2010 Western Regional Gas Conference DIMP- Beyond the Final Rule August 24, 2010 Tempe, AZ Bruce L. Paskett P.E. Principal Compliance Engineer NW Natural.

Slides:



Advertisements
Similar presentations
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
Advertisements

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
2010 PODS User Conference Houston, Texas October 28, 2010 PHMSA Update John A. Jacobi, P.E. CATS Manager, SW Region.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Gathering Update Pipeline Safety – Getting to Zero Pipeline.
August 21, 2012 Western Regional Gas Conference Paul Gustilo Southwest Gas Corporation.
CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES.
Unregulated Low-Stress Hazardous Liquid Pipelines Mike Israni & John Gale Aug 5, 2009.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
Interstate Natural Gas Association of America INGAA Action Plan to Build Confidence in Pipeline Safety INGAA Integrity Management Continuous Improvement.
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
High Consequence Areas & Pipeline Assessment Intervals –Is there a need for change? Terry Boss Sr. VP Environment Safety and Operations Interstate Natural.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Overview of Key Rule Features
The Federal Regulator’s Perspective Industrial Railway Safety Conference Fort Saskatchewan, Alberta April 28, 2015.
You Don’t Always Have To Be Told What To Do Christina Sames Vice President Operations and Engineering November 2011.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Update Kenneth Y. Lee Engineering & Research Division
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline and Hazardous Materials Safety Administration Program.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
Western Regional Gas Conference August 25, 2010 Simple, Handy, Risk-based Integrity Management Plan (SHRIMP)
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
Excess Flow Valves – Implementation Challenges Bill Norton PIPES Act of 2006 PIPES Act of 2006 EFVs EFVs Anthony Cadorin City Of Mesa Sizing Procedures.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
South Dakota Gas Pipeline Safety Program 2011 Summary.
SHRIMP: Model Distribution Integrity Management Plan Development Tool John Erickson, PE American Public Gas Association.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Lessons Learned….. Were PG&E practices an anomaly or the tip of a bigger problem? How would we know? 2011 Pipeline Safety Trust Conference – Getting to.
Distribution Integrity Management John Erickson, PE American Public Gas Association.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
1 DIMSA A Distribution Integrity Management SME Approach August – 2009.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Distribution Integrity Management – What To Expect John Erickson, PE American Public Gas Association Western Regional Gas Conference.
RAILROAD COMMISSION OF TEXAS Alan C. Mann Oversight and Safety Division September 2015.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
An Industry Response to the Expected Control Room Management Rule Western Regional Gas Conference Daron Moore – El Paso Pipeline Group August 25, 2009.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
Pipeline Safety: How the Mayor’s Council On Pipeline Safety Can Help Presentation to: Mayor’s Council on Pipeline Safety Conference Name: Christopher A.
RAILROAD COMMISSION OF TEXAS Chairman David Porter Commissioner Christi Craddick Commissioner Ryan Sitton September 15-17, 2015.
What’s Wrong with Integrity Management? How Do We Improve Integrity Management? Terry Boss Senior Vice President Safety Environment and Operations PST.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Pipeline Performance Measures Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
1 Mike Israni Senior Technical Advisor Manager: National Standards July 30, 2009.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
U.S. DOT Pipeline and Hazardous Materials Safety Administration Integrity Management Systems November 18, 2015 Chris McLaren - 1 -
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Public Awareness Programs for Pipeline Operators WESTERN REGIONAL GAS CONFERENCE August 21, 2007 Presented by: Ross Reineke.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
Distribution Integrity Management Program
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention Update and Damage Prevention Rulemaking Sam.
State-Industry Regulatory Review Committee Phase 2 – SIRRC II.
1 Compression Fittings. 2 Background Advisory Bulletin ADB Advisory Bulletin PHMSA-RSPA Incidents Other Issues Post Failure Modes Other.
Gas Pipeline Safety Federal Regulatory Update Pete Chace Public Utilities Commission of Ohio Gas Pipeline Safety Program Manager.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
Federal Regulatory Update
U. S. Department of Transportation
Pipeline Safety Issues
Legislative & Regulatory Update on Validation of MAOPs of Transmission Pipelines January 17, 2012 Best Practices Kickoff Meeting Andrew Lu
Gas Utility Operations Best Practices Program
AGA Positions on Current PHMSA Rulemakings
SD INTRASTATE PUBLIC EDUCATION
AGA Operations Conference
2018 MDPB Annual Meeting May 24, 2018
Distribution Integrity
Presentation transcript:

2010 Western Regional Gas Conference DIMP- Beyond the Final Rule August 24, 2010 Tempe, AZ Bruce L. Paskett P.E. Principal Compliance Engineer NW Natural

NW Natural Company Background  Company founded in 1859  Operate in Oregon and SW Washington  Serve approximately 670,000 residential, commercial and industrial customers  Designed, constructed, own and operate 603 miles of transmission main and 21,000 miles of distribution mains and services  Company has installed over 160,000 single family residential EFVs since 1999

NW Natural and Pipeline Safety NW Natural is committed to the Safe, Reliable and Cost Effective delivery of natural gas to our customers.

NW Natural and Pipeline Safety Pipeline Integrity Management Programs-  Cast Iron Replacement Program-1983 to 2000  Bare Steel Replacement Program-2001  Natural Forces (Geohazard) Program-2001  Transmission Integrity Management Program-2002  Distribution Integrity Management Program-1983

The Evolution of DIMP  Pipeline Safety Improvement Act of Dec 2002  D.O.T. Inspector General Testimony – July 2004  AGF Study- January 2005  PHMSA Phase 1 Investigations- December 2005  GPTC DIMP Guidance- December 2006  PIPES Act- December 2006  DIMP NOPR- June 2008  DIMP Final Rule- December 4, 2009

Elements of a DIMP Program Written DIMP Integrity Management Plan must contain procedures for developing and implementing:  Knowledge  Identify threats  Evaluate and rank risks  Identify and implement measures to address risks  Measure performance, monitor results, and evaluate effectiveness  Periodic evaluation and improvement  Report results

Elements of a DIMP Program (b) Identify threats  Corrosion  Natural forces  Excavation damage  Other outside force damage  Material, weld or joint failure, including “compression couplings”  Equipment failure  Incorrect operation  Other

Elements of a DIMP Program  Based on the Final DIMP Rule, operators had all the information they needed to “Just Do it!”, right ?  Not exactly. The DIMP Rule has continued to evolve since the Final Rule. The “Final Rule” was not final!

DIMP - Beyond the Final Rule Post-Rule “Highlights”-  Effective Leak Management Program  Aboveground leak reporting  Excavation Damage Prevention Programs  New Annual Report Form (Form F )  Compression couplings vs. mechanical fittings  DIMP FAQs / Inspection Form / Pilot Audits  EFVs  Low stress transmission lines

Effective Leak Management Program-  1007(d) Identify and implement measures to address risks. Required as a risk mitigation measure under DIMP unless all leaks are repaired when found  Phase 1 Report defines effective LEAKS Program-  Locate the leak  Evaluate it’s severity  Act appropriately to mitigate the leak  Keep records  Self assess  Inspections will focus on Leak Programs DIMP - Beyond the Final Rule

(d) Performance Measures-  Number of hazardous leaks eliminated or repaired by cause  Number of excavation damages  Number of excavation tickets  Total number of leaks eliminated or repaired by cause  Any additional measures the operator determines are necessary

DIMP - Beyond the Final Rule Hazardous Leak was defined:  Hazardous Leak means a leak that represents an existing or probable hazard to persons or property and requires immediate repair or continuous action until the conditions are no longer hazardous  Mirrors the definition of a hazardous (Grade1) leak contained in the GPTC guide  GPTC provides excellent guidance for classification of below ground leaks  No consistent definition or reporting criteria for above ground leaks

DIMP - Beyond the Final Rule What is a “Hazardous Aboveground Leak” ? AGA Proposed Definition- An unintentional escape of gas from above ground piping or related gas facilities that requires immediate make-safe action, because:  On outside piping, it:  Can be seen, heard or felt (e.g.-causes the blowing off of leak detection soap); and  Is in a location that may endanger the general public or property (e.g.-requires an immediate evacuation to protect public safety)

DIMP - Beyond the Final Rule What is a “Hazardous Aboveground Leak” ?  On inside piping, it:  Can be seen, heard or felt (e.g.-causes the blowing- off of leak detection soap); and  Is in a location that may endanger the general public or property (e.g.-requires an immediate evacuation to protect public safety) or it generates a reading of 20% LEL or more in the general atmosphere of the structure

DIMP - Beyond the Final Rule What is a “Reportable Aboveground Leak” ? An aboveground leak determined to be hazardous based on the criteria defined above is reportable  Minor escapes of gas (non-hazardous releases) at threads on sound piping or at fittings that are detectable only with instruments in direct proximity or that give only slight indications with leak detection soap need not be considered as leaks if they could be eliminated by lubrication, adjustment or tightening, even if the operator elects to reconstruct the piping or replace parts in order to eliminate the minor escape of gas

Effective Excavation Damage Prevention Program-  DIMP NOPR required enhancement of the excavation damage prevention program required under However, the DIMP Final Rule is silent on this issue  Don’t be complacent! You must be able to demonstrate you have an effective excavation damage prevention program  Why? Because excavation damage presents the greatest threat to distribution pipeline safety DIMP - Beyond the Final Rule

Excavation Damage Prevention Program Elements-  Damage Prevention Program  Public Awareness Program / RP 1162  Phase 1 Report / 2006 PIPES Act- Nine Elements. Ensure your state has a comprehensive program. Note: PHMSA ANPRM- state program effectiveness  DIMP Reporting Metrics for Excavation Damage- (Excavation Damages / Tickets)  Consider EDPG internal metrics to evaluate “root causes” of excavation damages DIMP - Beyond the Final Rule

PHMSA Revised Annual Report Form (F )  Revised to allow reporting of DIMP performance measures, number of EFVs installed on SFR services and mechanical fitting failure data  Submit all DIMP metrics on 2010 Annual Report (due March 15, 2011), except for mechanical fittings  Gather mechanical fitting failure data beginning on January 1, 2011 for reporting on 2011 Annual Report (due March 15, 2012) DIMP - Beyond the Final Rule

Compression Couplings vs. Mechanical Fittings-  Final Rule ( ) required reporting of “compression coupling failures” that result in hazardous (Grade 1) leaks, but DIMP Rule included a NOPR  Compression couplings essentially join pipe-to-pipe  PHMSA has determined that they want to gather “mechanical fitting failures” instead  Each (hazardous leak) failure requires a one page data submission in the Annual Report DIMP - Beyond the Final Rule

Mechanical fitting definition-  Includes stab, nut follower and bolt type mechanical fittings  Steel to steel, steel to plastic and plastic to plastic  Includes service or main tees, tapping tees, transition fittings, valves, end caps, etc  Essentially any fitting that is not welded or fused! DIMP - Beyond the Final Rule

Additional DIMP Guidance- Frequently Asked Questions (FAQs-8/3/10) and DIMP Webcast (soon!). Provide additional clarity about;  EFVs  GPTC Guidance  Farm taps  Leak management  Reporting of performance measures  Mechanical fitting failure reporting  Alternative inspection intervals DIMP - Beyond the Final Rule

DIMP Inspection Form and Pilot Audits-  PHMSA / NAPSR team has developed draft DIMP Inspection Form  “Pilot Audits” will be used to evaluate draft form  First audit- Virginia, September  Additional pilot audits in November & December  Revise draft Inspection Form prior to end of year  Three pilot audits in January and February  Finalize DIMP Inspection Form DIMP - Beyond the Final Rule

 Excess Flow Valve Rule (1998)- Required customer notification of availability of EFVs for all new or replaced single family residential services  DIMP Phase 1 Report-Four study groups concluded that EFVs can be a valuable risk mitigation tool, but should not be mandated  2006 PIPES Act-Congress mandated EFVs only for new and replaced single family residential services after June 1, 2008  DIMP Final Rule-Requires operators to identify threats, evaluate risks, and implement measures to address risks  GPTC DIMP Guidance suggests that operators consider the expanded use of EFVs as one possible additional / or accelerated action to address risk DIMP - Excess Flow Valve (EFV) Requirements

 Excess Flow Valve installation  (a) Definitions-  Replaced service line means a natural gas service line where the fitting that connects the service line to the main is replaced or the piping connected to this fitting is replaced  Service line serving single-family residence means a natural gas service line that begins at the fitting that connects the service line to the main and serves only one single-family residence DIMP - EFV Requirements

 Excess Flow Valve installation  (b) Installation Required. An excess flow valve (EFV) installation must comply with the performance standards in The operator must install an EFV on any new or replaced service line serving a single-family residence after February 2, 2010, unless one or more of the following conditions is present: DIMP - EFV Requirements

Excess Flow Valve Installation  (b) Installation Required. Exceptions: (1) The service line does not operate at a pressure of 10 psig or greater throughout the year (2) The operator has prior experience with contaminants in the gas stream that could interfere with the EFV’s operation or cause loss of service to a residence (3) An EFV could interfere with necessary O & M activities, such as blowing liquids from the line; or (4) An EFV meeting performance standards of is not commercially available to the operator DIMP - EFV Requirements

Excess Flow Valve Installation  (c) Reporting. Each operator must, on an annual basis, report the number of EFVs installed pursuant to this section as part of the annual report required by  Note: Part E of the new Annual Report Form requires reporting of the “Number of EFVs In System at End of Year on Single-family Residential Services”. DIMP - EFV Requirements

EFV Installation Location

SUMMARY-  Congress required installation of EFVs on SFR after June 1, 2008 in 2006 PIPES Act  Final DIMP Rule requires EFVs on all new and replaced service lines serving single-family residences after February 2, 2010  End of Story, Right? The story continues………. DIMP - EFV Requirements

 NTSB issued P-01-2 on June 22, 2001 in response to the South Riding, VA incident  PHMSA should “require that excess flow valves be installed in all new and renewed gas service lines, regardless of a customer’s classification, when the operating conditions are compatible with readily available valves”. NTSB Recommendation P-01-2

NTSB Safety Recommendations- The Pipeline and Hazardous Materials Safety Administration is required by law to respond to Safety Recommendations issued by the National Transportation Safety Board (NTSB), an independent federal agency charged by Congress with investigating significant hazardous materials accidents/incidents. NTSB Recommendation P-01-2

 Industry believed that the single-family residential EFV requirements in the 2006 PIPES Act and the mandated and risk-based use of EFVs under the DIMP Rule is consistent with NTSB recommendation P-01-2  However, in response to the NTSB recommendation, PHMSA formed a “Large EFV Team” to study the issue beginning June 23, 2009  NTSB reiterated P-01-2 for all classes of customers in a September 21, 2009 letter to PHMSA. Beyond DIMP - Large Volume EFV

PHMSA soliciting input from following stakeholders: PHMSA Large EFV Team Organizations Represented

Jan 2009 Incident Data

Summary of Industry Large Capacity EFV Issues  EFVs only work for significant service line breaks  Larger diameter service lines are less susceptible to a complete line break  EFVs can’t distinguish a major leak from a load  EFVs are not designed to protect from houseline failures  The operator does not know the life-cycle load ( years) at the time of service installation, making proper service line and EFV sizing impossible

Summary of Industry Large Capacity EFV Issues  Multi-family, commercial and industrial customers have far greater load variability, routinely adding equipment and associated loads without notifying the operator  Commercial establishments are subject to frequent changes of ownership, product, gas equipment and associated loads, making appropriate EFV sizing impossible

Summary of Industry Large Capacity EFV Issues  Multi-family, commercial and industrial customers expect a highly reliable gas supply. A false EFV closure puts the customer out of business, with associated business losses, until the EFV can be replaced  An inadvertent shutoff of commercial or industrial facilities, such as hospitals, manufacturing or chemical plants, could create a greater hazard than the gas leak it was intended to address  The cost to replace an incorrectly sized EFV may be $5,000-$50,000 IF the municipality allows the street to be cut

Industry Large Capacity EFV Recommendation EFVs on multi-family, commercial and industrial service lines should be considered by operators as a risk management tool and should not be mandated

Industry Large Capacity EFV Recommendation Continue the implementation of effective State excavation damage prevention programs, including the nine key elements as defined in the Pipeline Inspection, Protection, Enforcement and Safety Act of 2006

PHMSA Large EFV Project Summary / Timeline  Initial stakeholder meeting- June 23, 2009  Stakeholder net-meeting- August 25, 2009  Draft Technical Report-February 19, 2010  Final Technical Report completed- mid-2010  PHMSA Operator Survey- year end 2010  Economic (cost/ benefit) analysis- 2Q 2011  PHMSA / NAPSR respond to NTSB

PHMSA Large EFV Project Summary  Operators should continue to install EFVs on any new or replaced service line serving a single-family residence after June 1, 2008  PHMSA will conduct a large EFV operator survey and cost / benefit study by mid-2011, then respond to NTSB recommendation  EFVs have become a Re-authorization issue. NTSB Chair re-confirmed P-01-2 in testimony on June 24. In congressional hearings, AGA’s spokesman was asked to work with other parties to find a workable path forward. Anticipate EFV language in the 2010 Re-authorization

Low Stress Transmission Lines-  Stress level less than or equal to 30 % SMYS at MAOP  DIMP Phase 1 Report recommended that integrity of low-stress transmission lines be managed under DIMP since these lines behave more like high pressure distribution lines  AGA has drafted language for the 2010 Pipeline Safety Re-authorization that would allow operators to manage the integrity of low stress transmission lines under TIMP or DIMP DIMP - Beyond the Final Rule

In Summary-  The DIMP Final Rule only created a start point for your DIMP Program  There have been significant developments since the Final DIMP Rule was issued on December 4, 2009  In order to successfully comply with DIMP, you have to go “Beyond the Final Rule” DIMP - Beyond the Final Rule

Questions?