IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY April 2008, aasg Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY April 2008, aasg
Outline Overview of POETS IRTF Project Lab testing results Packing plan Shipping Plan Mounting Plan
POETS IRTF team MIT, Boston Amanda Gulbis (P.I.) Jim Elliot (Co-I.) Folkers Rojas (mechanical design and fabrication) Mike Person & Matt Lockhart (instrument consultation & observers) MIT, Boston Amanda Gulbis (P.I.) Jim Elliot (Co-I.) Folkers Rojas (mechanical design and fabrication) Mike Person & Matt Lockhart (instrument consultation & observers) IfA, Hawaii Bobby Bus (observing and long term support) John Rayner (optical design, SpeX interface) Vern Stahlberger (mechanical design) Lars Bergknut (mounting & work at summit) Alan Tokunaga (IRTF division chief)
POETS IRTF Summary Our goal is to mount a high-speed, visible wavelength camera system on the IRTF (NASA’s 3-m Infrared Telescope Facility) The instrument is based on existing MIT-Williams College POETS (Portable Occultation, Eclipse, and Transit Systems) The instrument will be mounted on the side-facing exit window of SpeX – a dichroic allows entry for light < 8000 Å or 9500 Å Our goal is to mount a high-speed, visible wavelength camera system on the IRTF (NASA’s 3-m Infrared Telescope Facility) The instrument is based on existing MIT-Williams College POETS (Portable Occultation, Eclipse, and Transit Systems) The instrument will be mounted on the side-facing exit window of SpeX – a dichroic allows entry for light < 8000 Å or 9500 Å Fore-optics box uses 3:1 reducing optics to return f/9.32 beam and 60” FOV
POETS IRTF Overview Schematic of full setup
POETS IRTF Overview Schematic of full setup Optical path Schematic of full setup Optical path
POETS IRTF Components Fore-optics box (28 pieces, 1 mirror, 3 lenses, 1 filter wheel, 1 filter wheel motor, and assorted dowel pins and screws) Camera (Andor Ixon, 512 x 512 frame transfer BI E2V CCD with 16 m pixels; including power cable & computer cable) Computer (Shuttle; including power cord, PCI card, keyboard, & mouse) GPS (Spectrum Inst.; including power supply, 25-m cable, control cable, and antenna) Fore-optics box (28 pieces, 1 mirror, 3 lenses, 1 filter wheel, 1 filter wheel motor, and assorted dowel pins and screws) Camera (Andor Ixon, 512 x 512 frame transfer BI E2V CCD with 16 m pixels; including power cable & computer cable) Computer (Shuttle; including power cord, PCI card, keyboard, & mouse) GPS (Spectrum Inst.; including power supply, 25-m cable, control cable, and antenna)
Fore-optics box
Camera
Computer Two computers are shown here -- the top is a current POETS machine. The bottom is the IRTF machine, which we have yet to get functioning properly with the camera. We have ordered a new computer, as similar to the top machine as we possible. If that machine does not work, we will ship a current POETS computer and swap at a later date.
GPS
Lab Testing Setup: All components assemble and disassemble as planned Dowel pins are used for accurate alignment during assembly No play in components once assembled Light tightness can’t be tested until mounted – all components overlap Remaining issues: attachment to SpeX (was tested onsite) Manual shutter (functions, but attachment not tested) Instrument Computer (original system won’t work with the camera. new system ordered, ETA at MIT 18 April 2008) Filter wheel (parts are in place, no filters or driving mechanism) Replacement lenses (lens 1 chipped at edges during initial fitting - doesn’t seem to effect images, but spare lenses have been ordered) Setup: All components assemble and disassemble as planned Dowel pins are used for accurate alignment during assembly No play in components once assembled Light tightness can’t be tested until mounted – all components overlap Remaining issues: attachment to SpeX (was tested onsite) Manual shutter (functions, but attachment not tested) Instrument Computer (original system won’t work with the camera. new system ordered, ETA at MIT 18 April 2008) Filter wheel (parts are in place, no filters or driving mechanism) Replacement lenses (lens 1 chipped at edges during initial fitting - doesn’t seem to effect images, but spare lenses have been ordered)
Lab Testing Calibrations Cooling: TE cooler run for hours at -70º C at room temp Read Noise and Gain Were measured in lab prior to fore-optics box setup, are consistent with spec. sheet Difficulties in obtaining accurate flatfields while camera is attached to fore optics
Lab Testing
Vignetting Illuminated frames show slight vignetting at corners Vignetting pattern changes with adjustment of lens 2 & 3 positions, but cannot be eliminated
As evenly illuminated as possible: note vignetting (spots are dust on lenses) Lab Testing
Images Test charts placed at approximate TFP (0.3” in front of lens 1) can be made to come into a clear focus Camera can be adjusted greater than 1” in z-extension for focusing adjustment – threaded at 32 threads per inch to allow fine tuning No distortions are apparent across the image, centering looks OK – can’t confirm without higher accuracy of TFP
Test charts placed at TFP Images Lab Testing
Packing Plan F. Rojas to be in charge of packing fore-optics box Preassembled, with lens mounts removed shipped in hard, ex-PCCD container All associated box hardware and camera cables can fit in this package Packages to ship Fore-optics box GPS (packaged as shipped to us) Computer (packaged as shipped to us) Some possibility for consolidation (i.e. GPS may fit in fore-optics box) F. Rojas to be in charge of packing fore-optics box Preassembled, with lens mounts removed shipped in hard, ex-PCCD container All associated box hardware and camera cables can fit in this package Packages to ship Fore-optics box GPS (packaged as shipped to us) Computer (packaged as shipped to us) Some possibility for consolidation (i.e. GPS may fit in fore-optics box)
Shipping Plan Online quote for DHL 2-day shipping from zip codes to is ~ $500 (100 lb. box with rough dimensions of our fore optics box) Plan to ship no later than 23 April (Wed.) for mounting one week later (30 April) If computer testing takes longer, can ship as late as the 25th Hand-carried components Camera Optics Online quote for DHL 2-day shipping from zip codes to is ~ $500 (100 lb. box with rough dimensions of our fore optics box) Plan to ship no later than 23 April (Wed.) for mounting one week later (30 April) If computer testing takes longer, can ship as late as the 25th Hand-carried components Camera Optics
B. Bus (observing, long term support), J. Rayner (SpeX interfacing, testing), L. Bergknut (mounting, summit work), A. Tokunaga (big problems) Mounting Plan
Engineering Run Preparation Submitted plan to A. Tokunaga Verified plan is reasonable with B. Bus Completed ORF - requested lodging at PH and IRTF vehicle Faxed Driver’s Clearance form Contacted George Koenig re: instrument delivery Confirmed DHL 2-day shipping will work Confirmed shipping address Working on night plans for observations with C. Zuluaga Submitted plan to A. Tokunaga Verified plan is reasonable with B. Bus Completed ORF - requested lodging at PH and IRTF vehicle Faxed Driver’s Clearance form Contacted George Koenig re: instrument delivery Confirmed DHL 2-day shipping will work Confirmed shipping address Working on night plans for observations with C. Zuluaga
Engineering Run Preparation Immediate to do Telecon with Hawaii to ensure we’re all on the same page Contact Miranda Hawarden-Ogata re: network interface Confirm engineering observing times Longer term to do Compile documentation Engineering diagrams Setup and usage manual Basic version for observers and more advanced for supporters Maintenance manual Immediate to do Telecon with Hawaii to ensure we’re all on the same page Contact Miranda Hawarden-Ogata re: network interface Confirm engineering observing times Longer term to do Compile documentation Engineering diagrams Setup and usage manual Basic version for observers and more advanced for supporters Maintenance manual
The End Slides on possible observing targets to follow
POETS IRTF Engineering Observations Calibrations On-telescope biases On-telescope flats (sky and dome) Focus standard star target? ensure co-focal with SpeX Image variations due to pointing Check variations with telescope pointing Check variations at different airmass Calibrations On-telescope biases On-telescope flats (sky and dome) Focus standard star target? ensure co-focal with SpeX Image variations due to pointing Check variations with telescope pointing Check variations at different airmass Throughput & exp. times standard star target grid – range of stars from ~ 8 to 20 mag., B & R stars, versus range of exposure times in conv.and EM modes Throughput & exp. times standard star target grid – range of stars from ~ 8 to 20 mag., B & R stars, versus range of exposure times in conv.and EM modes
Engineering Observations II Possible science targets KBO and star for 06 May 2008 appulse Other KBOs Occultation candidate stars Possible science targets KBO and star for 06 May 2008 appulse Other KBOs Occultation candidate stars