown performance (or the lifetime) of the tracker by means of a NEGATIVE BIAS APPLIED TO THE OVERMETAL (APV INPUTS). We have discovered a new way of operating AC coupled silicon detectors for extended breakdown performance

Guido_Tonelli _Tracker_Week_April_21_ Conclusions As usual the work never ends!