Gas Development Master Plan Overview of the GDMP Model Capacity Building Workshop Bali, 1-2 July 2013.

Slides:



Advertisements
Similar presentations
Model Comparison: Top-Down vs. Bottom-Up Models
Advertisements

Outline Statistical Roadmap 9-11 June 2005, Helsinki Bart van Ark Groningen Growth and Development Centre University of Groningen This project is funded.
Energy & Competitiveness Twist Throughout Western Balkans Aleksandar Kovacevic Senior Visiting Research Fellow Oxford Institute for Energy Studies.
Use of National Statistics Data in the Manufacturing Technologies Association Presentation for the International Business Statistics Users Group Geoff.
Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
- 1 - World Gas Model Franziska Holz Joint Work with Ruud Egging, Steve Gabriel, and Jifang Zhuang Work in Progress Presented at the 4 th PhD Seminar of.
1 INDONESIA GAS/LNG DEVELOPMENT POLICY BY : DIRECTORATE OF PROCESSING AND COMMERCE DIRECTORATE GENERAL OF OIL AND GAS REPUBLIC OF INDONESIA APEC EGCFE.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 GDMP Overview.
Australia’s Gas markets
FNSB Gas Distribution System Analysis July 12, 2012 Patrick Burden Presentation to Fairbanks Community.
Sri Lanka ENERGY HUB Panel Discussion
California Energy Commission North American Market Gas-trade (NAMGas) Model: Key Drivers and Structure 2015 Integrated Energy Policy Report California.
A regulatory framework for gas quality treatment facilities: recap and update.
TRADE AND DEVELOPMENT REPORT, New York 14 October 2013 Adjusting.
1 Future of Global Energy Infrastructures: Yaroslav Minullin, Oleg Nikonov, Ivan Matrosov International Energy Workshop 2004 June 22, 2004 IEA, Paris,
The Structure of the REMI - Model. Output Market Shares Labor & Capital Demand Population & Labor Supply Wages, Prices, & Profits REMI Model Structure.
Future role of renewable energy in Germany against the background of climate change mitigation and liberalisation Dipl.-Ing. Uwe Remme Institute of Energy.
Input-Output Analysis of Climate Change: Case Study of Efficiency Driven Policy Choice of Indian Response Strategy Joyashree Roy Jadavpur University, Kolkata,
SGM P.R. Shukla. Second Generation Model Top-Down Economic Models  Project baseline carbon emissions over time for a country or group of countries 
California Energy Commission Integrated Energy Policy Report Lead Commissioner Workshop: Preliminary Results Natural Gas Common Cases California Energy.
WORLD ENERGY INVESTMENT OUTLOOK
IES Key points of Russian energy strategy up to 2030 – between Europe and Asia Dr. Alexey Gromov Deputy General Director Institute for Energy Strategy.
Russian Energy Strategy up to Period 2030: Questions, Troubles, Risks Dr. Alexey Gromov Deputy General Director Institute for Energy Strategy Moscow, Russia.
SECURITY OF GAS SUPPLY IN OPEN MARKETS LNG AND POWER AT A TURNING POINT INTERNATIONAL ENERGY AGENCY Security of European Gas Supply What are the important.
Arguments Against Nuclear Power Development in Iran May, 2003.
Gas Development Master Plan Scenarios for the GDMP Capacity Building Workshop Bali, 1-2 July 2013.
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
Uib.no UNIVERSITY OF BERGEN Development of Energy law Legal Challenges Professor Ernst Nordtveit Faculty of Law Insert «Academic unit» on every page: 1.
The Economics of Marine Renewable Energy Peter McGregor Fraser of Allander Institute, Department of Economics, University of Strathclyde Second Forum on.
APEC Energy Outlook and Security Issues The 6 th APEC Energy Ministers’ Meeting Manila, the Philippines 10 June 2004 Masaharu Fujitomi President Asia Pacific.
An electricity strategy for South Africa Hein Reyneke Country Manager, South Africa October 2014 PCTI/ /CoB/MRP/79.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
1 Are We Ready For The Future? 2005 NIPPC Annual Meeting September 8, 2005 Michael R. Niggli President, Sempra Generation.
1 NATIONAL STATISTICAL COORDINATION BOARD International Workshop on Energy Statistics, Beijing, China, September 2012 Vivian R. Ilarina, Philippines.
Russia as a key player on the world energy market Elena Telegina Director of the Institute of Geopolitics and Energy Security of Russia Member of the Board,
Masaru Aoki (Japan Research Institute) Long-term, Multi-sectoral Model for Interaction on Economy and Environment of Japan International Workshop for Interactive.
Gas Development Master Plan Structure of the Demand and Supply Scenarios (DASS) Component Capacity Building Workshop Bali, 1-2 July 2013.
Australia’s Experience in Alternative Transport Fuels An Overview.
National Petroleum Council Study Balancing Natural Gas Policy: Fueling the Demands of a Growing Economy September 2003.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Energy Systems Modeling at ERC The SA TIMES Model.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Updates on the RFE Energy Sector and the RFE LEAP model, and Implications of a Regional Alternative Path for the Russian Far East Victor Kalashnikov Economic.
The strategy for improved electricity distribution maintenance 9 June 2008.
Overview of the Cooperation and Major Schemes Bok-Jae Lee Senior Research Fellow.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
CEEH Energy System Optimisation Kenneth Karlsson Risø DTU, National Laboratory for Sustainable Energy Technical University of Denmark
Indo GDMP TIM Model Pilot Transportation Infrastructure Model (TIM) Demo version (GDMP Workshop June 2013)
The Canadian Approach To Compiling Emission Projections Marc Deslauriers Environment Canada Pollution Data Division Science and Technology Branch Projections.
Mr Ross Lambie Gas Manager, Energy & Quantitative Analysis Bureau of Resources and Energy Economics (BREE)
1 Office of the Chief Economist Global economic growth The outlook for the Australian resources sector Mark Cully APPEA Tax and Commercial Conference 29.
Gas Development Master Plan Introduction Capacity Building Workshop Bali, 1-2 July 2013.
Equipment Rating & Economic Evaluation. Course outline  Equipment rating  Economic evaluation of a flowsheet Engineering economic review Cost factors.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Russian Gas Project up to period 2030: Myth or Reality? Dr. Alexey Gromov Deputy General Director Institute for Energy Strategy Moscow, Russia World Independent.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
The Two-Country CGE for Malaysia and Indonesia for Energy Subsidy Removal Yanfei Li Energy Economist, Economic Research Institute for ASEAN and East Asia.
Estimation of Long Run Capacity Costs Gas TCMF 26 th April 2006.
Climate Change Scenarios Evaluated with MERGE-ETL and Technology Transfer Protocols S. Kypreos and H. Turton International Energy Workshop June ,
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
RUSSIAN DOMESTIC GAS MARKET Dr. Tatiana Mitrova 21 June, th Annual IAEE International Conference Bergen, Norway 420 West 118 th Street, New York.
Access Investment Model (AIM)
Kenya’s INDC: Actions in the Energy Sector
Atle Oglend, Petter Osmundsen, Tore Selland Kleppe
Energy Efficiency and Renewables role in the future energy needs
Variations in Economic Structure
Overview 2008 SNA (cont’d) Training Workshop on System of National Accounts for ECO Member Countries October 2012, Tehran, Islamic Republic of Iran.
Presentation transcript:

Gas Development Master Plan Overview of the GDMP Model Capacity Building Workshop Bali, 1-2 July 2013

2 Presentation Outline Introducing components of the GDMP Model: – Demand and Supply Scenarios (DASS) – Transport Infrastructure Model (TIM) Demand and Supply Scenarios (DASS) overview: – Objective and key questions – Key outputs Transport Infrastructure Model (TIM) overview: – Objective and key questions – Key outputs Key Results from the GDMP Model

3 Typical phases of a gas producing country Medium and long term planning perspective Economic cost of gas is (at least) current production cost + component (depletion premium) to reflect long run cost of substitute fuel (backstop fuel)

4 Changing perspectives … “Looks good” “OK so far” “Oh dear” “I hope we made good use of that gas”

5 The GDMP modelling framework 2 key task areas o … optimizing the expansion of gas supply and transmission infrastructure in the medium to long term o … policy framework for supporting long-term gas sector development 2 timeframes o 20 years (2040) | 50 years (2070) 2 methodologies o Scenarios | Least cost optimisation 2 models o DASS | TIM

6 Components of the GDMP Model DASSTIM Demand scenarios Supply scenarios Export scenarios Price scenarios Optimisation for infrastructure Unmet demand Excess supply Infrastructure costs Adjusted export Revenue calculation Results New infrastructure to meet domestic demand Cost of new infrastructure Government revenues

7 Demand and Supply Scenarios (DASS) – Overview INPUT DATA Supply input sheet Demand input sheet Global parameter sheet CALCULATION CONTROL PANEL Demand calculation sheet Supply calculation sheet OUTPUTS Demand by region and by sector Annual production by region TIM Supply-demand graph (initial) SCENARIOS Input from TIM PSC terms input sheet Adjustments sheet Revenue calculation sheet Supply-demand graph (adjusted) Government revenue Price input sheet Price calculation sheet Export input sheet

8 Objective of DASS and key questions Key issues: selecting parameters to simulate different demand scenarios, different policy options, and different price scenarios. Objective of DASS: 1.Estimate domestic demand, export, and supply projections up to 2070 based on selected scenario parameters 2.Calculate estimated government revenue based on selected scenario and cost of selected infrastructure (from TIM) Key questions: What are the factors and how will they effect demand and export? How will price of gas (domestic and export) change over time? What are the policies that will effect demand? How are these policies effect demand? How will government revenue be effected by the different demand scenarios? How will the cost of infrastructure (from TIM) effect government revenue?

9 Key outputs of DASS Initial output projections Domestic demand projections for major industries, electricity generation, domestic distribution (households and small commercial), and transport by region Export projections based on existing contracted volumes Supply projections based on production volumes of each region Adjusted outputs based on results from TIM Estimated government revenue based on selected demand and supply scenario and cost of new infrastructure from TIM New demand and supply balance

10 DASS initial outputs: demand and supply projections

11 Transport Infrastructure Model Overview DASS inputs INPUT DATA Demand data Transport costs used in minimisation CONTROL PANEL RESULTS Infrastructure cost and timing requirements by region SCENARIOS Supply data Export data Connection Concepts Run minimisation Interregional LNG and pipeline flows S/D balances, exports, and unmet demand by region

12 Key issue for Gas Infrastructure Policy: supply centres removed from major demand centres Objective of TIM: identify set of least cost infrastructure options to balance supply and demand across regions until 2040 Key questions What is the last cost infrastructure portfolio to balance regional supply and demand? What are optimized interregional LNG and pipeline flows? What are the liquefaction, regasification and interregional pipeline capacity requirements in each region? What is the volume of unmet demand/imports in each region? What is volume of excess supply, i.e. gas not consumed domestically or exported? What is the cost of delivered gas in each region? Objective of TIM and key questions

13 Key outputs of TIM Infrastructure planning Liquefaction, regasification and pipeline capacity needed to supply gas into each region Optimized pipeline and LNG flows across regions Earliest year gas transport infrastructure in each region is needed Export and production policy Level of unmet demand, i.e. domestic demand that cannot be covered by domestic production Volume of excess production, i.e. scheduled production that is neither exported nor domestically consumed Investment requirements Total cost of infrastructure requirements to balance supply and demand

14 Output: Regional S/D balances, unmet demand, exports and interregional flows

15 Output: Interregional flows by connection concept

16 Output: Costs, capacity requirements and throughputs

17 Key results of the GDMP Model Infrastructure planning List of infrastructure needed to meet domestic demand, earliest year needed and cost of infrastructure Adjusted demand-supply balance Government revenue Estimated government revenue based on selected demand and supply scenario and cost of new infrastructure from TIM

18 GDMP Model Key Results – list of infrastructure plan Which locations are being connected by the new infrastructure What is the connection types If it is an existing infrastructure, what is the existing capacity What is the additional capacity needed What is the total cost and unit cost to build the additional capacity

19 GDMP Model Key Results – new demand supply balance Grey area shows excess supply from this region After running TIM, excess supply is now transferred (purple bars) to other region(s) TIM only runs to 2040 If transfers exceed production, could mean that this region imports gas and then transfer to other region(s) Example from Central and South Sumatera

20 GDMP Model Key Results – Estimated government revenue and economic value Discounted costs, to 2050 Undiscounted costs, to 2070 – very large unmet demand (depends on scenario)