Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Gate 1 Input Criteria Objectives of Top Leadership Teams/CDR’s Intent Completed CBA Completed Service review of ICD Identification of mutually shared needs.
Presented By: Thelma Ameyaw Security Management TEL2813 4/18/2008Thelma Ameyaw TEL2813.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Office of Information Technology (OIT) PROJECT INITIATION DOCUMENTS - BUSINESS CASE, ALTERNATIVE ANALYSIS AND STATEMENT OF WORK (SOW)
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
Lecture for Senior Design Classes By Dr. Pam Estes Brewer Associate Professor, TCO Mercer University School of Engineering Brewer (Adapted from presentation.
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
UNCLASSIFIED CJCSI Revision Update CAPT Jeff Gernand, J-8 12 November 2002.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Brian Lihani Deputy Chief, Aerospace Warning Branch HQ NORAD/J35W 11 May 2011 Analysis of Alternatives (AoA) This Briefing is Classified UNCLASSIFIED.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
Lecture 2.1b: DoD Acquisition Process (SEF Ch 2)
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Materiel Development Decision (MDD) Information Requirements
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Business, Cost Estimating & Financial Management Considerations
Principal Investigator ESTCP Selection Meeting
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
This template is for guidance
Competitive Prototyping – the New Reality
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Principal Investigator ESTCP Selection Meeting
Milestone A to Milestone B Requirements Management Activities
JTAMS MILESTONE A ANALYSIS
Identify the Risk of Not Doing BA
New Space Systems Acquisition Policy
ISA 201 Intermediate Information Systems Acquisition
Test and Evaluation Considerations
Rank, Name Office Symbol Date
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Phase 2 Tollgate Review Discussion Template
Phase 3 Tollgate Review Discussion Template
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
Phase 3 Tollgate Review Discussion Template
Phase 2 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
Phase 3 Tollgate Review Discussion Template
Phase 2 Tollgate Review Discussion Template
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Principal Investigator ESTCP Selection Meeting
Rank, Name Office Symbol Date of Briefing
The Department of Defense Acquisition Process
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each page for additional guidance Updated August 2015 This template is for guidance and is not mandatory CLASSIFICATION/FOR OFFICIAL USE ONLY/Pre-Decisional/AFRB (or DAB) Support

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 2 BLUF – purpose of mtg (requested decision) Requirements SPONSOR Development Planning ACQ. TEAM (CONCEPT DEVELOPER LEAD) AoA Study Guidance and Plans SPONSOR Funding & Staffing for SPONSOR Materiel Solutions Analysis Phase Affordability Constraints SPONSOR Acquisition Recommendations ACQUISITION Requested Decision ACQUISITION / SPONSOR MDD Overview

I n t e g r i t y - S e r v i c e - E x c e l l e n c e BLUF Meet the requirements of an MDD Establish ACAT level Establish lead service/organization Establish acquisition life cycle entry point Decision(s) sought Proceed with OSD engagements to prepare for MDD Approve entry into requested phase Major issues (if any) 3

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Requirements CONOPS 4

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 5 Requirements ICD (Capability Need), Operational Risk

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 6 Requirements Non-Materiel Approaches

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 7 Requirements Timeliness to Need

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Summarize how well approaches that were considered adequate address the capability gaps considering JROC approved attributes and measures of effectiveness for each approach Identify known threats that mitigate materiel approaches Describe or illustrate the best materiel and non-materiel approaches based upon: total ownership cost, efficacy, performance, technology maturity, supportability / sustainment, & risk Include “no cost” approach 3 to 5 Joint system concepts (and alternative variations), that could satisfy the mission, military problem, mission tasks, operational risks and capability gaps considered in the CBA, not already addressed by currently programmed force or non-materiel solutions Prioritized list of materiel approaches: Describe the non-materiel approach(es) recommended for AF or Joint DOTMLPF Change Recommendation (DCR) Describe the materiel approach(es) recommended for further analysis (AoA) Suggested Materiel Solution Approaches for AoA Consideration 8

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Concept Summary (one per CCTD*) be prepared to talk to Notes in detail 9 Evaluations – Identify evaluations performed and results that support this concept - Parametric studies - M&S - Prototyping (performed and planned) - Analyses - Conclusions from all evaluations Description: Describe this concept and how it fits into the architecture Risk Assessment: (high, medium, low): - Operational: - Program (cost, schedule, performance): - Technology: - Intelligence: -Overall Risk Assessment: Program characterization - Cost and schedule -Design characteristics -Critical Technology Elements and maturity - Test and Evaluation - Operating Concept and DOT_LPF Implications - Supportability

I n t e g r i t y - S e r v i c e - E x c e l l e n c e AoA Summary Introduction: Background, Purpose, Scope Ground Rules: Scenarios, Threats, Environment, Constraints and Assumptions Alternatives: Description of Alternatives, Nonviable Alternatives, Operations Concepts, Support Concepts Determination of Effectiveness Measures: Mission Tasks, Measures of Effectiveness, Measures of Performance Effectiveness Analysis: Effectiveness Methodology, Models, Simulations, and Data, Effectiveness Sensitivity Analysis Cost Analysis: Life Cycle Cost Methodology, Models and Data, Cost Sensitivity and/or Risk Analysis Cost-Effectiveness Comparisons: Cost-Effectiveness Methodology, Displays or Presentation Formats, Criteria for Screening Alternatives Organization and Management: Study Team/Organization, AoA Review Process, Schedule 10 Focus is on Alternatives and AoA Org/Mgmt

I n t e g r i t y - S e r v i c e - E x c e l l e n c e AoA Alternatives Descriptions Alternative 1: Develop Cutting Edge Tech Solution.. Summarize Concept Characterization and Technical Description (CCTD) Alternative 2: Modify/Upgrade the ABC Program with new capability.. Summarize CCTD. Alternative 3: Acquire COTS Product(s) and Integrate.. Summarize CCTD 11

I n t e g r i t y - S e r v i c e - E x c e l l e n c e AoA Technical Synopsis 12 Senior Steering Group (SSG) Office of Aerospace Studies (OAS) Working Level Integrated Process Team (WIPT) Study Director: > > Employment Concepts Working Group (ECWG) Lead: > > Cost Analysis Working Group (CAWG) Lead: > > Technology & Alternatives Working Group (TAWG) Lead: > > Effectiveness Analysis Working Group (EAWG) Lead: > > Identify other Service/Agency/partner participation in Working Groups Describe models that will be used Highlight alignment with Joint planning scenarios Use either schedule format

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Preliminary AoA Schedule 13 NOTE: AFROC- and CAPE-approved AoA Study Plan is now expected at MDD Use either schedule format

I n t e g r i t y - S e r v i c e - E x c e l l e n c e SAMPLE APT Framing Assumption #1 Expectations Implications Framing Assumption Purpose-built will be competitive with existing designs Basic aircraft and training system designs will be complete through vendor-conducted CDRs Enter at MS B Limited EMD of “deltas” to meet spec PDR and competitive prototype waivers applicable* Best-value source selection must consider risk Contractor flight data to validate performance Single step to full capability Single award for EMD, Prod and ICS RAA in 2023 FOC in 2031 I n t e g r i t y - S e r v i c e - E x c e l l e n c e 14 *Air Force will still conduct comprehensive PDR and Critical Design Review (CDR) events post-contract award in support of Better Buying Power (BBP) 3.0 “Strengthen organic engineering capabilities” and SAF/AQ’s OTB Initiative. “PRE-DECISIONAL – NOT FOR RELEASE”

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Sample APT Framing Assumption #2 Expectations Implications Framing Assumption APT requirements only Mature technologies and systems available Single step, limited EMD, waivers etc. AETC sole customer Separate PPBE process for other T-38 owners Separate Planning Programming Budgeting and Execution (PPBE) process for APT derivative use capabilities IOC 2023 I n t e g r i t y - S e r v i c e - E x c e l l e n c e 15 “PRE-DECISIONAL – NOT FOR RELEASE”

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Alt Sample Framing Assumptions Assumption*Implications**Expectations***Metric**** Design is Mature Production concurrency possible Schedule to IOC will be achieved Schedule growth below historical median Threat levels will not change much in the next 5 years Capability changes unlikely Costs to Commercial demand will reduce unit cost Production cost Est is realistic No additional funding needed nor cost growth 16 See Notes pages for information

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Resources for MSA 17

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Affordability 18

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Acquisition Recommendations Recommend lead service Recommend lead Center (PEO) Recommend acq life cycle entry point for the program Include entrance criteria for next proposed milestone Statutory requirements Regulatory requirements Program unique requirements Technology maturity Risk summary (technical, cost, schedule) Demonstrate that program has met the intent of any milestone(s) to be skipped Show plan for compliance with statutory and regulatory requirements Identify phase(s) for future increment(s) 19

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Proposed ADM Language (select as appropriate for effort at hand) Program has met Entrance Criteria for MDD: JROC validated the xxx ICD on dd/mm/yyyy AoA Study Guidance / Plan approved by DCAPE Designate USAF as Lead Component Designate program as an ACAT IC USAF shall prepare to return for a DAB IPR, target 1Q/FYxx Authorize entry into the Technology Development phase, MS B target 2Q/FYyy Prior to DAB IPR, USAF shall: Prepare a prototyping strategy that enables competitive prototyping Propose adopting a single-step-to-full-capability strategy Prepare preliminary Systems Engineering Plan (SEP) Prepare preliminary Test and Evaluation Strategy (TES) Submit cost estimate for recommended alternative(s) and provide the supporting full-funding profile for Technology Development 20

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Summary; Requested Decision  JROC- validated requirements  AoA funding committed  Lead Service/Component (or Center/PEO) and AoA Study Team Leads established  Screening process will provide a final set of alternatives for AoA FOR AFRB  Recommend concurrence with concepts for inclusion in AoA  Approve continued engagement with OSD toward MDD DAB FOR MDD  Recommend entry into xxx phase  Authorize Analysis of Alternatives execution 21

MDD – Status of Required Core Documents 22 REQUIREMENTORIGINATOROSD OPR APPROVAL AUTHORITY STATUS/COMMENTS Affordability AnalysisAFMDA Acquisition Decision MemorandumARA/AM USD(AT&L) Analysis of Alternatives GuidanceCAPE Analysis of Alternatives Plan AFCAPECAPE & MDA Initial Capabilities Document AF JCS/J-8JROC Initial Threat Environment Assessment AFDIA Validation Market Research AFDPAPn/a Problem Statement (DBS) AFIRB Chair