1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.

Slides:



Advertisements
Similar presentations
Planning, Budgeting, Acquisition & Management of Capital Assets Capital programming is an integrated process within an agency for planning, budgeting,
Advertisements

County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Overview What is the National ITS Architecture? User Services
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Mobility and Safety Product Team (Work Zones). Integrated Product Teams “Integrated Product Teams (IPT’s) are chartered by agency leadership to address.
Wade E. Kline, AICP Community Development Planner.
NCHRP 07-21: Asset Management Guidance for Traffic Control Devices, Barriers, and Lighting 2014 ATSIP Annual Meeting Presented by Nancy Lefler Vanasse.
1 Executive Office of Public Safety. 2 National Incident Management System.
Project Process Discussion Adam D. Martinez Mgr, Market Ops Divisional Projects Organization ERCOT RMS Meeting May 10, 2006.
Chapter 3: The Project Management Process Groups
Green Light-Go Program Pennsylvania’s Municipal Signal Partnership Program April 7, 2015 Daniel Farley Chief, Traffic Signal and Arterial Management Section.
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Trns*port Data Model Unification Joe Pugh Virginia Department of Transportation Peggy Leight Info Tech Inc 11/06/05.
Project Management Process Overview
FHWA Next Generation Simulation (NGSIM) Program 2007 TRB Planning Applications Conference Daytona, FL May 7, 2007 James Colyar, P.E. Highway Research Engineer.
IT Project Management Cheng Li, Ph.D. August 2003.
Update on MOITS Strategic Plan Development Andrew J. Meese, AICP COG/TPB Staff MOITS Technical Subcommittee September 9, 2008 Item # 5.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
Coordinating the IT in ITS Galen McGill, PE ITS Manager August 18, 2009.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
INDOT Access Management Study _________________________ Long Range Transportation Planning Section Division of Environment, Planning and Engineering INDIANA.
1 Maryland Transportation Operations Summit Regional Coordination & Communication Richard W Steeg, PE Regional Operations Director Northern Region May.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
Talking Technology & Transportation (T3) Webinar July 25, 2007.
Implementation Overview SHRP 2 Oversight Committee June 18, 2012.
ExOB Discussions on Development Test Center WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006.
Jean Wallace January 15, SP&R Part II Funding Distribution – FY2014.
1 Operations Academy Senior Management Program Next Offering September 16-26, 2008.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Traffic Management Transit Management Emergency Management Fixed Point-to-Fixed Point Communications Roadway Toll Administration Remote Traveler Support.
Guidance and Support of ITS Programs Michael Freitas May 2000 US Department of Transportation Federal Highway Administration.
Handbook for Developing a Transportation Management Center Operations Manual Sponsored by the TMC Pooled-Fund Study Single.
ConSysTec 3 rd Israel ITS AnnualMeeting Israel ITS Architecture Development Rob Jaffe, Ph.D. President, ConSysTec Shenorock, NY USA.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
MIT - October 1, 2004Jeffrey D. Ensor 1 RSTP Planning for Operations Jeffrey D. Ensor Malaysia Transport Group M.I.T. October 1, 2004.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
1 Course of Action For Strengthening Transportation Communications and Coordination In the National Capital Region Presented by John M. Contestabile Maryland.
Regional Concept of Transportation Operations: The Hampton Roads Experience Presented by: Camelia Ravanbakht, PhD Talking Technology & Transportation (T3)
Approaches for Integrating Systems Engineering into Your Agency's Business Practices. Talking Technology and Transportation (T3) Webinar August 2, 2007.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Implementation: Results from the Using Your Regional ITS Architecture Peer Exchange Network Workshop Mac Lister FHWA Resource Center ITS America Annual.
Connected Vehicles Workforce FHWA Vehicle-to-Infrastructure
Systems Engineering “Understanding Where it Fits in Your Agency” a session in fhwa’s Systems Engineering t3 series aug. 02, 2007.
NASA ARAC Meeting Update on Next Generation Air Transportation System May 3, 2005 Robert Pearce Deputy Director, Joint Planning & Development Office.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
Camden County Travel Management Coordination Center Project Update Camden County WIB Board Meeting – March 26, 2008.
NTOC National Summit November 7, 2011 Washington, DC Aliyah Horton Douglas E. Noble, P.E., PTOE Aliyah Horton Douglas E. Noble, P.E., PTOE Operations:
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
Improving Communication and Coordination in Highway Work Zones Kimberly Peters Incident Management Program Director, INDOT Event Date.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
NATIONAL INCIDENT MANAGEMENT SYSTEM Department of Homeland Security Executive Office of Public Safety.
Washington State Work Zone Rule  Work Zone Rule Implementation  New Work Zone Policy Cathy Nicholas, FHWA - WA Division Office Frank Newboles, WSDOT.
Federal Regional ITS Architecture Requirements 1 T3 Session Federal Requirements for Regional ITS Architectures.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Melissa Lance Operations Systems Manager July 16, 2015 Connected Vehicle Update National and Virginia Perspective.
1 Federal Emergency Management Agency Charlie Hoffman Disaster Operations Directorate Chief, DEC Programs Disaster Emergency Communications National Public.
VDOT’s Operations Program Update and Opportunities June 6, 2014 Dean Gustafson, P.E., PTOE State Operations Engineer Operations Division.
VDOT’s Operations Program Update and Opportunities July 17, 2015 Dean Gustafson, P.E., PTOE State Operations Engineer Operations Division.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
VDOT’s Operations Program Opportunities May 20, 2016
Project Overview – Phase 1
Implementation Strategy July 2002
By Jeff Burklo, Director
Presentation transcript:

1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology and Transportation (T3) Webinar 1

2 System Operations in VDOT Program established in 2004 Mission … “Actively manage the transportation system to maximize safety, security, mobility …” 2

3 Northern Region Operations (NRO) 3 VDOT Operations Regions

4 VDOT NRO Org Chart Admin. Business Plan Performance Mgmt Contract Admin. 604 Budgeting Back Office Oversight OPP Strategic Planning Architecture/Rule 940 Ops Project Planning Regional Coord Annual Invest. Plan Dev, Initiation, and Management Project programming Earmark Project Coord Year-End Report Outreach Northern Region Operations Director ATMS Replacement Project Manager Executive Assistant Ops Administration Ops Planning & Programming System Engr. Traffic Engr. Traffic Ops – Smart Traffic Center & ITS – Info. Tech. Maintenance Ops Inspection & Construction SE Ops Engineering Analysis Ops Project Development Review all Roadway Project ITS and Telecomm Design TE Project Programming Customer Service Study Assessment Safety/Operational Review & Proj Support Plan Dev, Coord, Review Signal Engr Coord Constructability Review Data Collection Strategic Improvement / Corridor Study Operations Enhancement TO – STC & ITS-IT Emergency Coord Incident Mgmt Traffic Mgmt Traveler Info Work Zone Mgmt Freeway & Arterial Operations Signal Operations Roadway Flow Assessment IT / Network Support to Operations System Maintenance Sign Maintenance Pavement Marking Maintenance Lighting Maintenance Signal Maintenance ITS Asset Maintenance Telecomm Maintenance OIC Install and Construct ITS Devices, Signals, Telecomm, and Highway Lighting Constructability & Maintainability Review

5 VDOT NRO has become a “strategic” organization through: Integrating the Planning and Programming processes. Mapping organizational structure to the Systems Engineering Process. Providing tools for Project Managers to navigate the integrated process. Incorporating Operations Planning into traditional roadway project development from the outset. This approach can work for your organization, too! VDOT NRO: Strategically Driven, Operationally Led 5

6 Origin of VDOT NRO ITS Projects 1.Developed by VDOT NRO 2.Roadway Construction Projects 3.Local ITS Projects 4.Partnership Projects 5.Metropolitan Washington D.C. Regional Projects 6.Statewide Projects 7.CMP-Induced Projects 8.NVTA-Generated Projects

7 NRO’s Planning/Programming Process Ensures Consistency and Traceability

8 Systems Engineering V Diagram as Applied to Operations Projects

9 VDOT NRO Organization is Mapped to V Diagram

10 VDOT NRO Business Process is Mapped to V Diagram

11 Web site: ww.vdot-itsarch.com/ww.vdot-itsarch.com/ Strategic Plan & Operating Concept FY Strategic Focus Incident Mgmt Plan Emergency Transp. Plan Telecomm. Plan Configuration Change Boards Tools Available: Consistent Document and Tools Facilitate the Process for NRO Managers Relationship to the Business Process: 1. Strategic Plan Operating Concept Regional Architecture 2. Establish Annual Strategic Focus 10. Maintain / Update / Develop System Documents, Processes & Reports (i.e., System Architecture, ConOps, Year End Reports, etc.)

12 VDOT NRO Business Process is Mapped to V Diagram

13 Project Proposal Template Technology Evaluation Process SE Source for ITS Tech. System (SESITS library) Prioritization Model Relationship to the Business Process: Consistent Document and Tools Facilitate the Process for NRO Section Managers 3. Project Development (concept exploration and Feasibility review) 4. Project Prioritization Tools Available:

14 VDOT NRO Business Process is Mapped to V Diagram

15 Project & Rule 940 User Guide Rule 940 Checklist Concept of Operations Outline Standard Operating Procedure Project Mgmt Forum & Planning Advancement Board Consistent Document and Tools Facilitate the Process for NRO Section Managers Relationship to the P&P Process: 9. Project Implementation Tools Available:

16 Other Tools for Managing NRO Budget and Projects Current practice: Spreadsheets Funding Plan – NRO activities and their funding & source Work Plan – NRO activities with basic project info, funding and spending, agency approval requirement status, etc. Unfunded List – Partially and unfunded NRO activities as candidate for receiving funds during fiscal year or being considered at the next fiscal year investment dev. process Funding Reallocation – proposed and approved funding re-allocation during fiscal year And many other agency process tracking spreadsheets Upcoming New Practice: Database and web tool Project database and intranet web-based interface No more separate spreadsheets VDOT official construction project management web-based tool NRO projects funded by the construction fund can benefit from using VDOT’s enterprise tool

17 VDOT Rule 940 Checklist Ensures and Documents That the Process Has Been Followed Section 1: Project Introduction Section 2: Needs Assessment Section 3: Regional Architecture Assessment and Concept Exploration Section 4: Alternative Analysis Section 5: Concept of Operations Section 6: Requirements Definition Section 7: Detailed Design Section 8: Implementation Section 9: Integration and Test Section 10: System Verification and Acceptance Section 11: Operations and Maintenance

18 VDOT Rule 940 Checklist Ensures and Documents That the Process Has Been Followed Section 1: Project Introduction Section 2: Needs Assessment Section 3: Regional Architecture Assessment and Concept Exploration Section 4: Alternative Analysis Section 5: Concept of Operations Section 6: Requirements Definition Section 7: Detailed Design Section 8: Implementation Section 9: Integration and Test Section 10: System Verification and Acceptance Section 11: Operations and Maintenance

19 VDOT Rule 940 Checklist Ensures and Documents That the Process Has Been Followed

20 Origin of VDOT NRO ITS Projects 1.Developed by VDOT NRO 2.Roadway Construction Projects 3.Local ITS Projects 4.Partnership Projects 5.Metropolitan Washington, DC Regional Projects 6.Statewide Projects 7.CMP-Induced Projects 8.NVTA-Generated Projects

21 Operations SE Process “Shoehorned” into Traditional Roadway Project Development Assess need for and feasibility of Operations elements (ITS Market Packages) in initial project planning (PE Phase). Assess funding need based upon Step 1 and include Statewide Transportation Plan (SYIP in Virginia). For projects included in Statewide Plan, conduct more detailed analysis and feasibility study to determine specific Operations applications. (In Virginia, pre-Scoping with Location & Design during PE Phase.) For projects in Scoping phase, include requirement for consultant to develop Concept of Operations based upon Steps 1-3 as part of bid package. Upon project design award, design of Operations elements enters V Diagram process described previously. It is important to consider both temporary Operations elements during construction phase and permanent elements for Management & Operations phase. 20

22 ITS Concept Exploration – OPP & Feasibility Evaluation – SE Concept of Operations - OPP Require-ments – SE ITS High-level Design – SE ITS Detail Design – SE 21

23 Origin of VDOT NRO ITS Projects 1.Developed by VDOT NRO 2.Roadway Construction Projects 3.Local ITS Projects 4.Partnership Projects 5.Metropolitan Washington, DC Regional Projects 6.Statewide Projects 7.CMP-Induced Projects 8.NVTA Generated Projects NRO starts participating from the concept exploration and/or Concept of Operation development phases.

24 IN CONCLUSION  Integrated strategic planning, budgeting, progressing, and tracking of Operations projects adds efficiency and effectiveness to an agency’s Operations practice.  Integrating the Planning and Programming processes, and mapping organizational structure to the Systems Engineering process, have been keys for VDOT NRO in becoming a “strategic” organization.  Clear, simple tools can help Project Managers to navigate the integrated process.  Planning for Operations needs to extend beyond the Operations business units and be incorporated into traditional roadway project development from the outset. 23

25 Contact Information Amy Tang McElwain VDOT Northern Region Operations Planning and Programming Manager 24