1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL
2 PFP Peer iCDR /9-11 SWIA Mechanical Overview Assemblies and Features Materials Analyzer Construction Cover Release Mechanism Attenuator Construction MCP Construction MOBI Motor Assembly Purge Construction Electronics Board Stackup Electronics Box Construction Mounting and Interconnects Analysis Outstanding Issues, ETU testing
3 PFP Peer iCDR /9-11 SWIA Status Drawings – 100% complete Fabrication – many parts complete, quotes out, parts in shop All PDR FRA’s addressed Testing – anode assembles, placed in calibration chamber
4 PFP Peer iCDR /9-11 SWIA Assemblies and Features Analyzer Anode Electronics Attenuator/ Cover Release PFDPU/S-C Connectors Mounting Feet
5 PFP Peer iCDR /9-11 SWIA Materials and Construction Standard UCB Construction: Machined/Etched Parts –6061-T6 Aluminum –2024-T8 Aluminum –544 Bronze –303 Stainless Steel –Delrin AF, PEEK 450G, Vespel SP-1/3 –BeCu springs Finshes –Alodine –Anodized –Gold Plating –Ebonol C, Black Chrome, DAG-213, Black Electroless Nickel with Teflon Thermal Treatments Blankets (LM supplied) Thermal Taping (LM supplied) Long lead Items MCP Carbon Foils/Carriers TiNi P5 Pin Pullers
6 PFP Peer iCDR /9-11 SWIA Analyzer Construction Outer Grids Cover Release/ Attenuator Top Deflector Mount Top Deflector Spider Plate Hemisphere Mount Inner Hemisphere Outer Hemisphere Bottom Deflector Mount Bottom Deflector Aperture Ring Cover in Closed Position Attenuator (down)
7 PFP Peer iCDR /9-11 Cover Release Mechanism Cover Closed Cover Open TiNi P5 Pin Puller Inner Slide Spring Plunger Burp Spring Retraction Spring Attenuator Latch Cover Seal Burp Spring: designed to relieve N2 at 5psi. Holds cover closed during vibration Safety Switch
8 PFP Peer iCDR /9-11 Attenuator Cover Closed Cover Open, Attenuator Down Cover Open Switch Cover Open, Attenuator Up Cover Stroke: 0.220” Aperture stroke: 0.225”
9 PFP Peer iCDR /9-11 Attenuator Attenuator Slide Assembly SMA Spring Block Switch Assembly Attenuator Down Attenuator Up Attenuator Design: 2.17 N per SMA wire, redundant wires in both directions 30g moving mass 0.51 N switch spring force in detent to actuate attenuator (to hold in 1G environment) 10x SMA force design margin 25% SMA wire over travel SMA Routing
10 PFP Peer iCDR /9-11 SWIA MCP Construction Transition Plate MCP Spacers MCPs MCP Rings Spring Plates Spring Rings Grid Spacers MCP Grid Spring Clamps Anode MCP Supply Voltage Pin
11 PFP Peer iCDR /9-11 SWIA Purge Construction 1/8” NPT Cole Palmer compression fitting and right angle purge block. N2N2 5psi N 2 purge pressure Viton O-Ring
12 PFP Peer iCDR /9-11 SWIA Electronics Board Stackup LVPS Digital Deflector/ Sweep HV Supply Preamplifier/ MCP HV Supply Anode MCP Protective Cover Standoffs between boards and shields
13 PFP Peer iCDR /9-11 SWIA Electronics Box Connections Boards rigidly mounted to this panel Digital pigtails to MDM on Preamplifier Preamplifier Hypertronics KA-17 to Anode Lower Deflector HV HV Enable on Pigtail LVPS to PFDPU Digital to PFDPU HV to Deflectors MCP HV Supply
14 PFP Peer iCDR /9-11 SWIA Mounting, Harness, and Purge N 2 Purge Connection Harness Connectors
15 PFP Peer iCDR /9-11 SWIA Frequency Analysis 243 Hz first mode of Upper Analyzer 14% mass participation
16 PFP Peer iCDR /9-11 SWIA Stress Analysis 101G static loading
17 PFP Peer iCDR /9-11 Cover Deflection and Load Burp Spring Plunger Cover Clamp Radially constrained, 0.010” gap
18 PFP Peer iCDR /9-11 SWIA Mass Budget Electrostatic Analyzer Assembly Anode Assembly Electronics (Including Boards) Mechanical Misc. (Housing, Fasteners) CBE SWIA Instrument Mass Allocation from MAVEN_PF_SYS_002K Resources MARGIN30%20% CBE mass based on a combination of: Solid model with realistic mass properties Measured SWIA prototype board mass Measured mass of heritage parts and boards
19 PFP Peer iCDR /9-11 Future Plan Attenuator Life Test – End of June Concurrent assembly of detector for Calibration Chamber Testing – End of June N2 Purge Test Exercise Manipulator Vibration test for final frame design and structural verification with electronic mass dummies – Mid July ETU Testing Beyond ETU Flight fabrication in August Black Nickel coating vendor Issues