Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
ILD meeting Welcome/Introduction 2015/4/23 Y. 1.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
Charge to the SiD Workshop Andy White University of Texas at Arlington.
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
1 1 LCC Physics and Detector Hitoshi Yamamoto ILD WS, Kracow Sep 24, 2013.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
F R&D on Monolithic and Vertically Integrated Pixel Detectors Special Focus Meeting Marcel Demarteau LCWS08 November 17, 2008 Chicago.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
1 1 LCC Physics and Detector Hitoshi Yamamoto LCWS2013, Tokyo November 11, 2013.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.
Status of the ILC Detector activities Project Advisory Committee October 20, 2008 LPNHE,Paris Sakue Yamada 1.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
General news, future LC organisation, update on CDR Vol3… Lucie Linssen L. Linssen, CLIC physics and detector monthly meeting, May 14th
Software Common Task Group Meeting Akiya Miyamoto 6-June-2011.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Online Reconstruction 1M.Ellis - CM th October 2008.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Eugene October
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
Recent Development of Detector Activities for ILC CCAST07 Nov Introduction Call for LOI & mechanism of selection IDAG Benchmarks Common.
ILD SiD CALI CE LC- TPC FCAL R&D group (ILC) group (ILC) “collab” (CLIC)  host lab “collab” (LC) “collab” (LC) “collab” (LC) R&D groups involved in “world-wide.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
WORKSHOP CHARGE ACFA Physics and Detector Workshop Tsukuba, Apr 17, 2009 Hitoshi Yamamoto Tohoku University.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
Report from the spokesperson -- CLICdp IB meeting Febr. 5 th Lucie Linssen, CLICdp IB, February 5th
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Memorandum of Cooperation for the CLIC detector and physics study Lucie Linssen Monthly meeting 19/11/
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Relations with concept groups
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Brief summary of discussion at LCWS2010 and draft short term plan
Strategy Ties Behnke
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
The DBD: Outline and Scope
Update of the Detector Program for ILC Sakue Yamada March
Workshop charge F. Richard for the WWS-OC
Presentation transcript:

Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups SB2009 working group Joint working group for ILC-CLIC detectors cooperation 2010/2/261S.Yamada

Detector Activity came into new phase after the validation. Purpose of the present work: In 2012, when GDE completes the ILC design to propose the project to governments, we wish to present that detectors can be built to pursue desired physics at ILC. Each validated detector group aims to complete its detailed baseline design, which is still conceptual but detailed enough to design MDI parameters and integration with the accelerator, and to allow realistic physics simulations. 2010/2/262S.Yamada

Three key points Each group establishes its plan toward the goal with mile stones. (There are 9 items to be considered in the planning.) The five common task groups will play important roles in the new phase. (Time for competition is over and cooperation between the two groups are crucial, particularly when resources are limited.) IDAG will monitor the progress of the two detector groups and the activities of the common task groups through (IDAG resumes its activity during this WS.) 2010/2/26S.Yamada

The first planning was made last October and is being refined. The 9 items include e.g. R&D for critical components to demonstrate feasibility, Define baseline design including realistic support structure, holes, I/O cables, etc. Settle Push-Pull scheme Study new benchmarks, which are suited to demonstrate the ability of ILC, and including some reactions to check performance at 1 TeV. 2010/2/264S.Yamada

Both ILD and SiD groups tried hard to make their detailed plans. These plans were made with a warning that they were the best the groups could do at the time, and the plans could be modified in the future. Difficulties are: 1.that the resources for the activity are NOT clear over the coming years, both for R&D budget and human resources, 2.that they need to discuss with various R&D collaborations, which requires time. Planning of the groups (contnd) 2010/2/265S.Yamada

ILD ( October 2009) 2010/2/266S.Yamada

Milestone Finalise procedure ILD Main Milestones ( Updated Feb.2010) Year QuarterQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 R&D Detector integration Detector optimization Simulation Software Reconstruction Software Large Scale Production 1 Reconstruction Software Large Scale Production 2 Review Options Review Alternatives Continuing integration Physics analyses Define Detector Write DBD Milestone Define hardware based detector Milestone Define Simulation detector Hardware reviews Exact date to be discussed 2 simulation scenarios 2010/2/267S.Yamada

Milestone Finalise procedure Main Milestones Year QuarterQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 R&D Detector integration Detector optimization Simulation Software Reconstruction Software Large Scale Production 1 Reconstruction Software Large Scale Production 2 Review Options Review Alternatives Continuing integration Physics analyses Define Detector Write DBD Hardware reviews Exact date to be discussed Milestone Define hardware based detector Milestone Define Simulation detector Detailed plans by the R&D collaborations exist and are being coordinated with the ILD plans 2 simulation scenarios 2010/2/26 8 S.Yamada

SiD also lists required and available resources for each item. SiD (October 2009) 2010/2/269S.Yamada

2010/2/2610S.Yamada

Crucial points The participating groups assume they obtain needed resources. They will make efforts. Outcome ? There is unbalance observed among the regions. Also, presently available budgets are ending soon. Human resources are also VERY important and limited. There will be supports needed from laboratories, including engineering experts for detailed design work of critical parts. These problems were reported to ILCSC last month. Regarding engineers, there was an offer to look for possible help. I hope difficulties were understood by ILCSC. However, whether this will result in additional support is not known yet. It may depends on each lab. 2010/2/2611S.Yamada

If these problems are not solved, the detailed plans become meaningless. Soon we may have to THINK carefully. A possibility: review the 9 items and make less ambitious and possible list by keeping the very minimum, which will be needed for ILC proposal. Are there other possibilities ? 2010/2/26S.Yamada

IDAG Some preparatory discussions in Albuquerque, last September and basic ideas were agreed although details will be fixed during this workshop. IDAG will monitor the two groups, to help them accomplish their goal. IDAG monitors also the common task groups. IDAG will meet during LC workshops twice a year, will meet with detector groups and CTGs. IDAG will look into some written reports, too. 2010/2/2613S.Yamada

IDAG (continued) Plans for this meeting IDAG will discuss details of how to monitor. They will interview the two detector groups. IDAG will meet the MDI common task group to survey its status. IDAG will study the new benchmark reactions, prepared by the physics common task group last November. The outcome will be reported by the chair in the plenary session on the last day. 2010/2/2614S.Yamada

Common Task Groups The 5 common Task groups are now made of the members of the validated two groups and the members from wider community. In order to reinforce the groups and to meet increasing tasks, some new members were added. In the CTGs the two detector groups should cooperate and they do so as expected. This WS is a good occasion for the CTGs to meet and discuss in individual meetings or joint parallel sessions. 2010/2/2615S.Yamada

Common Task Group Members Representatives of R&D collaborations Recommended by the wider community (3 th. +3 exp.) or added by the group 2010/2/2616S.Yamada

MDI Group Validation lead to concentrated study of Push-pull scheme. Discussions between SiD and ILD started right after on common issues for the detector hall and push-pull issues. ILD members spent two months last summer at SLAC to discuss with SiD and ILC-BDS people: Ways to get to a common IR hall design where ILD moves on a platform and SiD does not, Common push-pull system, shielding design, Final focus magnets supports and alignment, Vibration studies. They meet with IDAG, and MDI sessions will be on the third day. 2010/2/2617S.Yamada

Engineering Tools group Now the group is reinforced and works are going on. They try to achieve the implementation of a system breakdown structure compatible to the two detectors and contact EDMS experts. A concrete result aimed for in the near future. 2010/2/2618S.Yamada

Detector R&D group The group has been making effort since last year to identify what are the critical items for R&D for the two groups to reach the goal, preparing a report documents, which is under discussions for some time. Their meeting during this WS will be important to complete the document. In his report at the last PAC, the convener stressed the crucial importance and serious necessity of R&D resources. It triggered a positive climate for improvement, while such efforts need to be continued. 2010/2/2619S.Yamada

Software Group Major items of activity includes Developments of software tools to add new functionality and new data models. preparing common data samples for works related to SB2009 which was needed urgently developing a plan for common data samples for new benchmark processes The group makes coordination of these works. Actual software development involve more members of the two detector groups. They often encounter the lack of human resources when they need experts. 2010/2/2620S.Yamada

Physics Group They studied new benchmark reactions last year and made report in November. The idea was to demonstrate the ability of ILC. These reactions are being examined by the two groups and software group, as well as IDAG from different view points. The group will investigate the possible scenario with the new LHC schedule. include some channels to evaluate ILC detectors at 1 TeV, as well as Higgs studies at 230GeV 2010/2/2621S.Yamada

Working group to study SB2009 In order to study SB2009 and communicate with GDE in a systematic way, a working groups was formed right after the Albuquerque meeting. Members: Jim Brau (management, convener) Mark Thomson(ILD), Mikael Berggren(ILD), Stewart Boogert(ILD), David Miller(ILD), Tom Markiewicz(SiD), Timothy Barklow(SiD), Takashi Maruyama(SiD), Norman Graf(SiD), Karsten Buesser(MDI), Akiya Miyamoto (Software), Keisuke Fujii (Physics) The contribution of the WG is important for rational consideration to seek good balance of cost and physics performance. The so-far obtained simulation results and opinions of the detector community will be presented by the convener tomorrow morning in the SB2009 pl. session. 2010/2/2622S.Yamada

ILCSC FALC GDE IDAG Det. Group Representative Common task representative MDI-D Det. R&D Software Physics Regional Contacts WWS organizers RD Executive Board R&D Collab. PAC Phys.& Exp.Board Engineering Tools Oct. 03, 2009 Th’s SIDSID ILDILD IR Integration SB2009- Working Group 2010/2/2623S.Yamada SB2009- Physics Questions Committee All the relevant parties are represented, and communicate with GDE, too.

Cooperation with CLIC detector activity The joint working group was made, following the suggestion of the ILCSC of last August It took rather long but finally the entire members were listed and the activity of the JWG will start soon. Marcel Demarteau, Lucie Linssen, Francois Richard, Felix Sefkow, Marcel Stanitzki, Mark Thomson, Sakue Yamada In the mean time, practical cooperation is already going on quite well among the people interested. The WG will survey these activities as one of its works and look for more possible synergies. The group will meet face to face for preparatory discussions during this workshop. 2010/2/2624S.Yamada

Summary The two groups are trying hard to refine their work schedule towards the detailed baseline design. Available resources will be crucial. IDAG will monitor their activities and CTG activities. It will start new monitoring here. Each common task group is reinforced with new members and is making progress. SW2009 working group is studying the consequence of SB2009 to physics and experiment. The first output was obtained and shared with GDE to start quantitative considerations. JWG for ILC-CLIC cooperation was formed and will start soon. On the other hand, practical works are already going on. 2010/2/2625S.Yamada

Back ups 2010/2/2626S.Yamada

ILCSC FALC GDE IDAG Det. Group Representative Common task representative MDI-D Det. R&D Software Physics Regional Contacts WWS organizers RD Executive Board R&D Collab. PAC Phys.& Exp.Board Engineering Tools Oct. 03, 2009 Th’s SIDSID ILDILD IR Integration 2010/2/2627S.Yamada

Detector R&D group The charge of the RD for the detector R&D common task group is to: Coordinate cooperation of detector R&D Respond to requests from IDAG and PAC on detector R&D Facilitate communication between LOI groups and R&D collaborations Survey R&D efforts and organize reviews when needed The group has been making big effort since last year to identify what are the critical items for R&D for the two groups to reach the goal. 2010/2/2628S.Yamada

Convener’s report summery at By elevating the importance of these R&D topics and providing in a timely manner limited additional resources, the experimental foundation for the detector concepts would be on a much stronger basis by 2012 Please note that, given the fragility of the detector community, it is equally essential to keep the other R&D programs at the current level A report is being drafted with these recommendations to the RD; We’re almost close to a consensus! 2010/2/2629S.Yamada

Common samples for SB2009 In order to study Higgs recoil mass performance at Ecm=350 GeV, common samples were made with following conditions. – Beam parameter: SB GeV with Traveling Focus – Processes: GunieaPig has been used to produce luminosity spectrum. We are informed that all problems are solved and some new samples have become available. Our plan is to study them using fast simulator 2010/2/2630S.Yamada

Consideration of physics cases for ILC Among several things they first consider Relation between the LHC physics and the case for ILC. The case for the ILC must take into account what is discovered at the LHC, like SUSY, stable sleptons, composite top, Z’ resonances, which could be discovered in early LHC program. In this context, the group will also study what can be a scenario with the new LHC schedule. 2010/2/2631S.Yamada

Updated Mandate Document (proposed by CLIC people) Joint Working Group on General Detector Issues ILCSC has encouraged formation of a CLIC/ILC General Issues working group on detectors by the two parties with the following mandate: – Promoting the physics and the detectors of the Linear Collider – Identifying synergies between the detectors of ILC and CLIC in performance studies, detector R&Ds, and Software tools – Discussing detailed plans for the ILC and CLIC efforts, in order to explore possible collaborations such as critical R&Ds on sub- detectors, coil studies, push-pull mechanism and MDI aspects – Discussing a possible format of collaboration between the ILC validated detector groups and CLIC The conclusions of the working group will be reported to the ILCSC and CLIC Steering Committee. 2010/2/2632S.Yamada