MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

Vacuum Vessel Production Readiness Review
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MuCool Test Area RF Workshop Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 15, 2010.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
1 Issues concerning the Design of the Tracker Solenoids Michael A. Green Lawrence Berkeley National Laboratory 17 August 2005.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL May 17, 2010.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Overview of the RFCC Module and 201-MHz Cavity Design
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
Presentation transcript:

MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 2 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE Coupling Coil Update – MICO Page 2 Allan DeMello- Lawrence Berkeley National Lab – January 23, 2013 Current Status of Coupling Coil Cold Mass By-pass of cooling pipe leak installed Pressure test of all cooling pipes complete Vacuum check of all cooling pipes complete Shipping to Fermilab today Cryostat Drawings are complete LBNL mechanical shop will fabricate the first cryostat Purchase order for stainless steel placed

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 3 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE Coupling Coil Update – MICO Page 3 Allan DeMello- Lawrence Berkeley National Lab – January 23, 2013 By-pass pipe Location of leak Original pipe By-pass pipe Helium reservoir Section view Section of pipe cut out Pipe capped

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 4 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE Coupling Coil Update – MICO Page 4 Allan DeMello- Lawrence Berkeley National Lab – January 23, 2013 By-pass pipe Fitting location for Fermilab magnet test is same as the original pipe Location of leak Original pipe By-pass pipe Section of pipe cut out Fermilab magnet test fitting

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 5 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE Coupling Coil Update – MICO Page 5 Allan DeMello- Lawrence Berkeley National Lab – January 23, 2013 By-pass Cooling Pipe Pressure Test By-pass Cooling Pipe Pressure Test The by-pass cooling pipe was hydrostatically tested, in steps, to a pressure of 300 psi No leaks detected Vacuum tight

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 6 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE Coupling Coil Update – MICO Page 6 Allan DeMello- Lawrence Berkeley National Lab – January 23, 2013 Pressure Test of Other Cooling Pipes Pressure Test of Other Cooling Pipes Other two cooling pipes were hydrostatically tested, in steps, to a pressure of 223 psi No leaks detected Vacuum tight Upper cooling pipe being testedLower cooling pipe being tested

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 7 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE Coupling Coil Update – MICO Page 7 Allan DeMello- Lawrence Berkeley National Lab – January 23, 2013 Coupling Coil Cold Mass Ready to Ship Coupling Coil Cold Mass Ready to Ship Coupling coil cold mass wrapped for shipping Coupling coil cold mass moved to crate Coupling coil cold mass in crate

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 8 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE Coupling Coil Update – MICO Page 8 Allan DeMello- Lawrence Berkeley National Lab – January 23, 2013 Coupling Coil Cryostat Single Cavity Vacuum Vessel Exploded View

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 9 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE Coupling Coil Update – MICO Page 9 Allan DeMello- Lawrence Berkeley National Lab – January 23, 2013 Coupling Coil Cryostat Cryostat design is complete Drawings complete LBNL mechanical shop will fabricate the first cryostat Purchase order for stainless steel placed Estimated to take 6 months to complete fabrication Drawings will be updated to reflect the “as built” cryostat