CURRENT PORT OPENING COMPANY DESIGN. PORT OPENING COMPANY MISSION: PROVIDE SPECIALIZED ENGR SUPPORT IN OPENING, REHABILITATING, MAINTAINING PORT FACILITIES,

Slides:



Advertisements
Similar presentations
CONSTRUCTION DRILLING INC.
Advertisements

Cofferdam.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Company Profile.
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
NCF ORGANIZATION 1.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
CAREERS IN MINING. It’s an exciting time to be involved in the minerals industry.
REPLACING EAST SIDE OF BRIDGE in WEST Section Sank in 1979 Storm REBUILT and Opened in 1982 EAST Section REBUILDING Shown here HOOD CANAL.
OCEN 201 Introduction to Ocean & Coastal Engineering Coastal Processes & Structures Jun Zhang
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Economic Viability of Feeder Service for Bridgeport Presented to: SNAME Annual Meeting Management & Transportation Associates, Inc. October 25, 2001.
CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE.
MAGTF And NCF Organization.
Adelaide Coastline Sand Carting May 2004
Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
SS Cape May’s CAF Crane. Project Advisor: Dr. Han Bao Team Shannon Ershen Alonza Frazier Stanley Reese.
1. Dev. of Marine Liquid Terminal Facilities consisting of two berths 300m, each on North side of existing Jetty and a SPM in KPT waters at OOT Vadinar.
Mission Promoting the development and growth of maritime shipping via the kingdom's national port of Aqaba through; mobilizing business skills and concepts.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
JY Maritime Academy -Terminal Types Ms. Sarina Jones Mr. John Rydlund.
The Final Link in the Sealift Chain
US Army Corps of Engineers BUILDING STRONG ® Tonnage Reporting: Getting It Right Waterborne Commerce Statistics Center Navigation and Civil Works Decision.
Civil Engineering About 8 Different Subsets 1. Structures
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Company Profile. EMPIRE SOLUTIONS EXPERIENCE With more than 10 years of experience dedicated to the roofing, energy conservation, corrosion control, painting.
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
The Port of Baltimore Glossary Activity Produced by.
CAREERS IN MINING Rubin Pajoohan Fartak International Engineering co.
Port of Montreal. General Informations Port of Montreal is a Seaport located in the St. Lawrence River, in the city of Montreal, Canada. It’s situated.
11 th African Oil and Gas, Trade and Finance Conference & Exhibition May 2007, Kenyatta International Conference Centre, Nairobi, Kenya Mwendia Nyaga.
SEABEE COMBAT WARFARE PHIBCB SPECIFIC
7516 km LONG COAST LINE EEZ MILLION SQ KM EEZ MILLION SQ KM MARITIME INTERESTS.
Discovering Maritime Transportation. Significance of the Industry  Transport roughly 14% of total national freight  26.5% of total domestic ton-miles.
1 Joint Logistics Over-The-Shore (JLOTS ) Throughput Modeling Tool (JTMT) for The Ninth Annual JLOTS /Logistics-from-the-Sea Symposium 28 January 2004.
The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Sail Army! Agenda Mission Statement Commander’s Intent Task Organization Issues.
James Denton-Brown Industrial & Ports Practice Leader Bechtel Civil-San Francisco 1 Khalifa Port and Khalifa Industrial Zone-Abu Dhabi Middle East Case.
1. Sittwe Ch. 0.0 km Paletwa Ch. 158 Km Kaletwa (Ch 225 km Myeikwa (IM Border) Kyauktaw Bay of Bengal KolkataSittwe539 km SittwePaletwa158 km PaletwaKaletwa.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.
UNCLASSIFIED JLOTS 2014 Port of Anchorage Tacoma Port of Tacoma Anchorage Concept of Operation Mission Statement: 622 nd Transportation Detachment will.
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
UNCLASSIFIED 13 Jan January 2004 LtCol Larry Ryder, USMC MCCDC USMC High Speed Vessel Project Overview.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Oil and Gas Training Lusaka April 2016.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
RIVER PORTS OF NATIONAL IMPORTANCE USED FOR PUBLIC TRANSPORT RIVER PORTS OF NATIONAL IMPORTANCE USED FOR PUBLIC TRANSPORT.
Marine Dock Facilities. Marine Dock Facilities Project Experience  Design and inspection of construction of New Oil Docks – Port of CC  Rehabilitation.
NECC Adaptive, Responsive, Expeditionary 1. NECC UNCLASSIFIED 2 COMNAVELSG Williamsburg, VA 1 ST NELR Williamsburg, VA NCHB 1 Williamsburg, VA 2 ND NELR.
The Briggs Group.
Break-in-bulk, RORO or ro-ro, Project cargo
Heavy Equipment Suppliers in UAE
CBMU Mission Areas Expeditionary Medical Facilities (EMF)
Building Construction Equipment in Dubai
USCG Roles & Responsibilities During a Ship Fire
DOMESTIC WATER CARRIERS
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Nord Quality Services Α.Ε
Gatchalian, Rein Edrian Hernandez, Diana Erika Ramos, Aira Coline
Innovation, Study & Application
Disaster response to IRMA
Illinois Waterway 2020 Consolidated Closure
MARINE CONSTRUCTION & EQUIPMENT
The Port of Baltimore Glossary Activity Produced by.
Kamran Marashi, P.E., S.E. Jim Schettler, P.E., S.E.
Breaches.
Presentation transcript:

CURRENT PORT OPENING COMPANY DESIGN

PORT OPENING COMPANY MISSION: PROVIDE SPECIALIZED ENGR SUPPORT IN OPENING, REHABILITATING, MAINTAINING PORT FACILITIES, TO INCLUDE LOTS OPS. ASSIGNMENT: TO A SENIOR ENGR HQ (GROUP OR HHD ENGR TEAM). ATTACHED TO TRANSPORTATION TERMINAL BN. EMPLOYMENT: AUGMENTS A CMBT HVY BN WITH SPECIALIZED EQUIPMENT. ONE OR MORE CONSTRUCTION PLT MAY DEPLOY INDEPENDENTLY.

Organization Port Opening CP HQOPSSupply /0/101/0/380/1/5 1/1/38 3/0/10 8/2/187

CAPABILITIES SPECIALIZED PERSONNEL & EQUIPMENT FOR CONSTRUCTION OF: - LOTS OPERATIONS - OFF SHORE FACILITIES SUCH AS: - MOORING SYSTEM - JETTIES, - BREAKWATERS- PIERS - WHARFS- OTHER CARGO HANDLING STR - FACILITIES FOR ROLL ON, ROLL OF BREAK BULK AND CONTAINERIZED CARGO HANDLING. - TANKER DISCHARGE FACILITIES (POL JETTIES, SUBMARINE PIPELINE). LIMITED DREDGING AND REMOVAL OF UNDER WATER OBSTRUCTIONS. INSTAL OFF-SHORE PETROLEUM DISCHARGE SYSTEM WHERE NO NAVAL UNITS ASSIGNED.

DEPENDS ON: - HVY DIVING TEAM FOR UNDER WATER CONSTRUCTION, SURVEY, RECON, AND RECOVERY. - CMBT HVY BN FOR ADDITIONAL PERSONNEL AND EQUIPMENT SUPPORT IN REHAB AND CONSTRUCTION OR PORT. - TRANSPORTATION UNITS FOR BARGE TYPE PIERS, ELEVATED CAUSEWAYS AND FLOATING CRAFT.

BACKUP SLIDES

ARTEP TASK LIST - PILE DRIVING - PIER AND RAMP CONSTRUCTION - PIER REHABILITATION - WOODEN DOLPHIN CONSTRUCTION - UNDER WATER EXCAVATION - LANDING CRAFT RAMPS - UNDER WATER PIPELINE INSTALLATION - MOORING PILES INSTALLATION - CONVENTIONAL UNDER WATER ANCHOR SYSTEM INSTALLATION - HARBOR CRAFT REPAIR AND REFUELING FACILITIES CONSTRUCTION - ROCK CRIB CONSTRUCTION

SUMMARY OF COMPANY TRAINING/MISSION (LAST 5 YEARS) 801 ST (MARE ISLAND, CA) OVERLAND PILE DRIVING AND PIER CONSTRUCTION CONCRETE, MASONRY, ROUGH AND FINISH CARPENTRY, AND ELECTRICAL CONSTRUCTION 2 YEARS AGO THE UNIT REBUILT A FINGER PIER AND DROVE 200 PILES 3 & 4 YEARS AGO THE UNIT DEPLOYED TO THE MARSHALL ISLANDS TO DRIVE SHEET PILE AND PERFORM TYPHOON REHABILITATION THE UNIT HAS A COMPLETELY EQUIPPED AND TRAINED SURVEYOR SECTION THIS UNIT HAS PIPELINE-LAYING EQUIPMENT BUT NO ONE IS TRAINED ON THE EQUIPMENT THE COMPANY MOVED TO ITS CURRENT LOCATION 2 YEARS AGO AND IS STILL GOING THROUGH THE TRANSITION AND MOVING PROCESS 699 TH (CEIBA, PUERTO RICO) PIER AND RAMP CONSTRUCTION IN FLORIDA PIER REHABILITATION IN PUERTO RICO AND THE US VIRGIN ISLANDS FOR HURRICANE RELIEF EFFORTS ANNUAL PILE DRIVING IN THE LOCAL AREA WOODEN DOLPHIN CONSTRUCTION CARPENTRY, MASONRY, AND BULLDOZER WORK IN GUATEMALA FOR THE NEW HORIZONS TRAINING EXERCISE

Concerns Dive detachment 88K & 88L Vibratory Hammer Impact Hammers that work Corrosion of equipment

Concerns Asphalt/Concrete operator MOS, but no asphalt equipment Transportation of pontoons sections Outdated 40T cranes and parts Hauling assets (Lowboys)