Gas Regional Initiative – North West Region IG meeting The Hague – 25th March, 2009 Open Seasons Coordination Marie-Claire AOUN – CRE

Slides:



Advertisements
Similar presentations
Open seasons in European Markets: Overview and initial lessons learned Dominique Jamme ERGEGs Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
Advertisements

1 In France, new capacity is developed and allocated via open season procedures The GGPOS establish how an open season should be conducted To compete with.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
RCC Meeting 13 December 2007 Interconnections: primary market IP Taisnières / Blaregnies / Quévy IP Taisnières / Blaregnies / Quévy IP Obergailbach / Medelsheim.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
Early implementation of CAM : PRISMA initiative GRI South – SG Meeting Madrid, 30 April 2013.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Gas Regional Initiative - Region North / North-West Stakeholders Group Meeting The Hague, October 9th, 2006.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
GRI NW Investment - From virtual to measurable support Update on project Common effort on making regional investment happen Hague 4 june 2010.
Towards Regional Independent Operators – a main driver for successful market integration.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Investment workstream 20 October 2008 Investment project (I1)‏ Update on Consultation Presentation at account and by project manager.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Classification: Internal Status: Draft ERGEG GRI NW Investment Workstream Shippers’ contribution Helga FRANSE, Jerome DUROYON,
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Gas Regional Initiative – North West Region London 13 and 14 November 2008 Project manager: Erik Rakhou Investment project – I1 (in co-operation with I2)
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Gas Regional Initiative – North West Region Paris Workshop 11 May 2007 Workshop on Interconnections & Primary Capacity Market Kick-off Meeting on IP 14.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
North West Region Gas Regional Initiatives Regulatory Co-ordination Workshop 23 rd April 2007.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Marie-Claire AOUN CRE
Gas Regional Initiative
GRI NW TRANSPARENCY PROJECT
Presentation transcript:

Gas Regional Initiative – North West Region IG meeting The Hague – 25th March, 2009 Open Seasons Coordination Marie-Claire AOUN – CRE

2 IG meeting The Hague – 25 March, 2009 Agenda 1.Aims of the project 2.Overview of some open seasons in the region 3.Confidentiality in open seasons 4.Other issues to be dealt with in this project

3 IG meeting The Hague – 25 March, 2009 Aims of the project  OS increasingly becoming the standard procedure for major investment decisions in many MS  Some OS have met difficulties in particular with regards to coordination  Confidentiality clauses  GGPOS published by ERGEG in May 2007: Provide basic requirements for ensuring transparent and non- discriminatory open seasons Structure the OS in two phases Provide general guidance for the coordination between adjacent TSOs and concerned NRAs  There is a need to provide more concrete guidance on the coordination of open seasons.

4 IG meeting The Hague – 25 March, 2009 Aims of the project  The project focuses on the coordination of open seasons, but also addresses other difficulties encountered by past and present open seasons  Aims of the project: Propose practical solutions on the basis of the experiences gained from OS organised in the region Provide advices to the GGPOS (monitoring launched by ERGEG in 2009)

5 IG meeting The Hague – 25 March, 2009  1st experience of coordination and sharing of information between TSOs and NRAs  1st phase: April-July 2007: 39 shippers in Belgium and 37 shippers in France  Nov-Dec 2008: GRTgaz side = 17 binding agreements - Fluxys side = 14 binding agreements  Capacity available in Dec Overview of some open seasons in the region Open season GRTgaz/Fluxys

6 IG meeting The Hague – 25 March, 2009  Positive points: Good cooperation and information sharing between involved parties Definition of consistent timeframes and coordination on contractual aspects: consistency in the capacity allocation scheme Memorandum of Understanding between GRTgaz and Fluxys Open season 2012 of GTS: Possibility for shippers to adjust their capacity requests thanks to the update of the timing of phase 2 of the open season  Critical issues: The OS was postponed during 9 months due to discussions on transit tariffs in Belgium Difference between the bids submitted in the 1st phase and binding agreements signed in the 2 nd phase. Lack of incentives for shippers to reveal their real needs (≠ E.ON GT open season or Energinet) Additional short term capacity on top of the requested capacity only provided on the French side (but the total amount of capacity (old + new) at each side of the border is equivalent) Overview of some open seasons in the region Open season GRTgaz/Fluxys

7 IG meeting The Hague – 25 March, 2009 Overview of some open seasons in the region Gastransport Services open seasons Split up of the OS: But without this coordination  Risk of capacity mismatch for shippers at transit routes Balgzand/Julianadorp ‘sGravenvoeren Bocholtz  GTS Open season 2005 leading to capacity in 2010 (H-Gas) 27 participants phase I – 17 participants phase II  GTS Open season 2012 (executed in 2007) 42 participants in non binding phase The OS was split up into 2 phases Phase I: 23 binding agreements before 1 Feb Phase 2 for exits Bocholtz and 's Gravenvoeren in order to give the opportunity for participants to align capacities with EGT and GRTgaz/Fluxys open season - ongoing

8 IG meeting The Hague – 25 March, 2009  Open season launched on the whole network Non binding phase : 102 customers 44 unilateral binding agreements  Commitments: 80% for long term capacity contracts ( ≥ 15 years) 5% for short and medium term capacity contracts (≤ 5 years)  Shippers had to pay fees to submit non-binding requests during the non binding phase  Coordination with adjacent TSOs: Little coordination with adjacent TSOs, partly due to the large network area and to the important number of IPs covered by the OS Problems of coordination with GRTgaz (Medelsheim/Obergailbach): confidentiality clauses for sharing information with adjacent TSOs  Contracts agreements not signed yet due to dialogue with BNetzA on investment budgets Overview of some open seasons in the region E.ON Gastransport (EGT) open season

9 IG meeting The Hague – 25 March, 2009 Confidentiality clauses stakeholders 1.Prevent stakeholders from disclosing information to third parties (including regulators) on the OS process, within the GRI and European regulatory framework PB meeting 19 Dec. 2008: Ask operators to change standard used confidentiality clauses in better appropriate clause. 2.Clauses that prevent operators from sharing data (related to the OS with the operator of an adjacent system)  Obstacle to coordination PB meeting 19 Dec. 2008: PB sees no problem for functionally unbundled operators to share information on bids for OS Operators Group meeting 15 Jan. 09: Identification of information exchange consistent with efficient coordination Proposal to adapt these clauses in order to avoid unnecessary prohibition of information and waive the obligation for the users to write to the operators each time they communicate with regulators, or with other market parties.

10 IG meeting The Hague – 25 March, 2009 Proposal of definition of the information to be shared between adjacent TSOs during an OS  Minimal coordination between two functionally unbundled TSOs is required.  Adjacent TSOs should share at least information concerning technical aspects, timing of the investments.  Two adjacent TSOs (functionally unbundled) should also exchange information on the bids, such as:  Aggregate amount of capacity per point  Amount of capacity per point per participant (anonymously)  Exchange of commercially sensitive data related to the open season In some cases, the adjacent TSO could need information on the identity of the participants (for ex. in case of a mismatching of capacities requested on each side of the border). There should be no legal or contractual barrier to exchange the amount of capacity requested per point per participant under the following conditions:  Upon participant’s consent;  The operator receiving the information is functionally unbundled;  The operator receiving the information treats this information on the same confidentiality basis.

11 IG meeting The Hague – 25 March, 2009  Cross border network integrated approach: one open season for both networks  one investment decision  If legally possible, GTS and Gasunie D will try to develop one product and one contract (good testcase)  Synchronization with Energinet.dk, open invitation to other adjacent TSOs  Sharing of information with operators of adjacent systems:  GTS shall have the right to disclose confidential information to a neighbouring network operator to the extent deemed necessary by GTS in order to tune the relevant capacities  The neighbouring network operator is bound by confidentiality arrangements similar to those between Customer and GTS. Ongoing open seasons in the region Integrated open season GTS – Gasunie D. 2009

12 IG meeting The Hague – 25 March, 2009  Model paper : Dialogue on Open season design (Nov. 2008) - 1 st phase (Feb. 2009) – 2 nd phase (Aug. 2009)  Capacity bids for each point can vary by +/- 15% from the 1 st phase to the 2 nd phase – but tariff estimates are not expected until the 2 nd phase.  Need for coordination with adjacent SOs (Gassco, Gas System, Swedegas, E.ON Gastransport, DONG Energy Pipelines, Gasunie Deutschland)  Exchange of information with adjacent TSOs on a need-to-know basis. Differentiation between fully independent and bundled TSOs Ongoing open seasons in the region Energinet.dk Open season 2009 Confidentiality clause: Energinet may disclose the following:  Information, bidding forms to operators of adjacent systems if the participant has not restricted such disclosure. Adjacent operators are under confidentiality commitment.  Aggregate amount of capacity per point during phase 1  Names of the participants who have entered capacity agreements (without the amount of capacity acquired by each participant)

13 IG meeting The Hague – 25 March, 2009 Discussion on way forward: Other issues to be dealt with in this project  Flexibility in open seasons contracts: Capacity alignment  Provide to shippers the possibility to get out of the bids if they do not get adequate capacity in adjacent OS  Need to analyse more the reliability of the 1st phase  Significant differences between the requests of the 1st phase and the binding agreements in the 2 nd phase  Need to define a mechanism to stimulate realistic requests: fees, limit variation of the capacity bids between 1st phase and binding phase  views of IG about the reliability of the 1st phase?  Additional capacity for short term needs  Interest from the industry (SG meeting 14 Nov. 08) for building additional capacity for short term needs (or SoS reasons) on top of the capacity requested during the OS

14 IG meeting The Hague – 25 March, 2009 Conclusion  Coordination between TSOs and NRAs is possible as proved by the ongoing coordinated open seasons  Different degrees of coordination are possible: Full coordination as GRTgaz/Fluxys & GTS/Gasunie Timing synchronisation and flexibility in contracts as GTS 2012 Minimal coordination is required, with an appropriate sharing of data related to the OS with the adjacent TSO  Coordination with adjacent TSOs may be difficult (but necessary) especially if the OS is conducted on the whole network  It is a fundamental condition to avoid risky situations for shippers and to provide them with the highest degree of visibility.