1 PFP Peer iCDR 2011 5/9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.

Slides:



Advertisements
Similar presentations
Variable Frequency Drives Bypass Options
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
THEMIS Instrument CDR 1 UCB, March 24-25, 2004 EFI AXIAL BOOMS (“AXB”) Critical Design Review Rob Duck Mechanical Engineering Department Space Sciences.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
CINEMA PDR- MEC 1 CINEMA Mechanical Subsystem PDR August 22, 2008 David Glaser/Paul Turin.
B. Donakowski UCB/SSLFIELDS iCDR – MEP Mechanical 1 SPP FIELDS MEP Main Electronics Package Mechanical Packaging Bill Donakowski
PEEM III Endstation Design Review
1 MAVEN PFP SWIA Electrical Pre-CDR Peer Review MAVEN SWIA Electrical Pre-CDR Peer Review May 11, 2011 E. Taylor Space Science Laboratory University of.
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
MUX Control Systems. 2 Multiplex Control System 3 MUX System - Key Features Designed and tested for continuous operation in 10,000 feet of water Designed.
MAVEN PFP Mechanical Peer Review SEP (Solar Energetic Particles) Instrument May 10, 2010 David Glaser Davin Larson Robert Lillis Paul Turin David Curtis.
3-4 Sept. 2008EFW INST+SOC PDR141 Electric Field and Waves (EFW) Spin Plane Boom (SPB) Gregory Dalton Space Sciences Laboratory University of California.
THEMIS MISSION PDRESA- 1 UCB, November, 2003 ESA Plasma Instrument Mission PDR Dr. C. W. Carlson and Themis ESA Team UC Berkeley SSL.
C osmic R Ay T elescope for the E ffects of R adiation Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
Overview of STIS Repair Plans Charles R. Proffitt November 16, 2006.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Presenter1 Thermal Control R.Eby Impact Boom Stowed and Deployed SWEA STE Magnetometer Bob.
1 Structure (STR) Subsystem Overview Jonah White – STR Co-Lead.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
Spacecraft Interface/Handling Ring Robert Besuner 12 August 2004.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
C osmic R Ay T elescope for the E ffects of R adiation Mechanical Design CRaTER and the Electronics Assembly Matthew Smith Mechanical Engineer (617)
1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
Main Electronics Package
THEMIS MISSION PDRMAG BOOM- 1 UCB, November, 2003 Magnetometer Booms (MAGS) Mission Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
THEMIS Instrument PDR Bill Donakowski/ EFI Radial Boom 1 UCB, October 15-16, 2003 EFI Radial Boom EFI Radial Boom Mechanical (SPB Spin Plane Boom) Bill.
1 PFP MSR, 02/17/2010 Particles and Fields Package Monthly Status Review (MSR) February 17, 2010 Dave Curtis, PFP PM.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Mechanical Systems David Glaser Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
1 PFP MSR, 2/14/2011 Particles and Fields Package Monthly Status Review (MSR) February 14, 2011 Dave Curtis, PFP PM.
1 SPP FIELDS MEP Main Electronics Package Peer Review Bill Donakowski UCB/SSL 18 NOV 2014 MAVEN PFDPU Flight Unit SPP MEP Baseline.
THEMIS Instrument PDRMag Booms- 1 UCB, October 15-16, 2003 Magnetometer Booms (MAGS) Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
1 PFP Peer iCDR 2011/5/11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review STATIC Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
15-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , SWIA (Solar Wind Ion Analyzer) J.S. Halekas.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
1 PFP Team Meeting Particles and Fields Package Weekly Team Meeting, SSL April Dave Curtis, PFP PM.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
Educational Services 1 LNN Family Split Case Pumps.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
C osmic R Ay T elescope for the E ffects of R adiation CDR v1 Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Telescope - Mechanical
ESA Plasma Analyzer Instrument
University of California - Berkeley
Bill Donakowski Mechanical Engineer UCB/SSL
SWIA Front End Peer Review
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Hawkeye Mechanical Design Snapshot
Matthew Smith (617) June 27, 2006 Mechanical Design, CRaTER Assembly and Electronics Assembly Critical Design Review Matthew.
MIPA status report (Miniature Ion Precipitation Analyzer)
Matthew Smith Mechanical Engineer (617)
Systems Engineering Bob Goeke.
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Cryomodule Assembly Plan
Presentation transcript:

1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL

2 PFP Peer iCDR /9-11 SWIA Mechanical Overview Assemblies and Features Materials Analyzer Construction Cover Release Mechanism Attenuator Construction MCP Construction MOBI Motor Assembly Purge Construction Electronics Board Stackup Electronics Box Construction Mounting and Interconnects Analysis Outstanding Issues, ETU testing

3 PFP Peer iCDR /9-11 SWIA Status Drawings – 100% complete Fabrication – many parts complete, quotes out, parts in shop All PDR FRA’s addressed Testing – anode assembles, placed in calibration chamber

4 PFP Peer iCDR /9-11 SWIA Assemblies and Features Analyzer Anode Electronics Attenuator/ Cover Release PFDPU/S-C Connectors Mounting Feet

5 PFP Peer iCDR /9-11 SWIA Materials and Construction Standard UCB Construction: Machined/Etched Parts –6061-T6 Aluminum –2024-T8 Aluminum –544 Bronze –303 Stainless Steel –Delrin AF, PEEK 450G, Vespel SP-1/3 –BeCu springs Finshes –Alodine –Anodized –Gold Plating –Ebonol C, Black Chrome, DAG-213, Black Electroless Nickel with Teflon Thermal Treatments Blankets (LM supplied) Thermal Taping (LM supplied) Long lead Items MCP Carbon Foils/Carriers TiNi P5 Pin Pullers

6 PFP Peer iCDR /9-11 SWIA Analyzer Construction Outer Grids Cover Release/ Attenuator Top Deflector Mount Top Deflector Spider Plate Hemisphere Mount Inner Hemisphere Outer Hemisphere Bottom Deflector Mount Bottom Deflector Aperture Ring Cover in Closed Position Attenuator (down)

7 PFP Peer iCDR /9-11 Cover Release Mechanism Cover Closed Cover Open TiNi P5 Pin Puller Inner Slide Spring Plunger Burp Spring Retraction Spring Attenuator Latch Cover Seal Burp Spring: designed to relieve N2 at 5psi. Holds cover closed during vibration Safety Switch

8 PFP Peer iCDR /9-11 Attenuator Cover Closed Cover Open, Attenuator Down Cover Open Switch Cover Open, Attenuator Up Cover Stroke: 0.220” Aperture stroke: 0.225”

9 PFP Peer iCDR /9-11 Attenuator Attenuator Slide Assembly SMA Spring Block Switch Assembly Attenuator Down Attenuator Up Attenuator Design: 2.17 N per SMA wire, redundant wires in both directions 30g moving mass 0.51 N switch spring force in detent to actuate attenuator (to hold in 1G environment) 10x SMA force design margin 25% SMA wire over travel SMA Routing

10 PFP Peer iCDR /9-11 SWIA MCP Construction Transition Plate MCP Spacers MCPs MCP Rings Spring Plates Spring Rings Grid Spacers MCP Grid Spring Clamps Anode MCP Supply Voltage Pin

11 PFP Peer iCDR /9-11 SWIA Purge Construction 1/8” NPT Cole Palmer compression fitting and right angle purge block. N2N2 5psi N 2 purge pressure Viton O-Ring

12 PFP Peer iCDR /9-11 SWIA Electronics Board Stackup LVPS Digital Deflector/ Sweep HV Supply Preamplifier/ MCP HV Supply Anode MCP Protective Cover Standoffs between boards and shields

13 PFP Peer iCDR /9-11 SWIA Electronics Box Connections Boards rigidly mounted to this panel Digital pigtails to MDM on Preamplifier Preamplifier Hypertronics KA-17 to Anode Lower Deflector HV HV Enable on Pigtail LVPS to PFDPU Digital to PFDPU HV to Deflectors MCP HV Supply

14 PFP Peer iCDR /9-11 SWIA Mounting, Harness, and Purge N 2 Purge Connection Harness Connectors

15 PFP Peer iCDR /9-11 SWIA Frequency Analysis 243 Hz first mode of Upper Analyzer 14% mass participation

16 PFP Peer iCDR /9-11 SWIA Stress Analysis 101G static loading

17 PFP Peer iCDR /9-11 Cover Deflection and Load Burp Spring Plunger Cover Clamp Radially constrained, 0.010” gap

18 PFP Peer iCDR /9-11 SWIA Mass Budget Electrostatic Analyzer Assembly Anode Assembly Electronics (Including Boards) Mechanical Misc. (Housing, Fasteners) CBE SWIA Instrument Mass Allocation from MAVEN_PF_SYS_002K Resources MARGIN30%20% CBE mass based on a combination of: Solid model with realistic mass properties Measured SWIA prototype board mass Measured mass of heritage parts and boards

19 PFP Peer iCDR /9-11 Future Plan Attenuator Life Test – End of June Concurrent assembly of detector for Calibration Chamber Testing – End of June N2 Purge Test Exercise Manipulator Vibration test for final frame design and structural verification with electronic mass dummies – Mid July ETU Testing Beyond ETU Flight fabrication in August Black Nickel coating vendor Issues