Program Overview. Overview of Program Content to Date – Student satisfaction results Review of Train the Trainer Workshops – Trainer satisfaction results.

Slides:



Advertisements
Similar presentations
P ERSONAL A CTION P LAN. CHAPTER 1: The Ten Faces of the Fearless Foreman CHAPTER 2: Professionalism, Safety, Integrity, and Quality CHAPTER 3: Effective.
Advertisements

TOTAL QUALITY MANAGEMENT (TQM) Increasing Productivity.
Health and Safety Chapter 10.
Unit 252 Planning and monitoring work
Skilled Trades 1201: Unit 2 Topic 1 Technology and the Workplace Part 4.
Reasons for Evaluating Training Companies are investing millions of dollars in training programs to help gain a competitive advantage. To justify the costs.
Systems Analysis and Design 9th Edition
1 The MBMA believes the information in this presentation to be accurate and delivers this presentation as a community service. As such, it is an academic.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
Project Management Workshop. Nick Cook  Citigroup Corporate and Investment Bank  European Technology Business Office Manager Edinburgh University April.
JOB FUNCTION EVALUATION Lowering Your Accident Costs.
Visual 1.1. Visual 1.2 What is CERT? The Community Emergency Response Team (CERT) program helps train people to be better prepared to respond to emergency.
Instructional Plan and Presentation Bernard Q Mallada CUR/516 Dr
Contents Click the link below to go directly to the slides for that chapter. Chapter 1 ■ Your Personal Strengths Chapter 2 ■ The Roles You Play Chapter.
1 Lecture 6 The Systems Analyst (Role and activities) Systems Analysis & Design Academic Year 2008/9.
Rev: Section 1 Overview of Fall Protection.
TEAM MANAGEMENT SERIES: COACHING INDIVIDUAL PERFORMANCE UCP Central PA Supervisor Meeting November 20, 2014.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Good Customer Service Needs Good People Management.
Induction and Training
Staying Healthy and Safe Make Safety Your Business
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
7 th District Code of Excellence Training Program Welcome.
The Financial Plan © 2010 Pearson Education, Inc. All rights reserved Chapter 2.
Safety and PV Module 16 Fall Working Safely with PV Common Sense aspects: –Cluttered workspace leads to tripping –Working on sloped roofs, secure.
Improving Safety through Efficiency in the Construction Industry – Is it a Fallacy? Presented by: Todd Hohn Brian Roberts.
Copyright © 2013 by The National Restaurant Association Educational Foundation. Published by Pearson. All rights reserved. HOSPITALITY HUMAN RESOURCES.
On Target Group Coaching for Painting Contractors November 6, 2014.
VIRTUAL BUSINESS RETAILING
On Target Group Coaching
Chart Your Course to Business Success On Target Business Intensive: Session 6 May 1, 2012 Advisors On Target 1.
 Journeyman  Management  Specialization  Teaching  Owning a business.
Performance Improvement. 2 Steps to Performance Improvement 1. Define the Problem 2. Define Duties or Behaviors to be Improved 3. Establish Priorities.
An An IBEW ® Program of Job Responsibility The IBEW Local 38 Code of Excellence.
7-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Leadership Development at YouthBuild. Examples of Leadership Development and Youth Voice in YouthBuild Programs.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
1 Ch16 Safety and Middle Managers Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 17- Week 12 2 nd Semester 2008/2009.
INTD 55 business practices charging for your services.
Copyright © Introduction to OSHA Electricity II Review.
MANPOWER PLANNING.
Safety Course Think, Talk, and Walk Safety Be Safety Conscious at Home, Work, Everywhere! Mr. Sherpinsky’s Safety First Presentation Council Rock High.
Problem Based Learning ACTE Presentation on the Critical Skills Classroom.
Chapter 7 The Practices: dX. 2 Outline Iterative Development Iterative Development Planning Planning Organizing the Iterations into Management Phases.
JFK-103B1W2 JFK-102B3W2.  Are you having trouble with your skills?  We can help you with that! Our training program has helped many people all across.
Behavior Observation ASA/AEA SAFETY +. Unsafe Acts Are Responsible For 98% Of All Incidents.
Understanding the Estimate – Part 1 Foreman’s Development Series
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Unit-5 TQM culture Presented by N.Vigneshwari.  Culture is “the sum total learned beliefs, values, and customs that serve to direct the consumer behavior.
Chart Your Course to Business Success On Target Business Intensive: Session 8 May 15, 2012 Advisors On Target 1.
Effective Teamwork Team Building
Measurement and Payment
Business Acceleration Program Fall 2015 Session 10 November 19, 2015.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Toolbox Meetings What is a toolbox meeting? An informal 5 to 15 minute meeting held by supervisors used to promote safety.
Management, Supervision, and Decision Making Chapter 2.
ACCIDENTS COST EVERYONE. ACCIDENTS COSTS Direct Costs Medical Compensation Time lost from work by injured worker Loss in earning power Economic loss to.
Directors, Managers, & Supervisors Safety Responsibilities.
7-1Design of Work Systems  Job design involves specifying the content and methods of job. IN general the goal of the job design is to create a work system.
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
Motivation A key to company success. Two cases what would you do (in teams) Case 1: Bread factory. Physical labor. Hot. Paying employees minimum wage.
Section 14.1 Teamwork Back to Table of Contents. Chapter 14 Teamwork and LeadershipSucceeding in the World of Work Teamwork 14.1 WHAT YOU’LL LEARN How.
7 Design of Work Systems.
Balance Work and Family Life
Basement Finishing - Creative Ideas & Cost
(Lecturer in Mech. Deptt.)
C3 Orientation.
SAFETY + Behavior Observation.
Presentation transcript:

Program Overview

Overview of Program Content to Date – Student satisfaction results Review of Train the Trainer Workshops – Trainer satisfaction results Next Steps – Program Guidelines Review of Production Module

Action Learning and The Foreman’s Development Series

Why Become a Foreman? Why do you want to become a foreman? – Take on the responsibility to have a greater impact on a project. – You are ready to take on new challenges and learn new skills. – Share your knowledge and experience with others. – You are a problem solver.

What Does A Foreman Do? Project T.I.M.E.R.S. T = Tools I = Information M = Material E = Expectations R = Recognition S = Safety

The information presented in this program was: 13 5 The activities in this program were: Little Value Somewhat Helpful Very Helpful On the whole, how do you rate this module: Not Helpful Helpful Very Helpful Role of the Foreman Evaluations * 8 Locals

To become familiar with the documents, terms, methods and procedures that are necessary in a new project “start up.” To help ensure the greatest chance of a successful project by starting the project out right.

Specifications Questionnaire Submittal Questionnaire Activity using specs, submittals, contract, scope letter and drawings.

The information presented in this program was: 13 5 The activities in this program were: Little Value Somewhat Helpful Very Helpful On the whole, how do you rate this module: Not Helpful Helpful Very Helpful Project Start Up Evaluations * 4 Locals

Activity Discuss scenarios - explain/demonstrate how you would handle it and why.

The information presented in this program was : 13 5 The activities in this class were: Little Value Somewhat Helpful Very Helpful On the whole, how do you rate this class: Not Helpful Helpful Very Helpful Labor Relations Evaluations * 5 Locals

Objectives The purpose of this Module is to give you a brief overview of: How the electrical contractor gets work and the bid process involved. How the Contractor arrives at his cost estimate. How the successful bid estimate is turned into the Job Budget of labor and material that you, as the Foreman, will be responsible for.

What’s the Point? When the Contractor is successful, the Job Estimate will affect all other aspects of the Project: Job Estimate Job Budget and Cost Codes Project Buy-Out Monthly Job Cost Reports Schedule of Values Man-Loaded Schedule 2 Week Look-A- Head Pay Application

Take off the Electrical Materials Required for this Room Scale is 2 squares = 1 foot 8’ T-grid Ceiling, Metal 24” OC. Room is 20’ from electrical panel Use ½” EMT & #12 THHN wire Use 4 sq boxes with 5/8” mud rings Use 6’ long, ½” flex to lights Receptacles are 18” AFF. UNO Switches are 48”AFF. Home runs are overhead at 8’-6”AFF

What do You Think? Group Activity For the average Union Electrical contractor the total Estimate costs can be broken down into the following typical percentages: ? % - Material ? %- Labor = ? % wages + ? % Labor Burden ? %- Jobsite overhead = ? % - D.J.E. or Direct Job Expenses + ? %- Company overhead + ? %- Profit (Of the gross project price, before taxes) = 100%

Average Job Costs For the average Union Electrical contractor the total Estimate costs can be broken down into the following typical percentages: 34% - Material 42%- Labor = 28% wages +14% Labor Burden 9%- Jobsite overhead = 85% - D.J.E. or Direct Job Expenses +12%- Company overhead +3%- Profit (Of the gross project price, before taxes) = 100%

What Costs Can We Control? As Foremen, what part of the Job Costs do we have control over? Which ones can we improve upon?

The information presented in this program was: 13 5 The activities in this class were: Little Value Somewhat Helpful Very Helpful On the whole, how do you rate this class: Not Helpful Helpful Very Helpful Understanding the Estimate Evaluations * 4 Locals

Objectives –Understand common terms used in Scheduling. –Compare GC Schedule and Electrical Budget to learn how they relate to each other. –Understand how to use the GC Schedule and Electrical Budget to man load a project. –Learn how to utilize the man loading data to develop a Three-Week Planner.

Introduction

Manpower Graph Per GC Schedule

The information presented in this program was: 13 5 The activities in this class were: Little Value Somewhat Helpful Very Helpful On the whole, how do you rate this class: Not Helpful Helpful Very Helpful Manloading and Scheduling Evaluations * 4 Locals

The Foreman’s Role In Jobsite Safety

Objectives The purpose of this Module is to explore the Foreman’s role in: Creating an Injury Free workplace –Values and Choice Motivating Safe Behavior Key Safety Practices

Pre-Task Plan Scenario Overhead work The upper floors are ready for the overhead conduit rough-in. The space from floor to floor is 16’. The Tinner and Plumber have already run their ductwork and pipe racks and the framer wants to install his firewall framing and rock the above ceilings so the fire stopping can be completed. Should this work be done off of ladders or scissor lifts? What tools and materials will be required? What are the hazards? Is fall protection required?

Module Summary An Injury Free Environment is the goal. Safety must be a value and a choice. The Benefits of this will be saving lives, reducing costs and improving productivity Be a leader, set the example, enforce the rules –without exception Train, communicate and motivate Take the time on your job to do it right! …and the people in our care will make it home from work again tonight – healthy and alive !!

The information presented in this program was: 13 5 The activities in this program were: Little Value Somewhat Helpful Very Helpful On the whole, how do you rate this module: Not Helpful Helpful Very Helpful Safety Evaluations * 4 Locals

Discuss why communication is important Explore the common barriers to good communication and how to resolve them Apply proven techniques to improve your daily communication. Learn how to navigate through conflict situations and difficult conversations.

Add Dave Elkins Video

 List some of the people that a foreman communicates with on a daily basis.  How might the communication differ from one group to the next?

Get one table to deliver a daily plan. Drawing from the 3 x 5 cards this table will demonstrate the roles assigned. Do not share your roles with other team members or the rest of the class.

As a Foreman, communication is one of the most important skills you can develop. It is worth spending the time to get it right. Active Listening is a key part of good communication skills. Use both positive and constructive feedback when communicating with your crew. When dealing with conflict remain calm.

OBJECTIVES To examine the various problems associated with ordering and handling jobsite materials To study a series of Best Practices that will result in better Material Management on your project.

Major Goals 8 hours of material within 10 feet of Installer - How many of you have seen this happen? Handle your materials as few times as possible -On average how many times do you think material is moved on the job before it is installed? 8 Times! (Based on study by the University of New Mexico and Texas A&M) How do we achieve these goals? Get a System!

Lost Time Unnecessary Breaks Personal Breaks Late Start/ Early Quit Direct Work Redo 0.06 Waiting for Tools, Information or Material

Pre-Fab Greatest Opportunity for Saving

Summary Every Foreman struggles with Material Management – There are no perfect solutions – Every job will have unique challenges Set up an effective Material Management System that works - Ordering, Handling and Removing The Goal is 8 hours worth of material within 10’ of your workers and NO LOST TIME! Good Material Management on your project will: – Make your life easier and the job run smoother – Save your company money on both labor and materials

Documentation - Objectives

Activities Gave them a scenario illustrating a difficult day, and had them fill out a Daily Report Form. Gave them a narrative and had them fill out a Time Card.

Module Summary Generally… everything on the job should be documented. Documentation should be objective and factual Accuracy is top priority Documentation needs to be organized and done in a timely manner.

Change Management Managing Production Project Closeout