1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.

Slides:



Advertisements
Similar presentations
1 The OASIS OSLC Lifecycle Integration for Project Management of Contracted Delivery (OSLC PROMCODE) Technical Committee (TC) Agenda for the First TC Meeting.
Advertisements

TEST DESCRIPTION LANGUAGE Work Item DES/MTS-140_TDL – STF work plan © ETSI All rights reserved Andreas Ulrich, Siemens AG (Rapporteur)MTS#58,
IEC Substation Configuration Language and Its Impact on the Engineering of Distribution Substation Systems Notes Dr. Alexander Apostolov.
Overview of OASIS SOA Reference Architecture Foundation (SOA-RAF)
OASIS Reference Model for Service Oriented Architecture 1.0
TC3 Meeting in Montreal (Montreal/Secretariat)6 page 1 of 10 Structure and purpose of IEC ISO - IEC Specifications for Document Management.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Project Management Basics
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
S R S S ystem R equirements S pecification Specifying the Specifications.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
What is Business Analysis Planning & Monitoring?
S/W Project Management
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 PROMCODE Service Specification  PROMCODE.
OSLC Working group meeting1 PLM extensions proposal feedback Updated from OSLC workgroup call 18/10/11.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.
Effective Requirements Management – an overview Kristian Persson Field Product Manager, Telelogic Asia/Pacific.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Chapter 13 Architectural Design
Chapter 9 요구사항 모델링: 시나리오 기반 방법론 Requirements Modeling: Scenario-Based Methods 임현승 강원대학교 Revised from the slides by Roger S. Pressman and Bruce R. Maxim.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
© 2012 IBM Corporation Best Practices for Publishing RDF Vocabularies Arthur Ryman,
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model.
Simple Use Case of PROMCODE model June 25th, 2014 T. Kamimura.
Lecture 7: Requirements Engineering
1 All Rights Reserved, Copyright, Mikio Aoyama, 2014 OASIS OSLC PROMCODE TC Issues Discussed at The Ad Hoc Meeting during Innovate 2014 Memorandum Submitted.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.
© Mahindra Satyam 2009 Configuration Management QMS Training.
Project Management Processes for a Project
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.
S&I Integration with NIEM (DRAFT) Standards Development Support June 8, 2011.
Harmonization Project FAS Meeting Harmonization project and ISSAI 200 Purpose and scope of the project The purpose is to provide a conceptual basis.
WEC MADRID 18 TH MARCH 2004 ASTRAZENECA’S APPROACH TO SUPPLIER RISK MANAGEMENT.
Health eDecisions Use Case 2: CDS Guidance Service Strawman of Core Concepts Use Case 2 1.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model.
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
Ivar Jacobson, Grady Booch, and James Rumbaugh The Unified Software Development Process Addison Wesley, : James Rumbaugh's OOMD 1992: Ivar Jacobson's.
System Requirements Specification
PS -0 System Architecture Working Group RASDS Status 14 June 2006 Peter Shames NASA / JPL
Simple Use Case of PROMCODE model July 9th, 2014 Japan team (Aoyama, Yabuta, Yoshida, Matsumoto, Wkao, and Kamimura)
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
DEX Publication Project OASIS PLCS TC Face to Face meeting 10 March 2008 Trine Hansen.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
© 2013 Gartner, Inc. and/or its affiliates. All rights reserved. Gartner is a registered trademark of Gartner, Inc. or its affiliates. The Value Review.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Models of the OASIS SOA Reference Architecture Foundation Ken Laskey Chair, SOA Reference Model Technical Committee 20 March 2013.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
The Project Management Process Groups
The Software Lifecycle Stuart Faulk. Definition Software Life Cycle: evolution of a software development effort from concept to retirement Life Cycle.
Project Execution Methodology
Project Management PTM721S
Current Framework and Fundamental Concepts
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Chapter 13 Architectural Design
Specification Development and Review Team
TechStambha PMP Certification Training
System Requirements Specification
OASIS OSLC PROMCODE TC Recommended adoption of terms from OSLC Estimation and Measurement Service (EMS) Vocabulary Arthur Ryman 2015/01/19.
Chapter 9 Architectural Design.
Open Archival Information System
Presentation transcript:

1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited and Use Cases Development Plan of Specifications (Memorandum) Specification Development and Review Team Mikio Aoyama, Kazuhiro Funakoshi, Yoshio Horiuchi, Tsutomu Kamimura, Shigeaki Matsumoto, Arthur Ryman, Kazuo Yabuta, Hiroyuki Yoshida 2014/07/21, 08/05, 08/19 Specification Development and Review Team Mikio Aoyama, Kazuhiro Funakoshi, Yoshio Horiuchi, Tsutomu Kamimura, Shigeaki Matsumoto, Arthur Ryman, Kazuo Yabuta, Hiroyuki Yoshida 2014/07/21, 08/05, 08/19

2 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 Assumptions  Project Context  Context: Data Interface between Acquirer and Supplier  Supply chain is formed by chaining the Acquirer and Supplier through the PROMCODE interface  Scope of time: Assume the plan is completed and the project scope is defined, which implies that scope definition including planning is out of scope of PROMCODE  Project Context  Context: Data Interface between Acquirer and Supplier  Supply chain is formed by chaining the Acquirer and Supplier through the PROMCODE interface  Scope of time: Assume the plan is completed and the project scope is defined, which implies that scope definition including planning is out of scope of PROMCODE Organization A Organization Bn Organization Cnm AcquirerSupplier Acquirer * *

3 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 Domain Model Revisited (1/2)  Structure around ManagedItem  Attributes of ManagedItem: Add type for classification  Add “ManagedItemCollection” as a collection of ManagedItem, which represents a collection of status, or snapshot, of the project  Attributes: Add identifier and title  Add “Plan” and “Report” as subclasses of ManagedItemCollection:  Plan reflects an order from the acquirer to Supplier when the project is started  Report reflects a report compiled from the snapshot in ManagedItemCollection  Add “Project” as a reference to the project under management  The entity Project is only for reference, and is considered as out of scope of the PROMCODE domain model  Structure around ManagedItem  Attributes of ManagedItem: Add type for classification  Add “ManagedItemCollection” as a collection of ManagedItem, which represents a collection of status, or snapshot, of the project  Attributes: Add identifier and title  Add “Plan” and “Report” as subclasses of ManagedItemCollection:  Plan reflects an order from the acquirer to Supplier when the project is started  Report reflects a report compiled from the snapshot in ManagedItemCollection  Add “Project” as a reference to the project under management  The entity Project is only for reference, and is considered as out of scope of the PROMCODE domain model

4 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 Domain Model Revisited (2/2)  Structure Measure/Measurement  Add “MeasurementCriteria” as a criteria of Measure  Add attributes of type and title to Measure  Title: Bug density, Type: NoOfBugsPerKLOC, Unit: 1, Value: 3  Attributes  Structure Measure/Measurement  Add “MeasurementCriteria” as a criteria of Measure  Add attributes of type and title to Measure  Title: Bug density, Type: NoOfBugsPerKLOC, Unit: 1, Value: 3  Attributes Measurement MeasurementCriteriaMeasure Title + ++ Identifier + +NA Type + NA+

5 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 Domain Model (Revised Aug. 19)

6 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 Domain Model (Aug. 6)

7 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 Use Cases  Use vocabulary practically common in project management in contracted delivery ISO 21500:2012  Consistent with global standards: PMBOK, ISO 21500:2012  Use vocabulary practically common in project management in contracted delivery ISO 21500:2012  Consistent with global standards: PMBOK, ISO 21500:2012 Project Initiation and Planning Project Execution Acquirer Supplier Project Closing

8 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 Simple Use Case  User roles  Project manager of acquirer (PM-A)  Project manger of supplier (PM-S)  Pre-condition  A legal contract to bind an acquirer and a supplier is handled separately.  There is no cascading of acquirer-supplier relationships.  Project environment of an acquirer and a supplier are not shared; i.e., project environment of a supplier is not accessible to PM-A and therefore, project information needs to be sent to PM-A for project management by an acquirer.  Steps 1.PM-A and PM-S work together to define ScopeItems, WorkItems and artifacts as a plan and establish agreement between them. Details of steps in establishing agreement may vary and we will not specify them further.. 2.PM-S updates on regular basis actual values of properties of WorkItems and of measurements and measures attached to artifacts. This can be done by PM-A requesting a report to PM-S or by PM-S posting a report to an agreed location. 3.PM-S sends an update as a Report to PM-A. 4.PM-A reviews updates and takes actions such as such as creating and managing Issues. In particular, 1.Review the possibility of schedule delay 2.Review Quality Details of these will be elaborated in the next pages. 5.Repeat Steps 2-4 as necessary 6.Conduct acceptance review and close a project  User roles  Project manager of acquirer (PM-A)  Project manger of supplier (PM-S)  Pre-condition  A legal contract to bind an acquirer and a supplier is handled separately.  There is no cascading of acquirer-supplier relationships.  Project environment of an acquirer and a supplier are not shared; i.e., project environment of a supplier is not accessible to PM-A and therefore, project information needs to be sent to PM-A for project management by an acquirer.  Steps 1.PM-A and PM-S work together to define ScopeItems, WorkItems and artifacts as a plan and establish agreement between them. Details of steps in establishing agreement may vary and we will not specify them further.. 2.PM-S updates on regular basis actual values of properties of WorkItems and of measurements and measures attached to artifacts. This can be done by PM-A requesting a report to PM-S or by PM-S posting a report to an agreed location. 3.PM-S sends an update as a Report to PM-A. 4.PM-A reviews updates and takes actions such as such as creating and managing Issues. In particular, 1.Review the possibility of schedule delay 2.Review Quality Details of these will be elaborated in the next pages. 5.Repeat Steps 2-4 as necessary 6.Conduct acceptance review and close a project

9 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 Review and Actions at Step 4-1 (Schedule Delay)  Schedule Delay 1.PM-A compares previous report and current report and highlights the difference. 2.Reviews the difference and raises a concern if the following is observed. 1.No progress from the previous report 2.Risk of not meeting a schedule emerges with the current pace of progress. May use past data on productivity to project risk. 3.PM-A interacts with PM-S on further update. 1.Reasons for delay 2.Outlook of meeting a schedule. 4.Based on the interaction, PM-A takes one of the following actions. 1.No formal action, but with notice on the situation to monitor. 2.Create an issue on the situation and create actions 3.Escalate to stakeholders for possible plan change. 5.If it results in a plan change, it will trigger the process of plan change and information on schedule delay will be reset with new plan.

10 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 Review and Actions at Step 4-2 (Quality)  Quality Concern 1.PM-A compares previous report and current report and highlights the difference. 2.Reviews the difference and raises a concern if the progress is not sufficient and there is a risk of not meeting quality goal. 3.PM-A interacts with PM-S on further update. 1.Reasons of the current problem 2.Outlook of meeting a goal 3.Assess the impact to the overall project. 4.Based on the interaction, PM-A takes one of the following actions. 1.Create an issue on the situation and create actions 2.Escalate to stakeholders for possible plan change. 5.If it results in a plan change, it will trigger the process of plan change and information on quality situation will be reset with new plan.

11 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 TOC of Draft Specification (1/2) TOC Based on OASIS TOSCAPICPROMCODE Spec IntroductionMikio1. Introduction 2. Interface Specification Design 2.1 Dependencies on Other Specs4.2 Compliance ?: Core, FOAF, 2.2 Notational Conventions 2.3 Normative References5. References 2.4 Non-Normative References5. References 2.5 Typographical Conventions 2.6 Namespaces4.2.2 Namespaces 2.7 Extensibility? 3. Core Concepts and Usage Patterns 3.1 Core Concepts Mikio, Matsumoto Supply Chain Concept 2. PROMCODE Modeling Framework 3.2 Use CasesNew

12 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 TOC of Draft Specification TOC Based on OASIS TOSCAPICPROMCODE Spec PROMCODE Domain ModelYoshida3. PROMCODE Domain Model 4.1 Domain Model3.1 Domain Model 4.2 Examples of Project Models3.2 Examples of Project Models 5. PROMCODE Resource Definitions Wakao, Horiuchi 4. PROMCODE Service Specification 5.1 PROMCODE Resource Definitions4.3 PROMCODE Resource Definitions 6. PROMCODE Service Specification Wakao, Horiuchi 4.4 Service Provider Capabilities 7. Common Practices for Adoption4.5 Common Practices for Adoption Appendix: Example Appendix: Vocabulary, Resource Shape Funakoshi, Arthur

13 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 Time Line Revised MilestoneInitial PlanRevised TC LaunchedMar. 25, 2014 Start Writing Initial Working DraftAug. 5, 2014 Initial Working DraftMay 26, 2014Sep. 16, 2014 Committee Working DraftJun. 30, 2014Oct Committee Spec. Public ReviewJul. 31, 2014Nov Committee SpecificationSep. 15, 2014Dec Candidate of OASIS StandardDec. 2014Feb OASIS StandardMar Specification Development Team: Aoyama, Funakoshi, Horiuchi, Matsumoto, Wakao, Yoshida Specification Review Team: Development Team and Kamimura, Ryman, Yabuta

14 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 Upcoming TC Meeting Schedule Proposed Meeting ScheduleDate/Time [EST]Date/Time [JST] 8TC Meeting8:00 p.m., Aug. 59:00 a.m., Aug. 6 9TC Meeting8:00 p.m., Aug. 199:00 a.m., Aug TC Meeting8:00 p.m., Sep. 29:00 a.m., Sep. 3 11TC Meeting8:00 p.m., Sep. 169:00 a.m., Sep. 17

15 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 References [ 1] R. Cyganiak, et al. (eds.), RDF 1.1 Concepts and Abstract Syntax, W3C Recommendation, 25 February 2014, concepts /#dfn-iri [ 2] R. Cyganiak, An RDF Design Pattern: Inverse Property Labels, Jun. 2006, property-labels/. [ 3] A. G. Ryman, OSLC Resource Shape: A Language for Defining Constraints on Linked Data,. [ 4] A. Rynam, Vocabulary Annotation Vocabulary, Sep. 2013, [ 5] A. Ryman, Resource Shape 2.0, W3C Member Submission, Feb. 2014,