Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ATIS Intellectual Property Rights Activities 2011 – An Update Thomas Goode General Counsel, ATIS.

Slides:



Advertisements
Similar presentations
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Advertisements

Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
GSC: Standardization Advancing Global Communications Towards a Common ITU/ISO/IEC Patent Policy by Masamichi Niiya Telecommunication Standardization Bureau.
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Summary of GSC-16 IPR WG Meeting Michael Eisen WG Chair Document No: GSC16-CL-06 Source: IPR WG Chair.
Geneva, Oct 9, 2012 ATIS Intellectual Property Rights Activities 2012 – An Update Thomas Goode General Counsel, ATIS Document No: GSC16bis-IPR-08 Source:
Fostering worldwide interoperabilityGeneva, July 2009 "Update on Activities of the TIA IPR Standing Committee since GSC-13" Amy Marasco TIA Delegation.
Doc.: IEEE /024 Submission January 2001 Jim Carlo, Texas InstrumentsSlide 1 Patents and IEEE 802 Stds IEEE 802 Chair’s Viewpoint Jim Carlo General.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All 2011 IN REVIEW: ITU’S ACTIVITIES IN THE FIELD OF STANDARDIZATION & IPR Antoine Dore, Senior Legal.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All "Update on Activities of the TIA IPR Standing Committee (IPR SC) and the new Standards and IPR Policy.
April 11, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board Standards Development Process.
1 May 2007 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: l Show slides #1 through #5 of.
1 TIA Engineering Committees - Policies and Procedures TIA Staff.
1 Presented by Earl Nied Vice Chair, ANSI IPRPC September 3, 2010 Overview: The ANSI Intellectual Property Rights Policy Committee (“IPRPC”): Challenges,
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Real Time Locating Systems (RTLS) Presented by: Craig K. Harmon NCITS T20, Convener.
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
GSC-8xxx SOURCE:TIA TITLE:IPR Working Group Report AGENDA ITEM:Closing Plenary Agenda Item 1.1 DECISION DISCUSSIONX INFORMATIONX 21/10/2015 Report on the.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Doc.: IEEE /400 Submission November 2000 Matthew B. Shoemake, Texas InstrumentsSlide 1 Patent Policy Review Matthew B. Shoemake, Ph.D. IEEE g,
© 2007 Open Grid Forum Data Grid Management Systems: Standard API - community development Arun Jagatheesan, San Diego Supercomputer Center & iRODS.org.
Overview of the TSB Director ’ s Ad Hoc Group on IPR Telecommunication Standardization Bureau (TSB) International Telecommunication Union Place des Nations.
International Telecommunication Union New Delhi, India, December 2011 ITU Workshop on Standards and Intellectual Property Rights (IPR) Issues Philip.
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
International Telecommunication Union ITU Workshop on Standards and Intellectual Property Rights (IPR) Issues Yukio Hiramatsu Chairman, TTC IPR Committee.
Geneva, Oct 8, 2012 Latest developments in the field of IPR since GSC-16 Antoine DORE Senior Legal Officer, ITU Document No: GSC16bis-IPR-10 Source: ITU.
Doc.: 802_Handoff_Opening_Notes_r1 Submission November David Johnston, IntelSlide 1 IEEE 802 Handoff ECSG Chair’s Introduction David Johnston
Fostering worldwide interoperabilityGeneva, July 2009 Summary of GSC-14 IPR WG Meeting Antoine Dore, ITU IPR WG Chair Global Standards Collaboration.
C /27 May 15, 2006Chair, IEEE Opening May 2006 Plenary Session #20 Jerry Upton- Chair Doug Knisely – Procedural.
Geneva, October 9, 2012 Summary of GSC-16bis IPR WG Meeting Greg Ratta, ITU IPR WG Rapporteur Document No: GSC-16bis-IPR-12 Source: IPR WG Rapporteur Contact:
TIA IPR Standing Committee Report to TIA Technical Committee “Normative References and IPR” October 21, 2005 Paul Vishny, Chair Dan Bart, TIA.
ATIS Intellectual Property Rights Policy Review Thomas Goode General Counsel, ATIS DOCUMENT #:GSC13-IPR-08 FOR:Presentation or Information SOURCE:ATIS.
xx session2_opening_notes.ppt Submission May 2004 Ajay Rajkumar, Chair, Slide 1 IEEE Session #2 Opening Session Ajay Rajkumar.
Doc.: IEEE /0747r0 Submission May 2006 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp May Opening Presentation Notice: This document has.
January 17, 2005Chair, IEEE Opening January 2005 Plenary Session #12 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE /0804r0 Submission May 2007 Al Petrick, WiDeFiSlide 1 TGmb – Closing Report Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0054r0 Submission January 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc Agenda Notice: This document has been prepared to.
Summary of GSC-13 IPR WG Meeting Tom Goode, ATIS IPR WG Chair DOCUMENT #:GSC13-CL-05r1 FOR:Presentation SOURCE:Tom Goode, IPR WG Chair AGENDA ITEM:3.4.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
DG Enterprise and Industry European Commission Standardisation Aspects of ICT and e-Business Antonio Conte Unit D4 - ICT for Competitiveness and Innovation.
Doc.: IEEE /0661r0 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Dirk Weiler Chairman of the ETSI IPR Special Committee Document No: GSC16-IPR-02 Source: ETSI Contact:
International Telecommunication Union New Delhi, India, December 2011 ITU Workshop on Standards and Intellectual Property Rights (IPR) Issues Antoine.
Fostering worldwide interoperabilityGeneva, July 2009 ATIS Intellectual Property Rights Policy Review Thomas Goode General Counsel, ATIS DOCUMENT.
Doc.: IEEE /161r0 Submission January 2004 Al Petrick, IceFyre Semiconductor Slide WG Technical Editor’s Report January 2004 Interim Meeting.
IEEE 802 Handoff ECSG Chair’s Introduction
Global Standards Collaboration (GSC) GSC-15
Submission Title: [WG-TG3b Meeting Report Sept04]
Amy Marasco, Incoming Vice Chair, ANSI IPRPC
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
Instructions for the WG Chair
IEEE Wireless Coexistence TAG
Summary of GSC-16bis IPR WG Meeting
Summary of GSC-16 IPR WG Meeting
APF Study Group Agenda September 13, 2004 September 2004
TGu Ad Hoc Agenda Date: Authors: February 2007
Earl Nied Vice Chair, ANSI IPRPC
IEEE IMT-Advanced Review Process
Towards a Common ITU/ISO/IEC Patent Policy
IEEE IMT-Advanced Review Process
Submission Title: [WG-TG3b Meeting Report Sept04]
TGu Agenda Date: Authors: March 2007 March 2007
Submission Title: [WG-TG3b Meeting Report September05]
Report of TGv – September 2006
TGi Preliminary Agenda
BEAM Ad Hoc September Agenda and Report for LB97
Summary of GSC-13 IPR WG Meeting
TGu Agenda Date: Authors: May 2006 May 2006
Presentation transcript:

Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ATIS Intellectual Property Rights Activities 2011 – An Update Thomas Goode General Counsel, ATIS Submission Date: July 8, 2008 Document No: GSC16-IPR-07 Source: ATIS Contact: Thomas Goode GSC Session: IPR WG Agenda Item: 4.6 1

Halifax, 31 Oct – 3 Nov 2011 GSC16-IPR-07 ICT Accessibility For All 2 ATIS follows the ANSI Patent Policy and is an active participant in ANSI IPR Policy Committee. Section 10.4 of the ATIS Operating Procedures details ATIS’ patent disclosure and assurance policy, which: –Encourages the disclosure of relevant patented inventions at the “earliest possible time” in the development of deliverables; –Notes that, if ATIS receives notice that a deliverable may require use of a patented invention, an assurance stating that licenses will be made available on RAND terms, must be received; and –Specifies that any writing submitted as of January 31, 2011, for the purpose of expressing a licensing assurance, shall not qualify as such an assurance unless it expressly states that the assurance is irrevocable. Background – ATIS IPR Policy

Halifax, 31 Oct – 3 Nov 2011 GSC16-IPR-07 ICT Accessibility For All 3 ATIS IPR Policy Review Task Force formed in November 2006: –Focused on whether changes to the ATIS IPR policy should be revised to allow for more effective standards development; –Noted absence of problems under policy; –Recommended a change to the IPR policy to address the irrevocability of licensing assurances; and –Developed a voluntary patent disclosure and assurance form. Transformed at the end of 2010 by the ATIS Board of Directors into a permanent ad hoc committee to provide continuing input on IPR related issues, as appropriate, to ATIS staff and Board. ATIS IPR Ad Hoc Committee

Halifax, 31 Oct – 3 Nov 2011 GSC16-IPR-07 ICT Accessibility For All SoS Request for Information On March 7, 2011, ATIS responded to a Request for Information (RFI) from the National Science and Technology Council’s Subcommittee on Standards (SoS). –The RFI focused on U.S. governmental participation in standards (particularly those dealing with Smart Grid, Cybersecurity and Emergency Communications Interoperability). –It also sought information on: The effectiveness of standards processes; The impact of these processes on competitiveness; and The impact of the need for access to intellectual property on the use or development of standards. 4

Halifax, 31 Oct – 3 Nov 2011 GSC16-IPR-07 ICT Accessibility For All ATIS Response to SoS RFI ATIS’s response stated a concern with efforts to fundamentally change the standards process, and opined that there was no necessity to do so. –Fundamental changes could adversely impact ATIS members’ core operations and reduce the effectiveness of standards; adverse impacts could arise from: Additional government-mandated standards; and Required governmental use or development of so-called “open” (defined as royalty-free) standards. ATIS commented that processes could be improved through increased governmental participation in, and support for, existing standards processes. 5

Halifax, 31 Oct – 3 Nov 2011 GSC16-IPR-07 ICT Accessibility For All ATIS Response to SoS RFI ATIS’ comments to the RFI also noted that: –U.S. governmental agencies have effectively participated in the private development of standards and ATIS has successfully collaborated with agencies to address technical, policy issues; –Industry standardization efforts continue to be effective; and –ATIS’ IPR policy facilitates effective, timely standards development. On October 14, the SoS released a report based on input received; this report noted that input: –Indicated that there is no single “ideal” IPR policy – SDOs are in the best position to establish effective policies; –IPR policies should take into account the needs of both IPR holders and implementers; and –IPR policies should be accessible, clear and unambiguous. 6

Halifax, 31 Oct – 3 Nov 2011 GSC16-IPR-07 ICT Accessibility For All FTC Request for Comments On June 14, ATIS provided input to the U.S. Federal Trade Commission (FTC) in response to its Request for Comments on issues such as: –Practical and legal issues that arise from collaborative standards setting when standards incorporate technologies that are protected by IPR; Disclosure of patent rights; RAND licensing commitments; and ex ante disclosure and/or negotiation of licensing terms. –How SDO policies, including specifically IPR policies, address the problem of “hold up.” Hold-up is defined as a demand for higher royalties or other more costly licensing terms after the standard is implemented than could have been obtained before the standard is chosen. 7

Halifax, 31 Oct – 3 Nov 2011 GSC16-IPR-07 ICT Accessibility For All ATIS Response to FTC Request ATIS’ comments observed that IPR policies of SDOs such as ATIS are not in need of change. –ATIS and other SDOs continually review their policies and make modifications as necessary based on industry consensus. –Mandating changes to the way that SDO policies address IPR disclosure or licensing could create imbalances in various interests and create inefficiencies in the development process. –Many of the issues raised in the Request have been previously considered and found unnecessary, impractical and contrary to open, balanced, consensus-based processes. –The success of ATIS’ policies can be seen in ATIS’ diverse membership, the breadth of its work program and in the development of widely-implemented standards. 8

Halifax, 31 Oct – 3 Nov 2011 GSC16-IPR-07 ICT Accessibility For All 9 Supplementary Slides

Halifax, 31 Oct – 3 Nov 2011 GSC16-IPR-07 ICT Accessibility For All Links to ATIS Public Policy Filings ATIS maintains a link to all its public policy filings, including those referenced in this presentation: – ATIS’ submission in response to SoS RFI: – ATIS submission to FTC Request for Comments: – pdfhttp:// pdf 10

Halifax, 31 Oct – 3 Nov 2011 GSC16-IPR-07 ICT Accessibility For All 11 ATIS Member Companies Participating in the ATIS IPR Policy Review Ad Hoc ADTRAN, Inc. Alcatel-Lucent AT&T CenturyLink Cisco Corning Ericsson Hewlett Packard Microsoft Motorola Mobility NetTraffic QUALCOMM Research In Motion Tekelec T-Mobile Verizon

Halifax, 31 Oct – 3 Nov 2011 GSC16-IPR-07 ICT Accessibility For All 12 ATIS Patent Policy Section 10.4 of the ATIS OP If ATIS or ANSI receives a notice that a proposed American National Standard may require the use of a patented invention, the procedures in this clause shall be followed Statement from patent holder –Prior to approval of such a proposed American National Standard, ATIS or ANSI shall receive from the identified party or patent holder (in a form approved by ATIS or ANSI) either: assurance in the form of a general disclaimer to the effect that such party does not hold or does not currently intend holding any invention the use of which would be required for compliance with the proposed American National Standard or assurance that: A license will be made available without compensation to the applicants desiring to utilize the license for the purpose of implementing the standard; or A license will be made available to applicants under reasonable terms and conditions that are demonstrably free of any unfair discrimination.