5 Jan 2004, Boulder CO URSI The Current Status of the Green Bank Telescope.

Slides:



Advertisements
Similar presentations
The GBT as a MM Telescope ALMA Science Workshop May 2004 Brian Mason (NRAO-GB)
Advertisements

Arecibo 40th Anniversary Workshop--R. L. Brown The Arecibo Astrometric/Timing Array Robert L. Brown.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Richard Prestage GBT Future Instrumentation Workshop, September 2006 The Green Bank Telescope:
3mm amplitude test by Cheng-Jiun Ma. Observation Source : Orion SiO Frequency: GHz 256 channels within 64MHz bandwidth Ant 3 & Ant 4 no Tsys correction.
SKAMP - the Molonglo SKA Demonstrator M.J. Kesteven CSIRO ATNF, T. J. Adams, D. Campbell-Wilson, A.J. Green E.M. Sadler University of Sydney, J.D. Bunton,
The Green Bank Telescope a powerful instrument for enhancing ALMA science Unblocked Aperture Low sidelobes gives high dynamic range Resistance to Interference.
Radio Astronomy Overview 9 May 2005 F.Briggs, RSAA/ATNF Radio `source’ Goals of telescope: maximize collection of energy (sensitivity or gain) isolate.
SKAMP - the Molonglo SKA Demonstrator M.J. Kesteven CSIRO ATNF, T. J. Adams, D. Campbell-Wilson, A.J. Green E.M. Sadler University of Sydney, J.D. Bunton,
The Green Bank Telescope Ronald Maddalena National Radio Astronomy Observatory.
The Future of the Past Harvard University Astronomy 218 Concluding Lecture, May 4, 2000.
Signal Processing for Aperture Arrays. AAVS1 256 antenna elements distributed over –4 stations –64 elements each.
Project status and specifications Douglas Bock Project Manager 1.
ATA Antennas Feeds and Systems NSF Review 8/05/08 Jack Welch.
Comet observing program: Water in comets: water ice ~50% of bulk composition of cometary nuclei water vapor: sublimation drives cometary activity close.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array EVLA Observations of.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Digital Signal Processing.
Single-Dish Radio Telescopes Dr. Ron Maddalena National Radio Astronomy Observatory Green Bank, WV.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Spectrometer PDR John.
Backend electronics for radioastronomy G. Comoretto.
GBT Spectral Baselines – Tuesday, 11 March 2003 GBT Spectral Baseline Investigation Rick Fisher, Roger Norrod, Dana Balser (G. Watts, M. Stennes)
Calibration Ron Maddalena NRAO – Green Bank July 2009.
The Green Bank Observatory National Radio Astronomy Observatory David Frayer NRAO “Planning a GBT Proposal”: GBT Science and Capabilities.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array A New Multibeam Spectrometer.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Molecular Gas and Dust in SMGs in COSMOS Left panel is the COSMOS field with overlays of single-dish mm surveys. Right panel is a 0.3 sq degree map at.
URSI Boulder Jan 2006 The Iowa e-SRT laboratory Robert Mutel, Laura Spitler*, Kevin Ivarsen † University of Iowa * Now at MPI, Bonn † Now at UNC.
PULSAR SURVEYS (AO & GBT) Why? How deep can we go? (D max, V max ) Example surveys Hardware Funding.
Interplanetary Scintillation Observations of the Solar Wind Using SWIFT and Upgraded STEL Multi-station System M. Tokumaru, K. Fujiki, and T. Iju (STEL,
Introducing the EVLA NRAO Postdoctoral Symposium, 29 April-1 May 2009 Michael P. Rupen Project Scientist for WIDAR.
The BEST-2 SKA pathfinder is composed by 32 receivers. The front ends are installed on the focal lines of 8 cylinders, offering a collecting area of about.
Making MOPRA go! Lucyna Kedziora-Chudczer Friend of the telescope (UNSW)
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
SMT Control System Steward Observatory Faculty MeetingMay 02, 2003 A rizona R adio O bservatory Thomas W. Folkers.
The Robert C Byrd Green Bank Telescope Frank Ghigo, National Radio Astronomy Observatory US VLBI Meeting, Socorro, Nov 2011 VLBI usage: About 15% of GBT.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
ASKAP Capabilities John Reynolds on behalf of the SEIC and ASKAP team.
Pulsar surveys at Arecibo and Green Bank David Champion Gravity Wave Meeting, Marsfield, Dec 2007.
ALMA Science WorkshopMay 14, 2004 Present and Future Thomas W. Folkers Arizona Radio Observatory.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
Radio Telescopes and Radiometers
The Future of the VLBA 27 & 28 January 2011 Arecibo, the VLBA and the HSA Chris Salter Arecibo Observatory (National Astronomy & Ionosphere Center) ‏
Centimeter Receiver Design Considerations with a look to the future Steven White National Radio Astronomy Observatory Green Bank, WV.
Rick Perley 2 Nov 2001 EVLA Correlator Conceptual Design Review 1 Science Drivers for the EVLA Correlator Rick Perley EVLA Project Scientist 2 Nov 2001.
APSR Matthew Bailes Swinburne University Of Technology.
The Green Bank Telescope Frank Ghigo, National Radio Astronomy Observatory 7 th US VLBI Technical Meeting, Haystack, Nov 2009.
ATCA GPU Correlator Strawman Design ASTRONOMY AND SPACE SCIENCE Chris Phillips | LBA Lead Scientist 17 November 2015.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review John Ford September 28, 2009 Casper Instrumentation at Green Bank The NRAO is operated for.
Tracing The Signal Ron Maddalena July Typical Components Amplifiers Mixers Attenuators Power Detectors Synthesizers Splitters Couplers Filters.
SPIE – June 25, The Details….. SPIE – June 25, Previous Focus Tracking Curves.
20 June 2006 Green Bank GBT Performance Dana S. Balser.
1 1 CORNISH WORKSHOP Leeds, 13 th April 2007 James Green The Methanol Multibeam Project Project MMB.
Chuck KutzEVLA Front-End CDR – LO/IF System April 24, EVLA Front-End CDR EVLA Front-Ends and the EVLA LO/IF System.
Fundamentals of the GBT and Single-Dish Radio Telescopes Dr. Ron Maddalena National Radio Astronomy Observatory Green Bank, WV March 2016 ©Associated Universities,
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Richard Prestage, Kim Constantikes, Dana Balser, Jim Condon The GBT Precision Telescope Control.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Fundamentals of mm Astronomy and Observing Tools ➢ fundamentals and instrumentation ➢ calibration, efficiencies, and observing modes ➢ pointing, refraction,
Surveying Cosmic Time with the WIDAR Correlator
Green Bank Telescope Mark M. McKinnon
EVLA Advisory Committee Meeting System Status
Current GBT Performance
GBT and other Green Bank Capabilities
NRAO-GB Support for VSOP-2
Rick Perley National Radio Astronomy Observatory
Some Illustrative Use Cases
Analysis of Adaptive Array Algorithm Performance for Satellite Interference Cancellation in Radio Astronomy Lisha Li, Brian D. Jeffs, Andrew Poulsen, and.
GBT Status: Current Observing Capabilities
Terry Cotter LO/IF Group Leader
The Green Bank Telescope: Overview and Antenna Performance
Correlator Growth Path
KFPA CDR R. Norrod Feb 27, 2008.
Presentation transcript:

5 Jan 2004, Boulder CO URSI The Current Status of the Green Bank Telescope

URSI 5 Jan 2004 Telescope Structure

URSI 5 Jan 2004 Unblocked Aperture

URSI 5 Jan 2004 Active Surface

URSI 5 Jan 2004 GBT Sensitivity

URSI 5 Jan 2004 Telescope Optics

URSI 5 Jan 2004 Front-end Status

URSI 5 Jan 2004 GBT Receiver System Temperatures

URSI 5 Jan 2004 Back-end Status ACS BCPM GBPP DCR CCB SP PFS

URSI 5 Jan 2004 Current Pointing Performance Blind Pointing: (1 point/focus) Offset Pointing: (90 min) Continuous Tracking: (30 min) Benign Conditions: (1) Exclude 10:00  18:00 (2) Wind < 2.5 m/s

URSI 5 Jan 2004 Half-power Track (14 GHz)

URSI 5 Jan 2004 GBT Sidelobes (Cygnus 800 MHz)

URSI 5 Jan 2004 Active Surface Performance at 20 GHz

URSI 5 Jan 2004 Q band (43 GHz) Performance

URSI 5 Jan 2004 GBT Observing Summary (2003)

URSI 5 Jan 2004

Supplemental Material

URSI 5 Jan 2004 Azimuth (40 degrees per minute)

URSI 5 Jan 2004 Elevation (20 degrees per minute)

URSI 5 Jan 2004 Front-end Status ReceiverOperating RangeStatus Prime Focus 1290—920 MHzCommissioned Prime Focus 2910—1230 MHzCommissioned L Band1.15—1.73 MHzCommissioned S Band1.73—2.60 MHzCommissioned C Band3.95—5.85 MHzCommissioned X Band8.2—10.0 MHzCommissioned Ku Band12.4—15.4 MHzCommissioned K Band18—26.5 MHzCommissioned Ka Band26—40 MHzUnder Construction Q Band40—50 MHzPartially Commissioned W Band68—92 MHzOn Hold Penn Array MHzUnder Construction

URSI 5 Jan 2004 Back-end Status: Spectroscopy GBT Spectrometer (3 and 9-level correlator): Bandwidths: 12.5, 50, 200, 800 MHz Modes: 8 x 800 MHz; 32 x 50 MHz Resolution: MHz Spectral Processor (32 bit FT spectrometer): Bandwidths: – 40 MHz Modes: 2 x 1024 x 40 MHz; 8 x 256 x 10 MHz Resolution: MHz

URSI 5 Jan 2004 Back-end Status: Continuum Digital Continuum Receiver: V/F converter into 28 bit counters 16 inputs; 10 switching phases 100 nano-sec phase time resolution Caltech Continuum Back-end: (under construction) For Ka and W-band receivers Full bandwidth 10 kHz switching

URSI 5 Jan 2004 Back-end Status: Pulsar Spectrometer: Bandwidth: 800 MHz Data rate: 25 MB per second Spectral Processor: Bandwidth: 40 MHz Pulsar timing Berkeley Caltech Pulsar Machine (BCPM1, BCPM2): Bandwidth: 23 – 160 MHz Green Bank-Berkeley Pulsar Processor (GBPP): Digital de-dispersion; cross pol

URSI 5 Jan 2004 Back-end Status: Misc Portable Fast Sampler: bi-static radar Sample Rate: 20 MHz

URSI 5 Jan 2004 GBT Sensitivity (60 second integration time) Spectral Line SensitivityBandwidthRMS Noise 1420 MHz (HI)1 km/s0.06 K (32 mJy) 22 GHz (H2O)1 km/s0.03 K (18 mJy) 43 GHz (SiO)1 km/s0.03 K (15 mJy) 89 GHz (HCN)1 km/s0.04 K (40 mJy) Continuum Sensitivity 14 GHz3 GHz55 micro-Jy 90 GHz7 GHz270 micro-Jy 90 GHz20 GHz120 micro-Jy