Value Stream Mapping: New Application Forms Amy Mann October 26, 2006.

Slides:



Advertisements
Similar presentations
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
Advertisements

Steffes Engineered Flare System
Certification of Compliance By Evita Lagard
Air Permitting and Compliance Smithfield Foods Environmental Conference Chicago, IL July 2013.
Air Quality 101 Workshop: The Role of Pollution Prevention (P2) January 2006 Sherry Davis, CHMM.
Ramsay Group Ltd. is a leading provider of safe, reliable and effective waste gas combustion systems. Our incinerators allow our customers to operate.
CP Efficiency: The Path to Success Sarah Piziali, Construction Permit Section Supervisor.
Air Permitting in Louisiana & Texas a guide to compliance requirements presented by: Shonta’ Moore, MS Air Permitting Specialist - Environmental Division.
Tuesday Oct. 7, 2014 Implementation of Permit Exemption Criteria Category No. 38 Tom Corbett, Governor Dana Aunkst, Acting Secretary.
Self-monitoring programme for a Swedish power plant Hans-Roland Lindgren Director Swedish EPA 1.
Air Pollution Grab Bag. Middletown Coke Produce coke from coal which will be used by AK Steel to produce iron Facility will have 100 ovens and produce.
Environmental Controls. Learning Objectives TLW be able to identify various types of environmental control equipment used in the process industry. TLW.
Auto Body and Paint Shops Pollution Prevention and Best Management Practices.
Oil & Gas Permitting Issues and Guidance Revisions Statewide and Jonah/Pinedale Development Area Mark Smith Wyoming DEQ/AQD.
VOC Emissions Control from Industrial and Commercial Sources Dr. Miriam Lev-On The LEVON Group, LLC SP7: Current Control Strategies for Industrial Emissions.
VOC and NO x Rules Related to the Oil and Natural Gas Industries Air Quality Division Bob Gifford Air Quality Specialist, Air Quality Division Presented.
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
Blue Skies Delaware; Clean Air for Life Delaware’s Air Permitting Seminar 2008 Paul E. Foster, P.E. – Program Manager Delaware Department of Natural Resources.
Pinal County Air Quality Workshop Casa Grande – January 14, 2014 Kale Walch & Anu Jain – Permit Engineers.
Indiana Environmental Health Summit Indiana Department of Environmental Management (IDEM) June 6, 2011 Thomas W. Easterly, P.E., BCEE, QEP Commissioner,
1 Improving Environmental Protection and Reducing Administrative Burden North Carolina Division of Air Quality Improving Environmental Protection and Reducing.
Collision Repair Hazardous Waste Environmental Compliance Paid for, in part, by the Kansas Department of Health and Environment.
New Orleans / ACC / SOCMA November 2003 Randy McDonald, OAR, USEPA.
Analysis of Existing and Potential Regulatory Requirements and Emission Control Options for the Silver Lake Power Plant APPA Engineering & Operations Technical.
Evaluation of Thermal Processes for CCA Wood Disposal in Existing Facilities Florida Center for Solid & Hazardous Waste Management Anadi Misra 1, Chang-Yu.
The Reality of Measuring Small Business Environmental Compliance Assistance Kenya Stump.
Pollution Prevention Case Study
1 Gila River Indian Community By Will Antone III, Air Quality Specialist.
Rhode Island’s ERP Experience: Automotive Refinishing Sector Richard T. Enander, Ph.D. Bureau of Environmental Protection/OTCA RI Department of Environmental.
Steps in the Hazardous Waste Permit Reissuance Process December 10, 2014.
Air Permitting Update Yogesh Doshi ACE Academy New Jersey Department of Environmental Protection.
Lori Hanson Title V Operating Permit Supervisor (515)
Blue Skies Delaware; Clean Air for Life DNREC Air Quality Management Air Permitting Seminar Natural Minor Permitting.
Comprehensive Regulatory Revision Office of Developmental Programs.
Value Stream Mapping the Delaware Air Quality Permitting Process
Blue Skies Delaware; Clean Air for Life NESHAPs Jim Snead October 8, 2008.
SCAQMD Air Quality Permitting for Emerging Technologies Jay Chen, P.E. South Coast Air Quality Management District November 4, 2009 Southern California.
1 June 23, 2004 Sacramento Thermal Spraying ATCM Second Public Workshop.
WRAP States Four Factor Reasonable Progress Lee Gribovicz WRAP IWG Meeting March 10, 2009.
RECLAIM Seminar October 26, 2005 Judy B. Yorke, P.E., C.P.P. Yorke Engineering, LLC x25
Blue Skies Delaware; Clean Air for Life Common problems with draft applications Technical review Shaikh A. Tayeb, Ph.D., P.E. DNREC-Air Quality Management.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
New Air Quality General Permit G-70A Oil and Natural Gas Industry Workshop October 24, 2012 Laura Jennings Engineer DEP – Division of Air Quality 10/24/2012.
Minor NSR Program and Highlights of the Proposed Tribal Major Nonattainment and Minor NSR Rules Jessica Montañez U.S. Environmental Protection Agency Office.
Blue Skies Delaware; Clean Air for Life 10/8/08 Minor New Source Review Alberto Roybal.
Blue Skies Delaware; Clean Air for Life Value Stream Mapping: New Application Forms Amy Mann October 8, 2008.
1. Stationary and Area Sources Committee Recommendations OTC Annual Meeting 2010 Baltimore, MD 2.
The Strategic Goals Program for Metal Finishers: New Strategies for Success Environmental Management Systems (EMS) and Metal Finishers Norma Murphy DPPEA.
Value Stream Mapping: August 2005 Current State Nancy Terranova October 26, 2006.
Middle Fork Project Relicensing Process Plan April 25, 2006.
1 DE Air Regulation Development Large Industrial Boilers/Process Heaters at Refineries with Heat Input >= 200 mmBTU/hr Committee Meeting #3 June 21, 2006.
Indiana Chamber of Commerce Environmental Roundtable August 25, 2008 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of Environmental.
Blue Skies Delaware; Clean Air for Life Synthetic Minor Permitting Process Steve Mann.
Game-Changing Technology for Oil Water Separation. The Development of the RJOS High Efficiency Oil Water Separation System Presented by Wade Bozak C.E.T.
South Framingham Initiative MassDEP’s Project to Improve Environmental Quality in an Environmental Justice Neighborhood 2015.
Updates from Ohio EPA DAPC
Iowa Waste Reduction Center Jennifer Wittenburg - Program Manager
Compliance and Enforcement Presentation to Industrial Association of Contra Costa County February 22, 2017 Paul Grazzini, Air Quality Specialist Bay.
ISG Regulatory Update September 1, 2017
Chemical Engineering Drawing
EPA’S New Source Performance Standard (NSPS)
E-PRTR Regulation PRTR Protocol
GENERAL PERMITS ACE ACADEMY / May 9, 2018.
Air Quality Permitting Guidelines for Industrial Sources
Oil and Gas Sector E&P Reporting Protocol
Boiler Sheltered Initiative
NACAA Fall Membership Meeting October 1, 2012
Air Quality Permitting Guidelines for Industrial Sources
Energy & Materials Flow & Cost Tracker (EMFACT)
Presentation transcript:

Value Stream Mapping: New Application Forms Amy Mann October 26, 2006

Regulation 1102 Current State (As of August 2005) Only 55% of incoming applications were Administratively Complete. Only 55% of incoming applications were Administratively Complete. Only 10% of incoming applications were Technically Complete. Only 10% of incoming applications were Technically Complete. 90% of incoming applications did not contain all of the information needed to process a permit! 90% of incoming applications did not contain all of the information needed to process a permit!

Regulation 1102 Current State (As of August 2005)

Kaizen Burst The application forms were causing most of our wasted time and rework! The application forms were causing most of our wasted time and rework! New application forms that clearly outline expectations needed to be developed. New application forms that clearly outline expectations needed to be developed.

Application Workgroups AQM did not want to develop the new application forms in a vacuum. AQM did not want to develop the new application forms in a vacuum. AQM formed an Internal and External Application Workgroup. AQM formed an Internal and External Application Workgroup.

Internal Application Workgroup Consisted of Engineering & Compliance Branch Engineers and Scientists. Consisted of Engineering & Compliance Branch Engineers and Scientists. Determined what information was needed for each type of process equipment and control device. Determined what information was needed for each type of process equipment and control device. Developed draft application forms for the External Application Workgroup to review. Developed draft application forms for the External Application Workgroup to review. Began meeting in October Began meeting in October 2005.

External Application Workgroup Consisted of representatives from the regulated community and the DNREC Small Business Ombudsman. Consisted of representatives from the regulated community and the DNREC Small Business Ombudsman. Reviewed and commented on draft application forms. Reviewed and commented on draft application forms. Began meeting in February Began meeting in February Met nine times between February and July 2006 for two hours each time. Met nine times between February and July 2006 for two hours each time.

External Application Workgroup Participants Kimberly Chesser – DNREC Kimberly Chesser – DNREC Lewis Graham – Dow Reichhold Lewis Graham – Dow Reichhold Amy Mann – DNREC Amy Mann – DNREC Harry Monck – Salvage Yards Harry Monck – Salvage Yards Richard Murphy – Eagle Group Richard Murphy – Eagle Group Sol Peltz – Hercules Sol Peltz – Hercules Julie Simon – Noramco, Inc. Julie Simon – Noramco, Inc. Paula Sitar – Dixon Environmental Paula Sitar – Dixon Environmental Thomas Webster - DaimlerChrysler Thomas Webster - DaimlerChrysler

Old Application Forms AQM-4 for Process Equipment AQM-4 for Process Equipment Supplemental forms for Control Devices Supplemental forms for Control Devices AQM-3 for Incinerators AQM-3 for Incinerators AQM-2 for Combustion Equipment AQM-2 for Combustion Equipment AQM-9 for Cold Solvent Cleaners AQM-9 for Cold Solvent Cleaners AQM-12 for Soil Vapor Extraction Units AQM-12 for Soil Vapor Extraction Units

Old Application Forms Too generic Too generic Difficult on the eyes Difficult on the eyes Did not ask for all needed information Did not ask for all needed information Instructions located in separate documents Instructions located in separate documents Illogical numbering system employed Illogical numbering system employed

New Application Forms The forms use a Building Block Approach: The forms use a Building Block Approach: Administrative Form Administrative Form Overall Process Flow Diagram Overall Process Flow Diagram Process Equipment Process Equipment Control Device Control Device Emissions Information Emissions Information Air Toxics Modeling Air Toxics Modeling Applications can be customized to meet project needs. Applications can be customized to meet project needs. The forms include interactive instructions. The forms include interactive instructions.

Administrative Form Form Number AQM-1 Form Number AQM-1 Focuses On: Focuses On: Site Information Site Information Application Information Application Information One Administrative Form must be completed with each application. One Administrative Form must be completed with each application. eg2/FormsTable.htm eg2/FormsTable.htm eg2/FormsTable.htm eg2/FormsTable.htm

Overall Process Flow Diagram Form Form Number AQM-2 Form Number AQM-2 Focuses On: Focuses On: How all of the process equipment and control devices fit together How all of the process equipment and control devices fit together How all of the documents in the application fit together How all of the documents in the application fit together One Process Flow Diagram must be completed for each process. One Process Flow Diagram must be completed for each process. FormsTable.htm FormsTable.htm FormsTable.htm FormsTable.htm

Process Equipment Forms Form Numbers AQM-3.1 through Form Numbers AQM-3.1 through Focuses On: Focuses On: Individual emission units. Individual emission units. Customized for different types of process equipment. Customized for different types of process equipment. One Process Equipment Form must be completed for each emission unit. One Process Equipment Form must be completed for each emission unit.

Process Equipment Forms AQM-3.1: Generic Process Equipment AQM-3.1: Generic Process Equipment AQM-3.2: Boilers AQM-3.2: Boilers AQM-3.3: Generators/Engines AQM-3.3: Generators/Engines AQM-3.4: Coating Operations AQM-3.4: Coating Operations AQM-3.5: VOC Storage Tanks AQM-3.5: VOC Storage Tanks AQM-3.6: Cold Solvent Cleaners (Degreasers) AQM-3.6: Cold Solvent Cleaners (Degreasers)

Process Equipment Forms AQM-3.7: Silos AQM-3.7: Silos AQM-3.8:Used Oil Heaters AQM-3.8:Used Oil Heaters AQM-3.9:Stone Crushers AQM-3.9:Stone Crushers AQM-3.10:Pulverized or Fines Crushers AQM-3.10:Pulverized or Fines Crushers AQM-3.11:Crematories AQM-3.11:Crematories AQM-3.12:Printing Operations AQM-3.12:Printing Operations 2/FormsTable.htm 2/FormsTable.htm 2/FormsTable.htm 2/FormsTable.htm

Future Process Equipment Forms AQM-3.13:Vapor Degreasers AQM-3.13:Vapor Degreasers AQM-3.14:Grain Dryers AQM-3.14:Grain Dryers AQM-3.15:Receiving Pits AQM-3.15:Receiving Pits Any other suggestions from the regulated community. Any other suggestions from the regulated community.

Control Device Forms Form Numbers AQM-4.1 through 4.11 Form Numbers AQM-4.1 through 4.11 Focuses On: Focuses On: Individual control devices Individual control devices Customized for different types of control devices Customized for different types of control devices One Control Device Form must be completed for each control device. One Control Device Form must be completed for each control device.

Control Device Forms AQM-4.1:Incinerators/ Afterburners/Oxidizers AQM-4.1:Incinerators/ Afterburners/Oxidizers AQM-4.2:Adsorption Equipment AQM-4.2:Adsorption Equipment AQM-4.3:Flares AQM-4.3:Flares AQM-4.4:Scrubbers AQM-4.4:Scrubbers AQM-4.5:Inertial/Cyclone Collectors AQM-4.5:Inertial/Cyclone Collectors AQM-4.6:Baghouses AQM-4.6:Baghouses

Control Device Forms AQM-4.7:Electrostatic Preciptators AQM-4.7:Electrostatic Preciptators AQM-4.8:Venturi Scrubbers AQM-4.8:Venturi Scrubbers AQM-4.9:SCR/NSCR/SNCR/ Ammonia Injection AQM-4.9:SCR/NSCR/SNCR/ Ammonia Injection AQM-4.10:Settling Chambers AQM-4.10:Settling Chambers AQM-4.11:Knock Out Pots AQM-4.11:Knock Out Pots ormsTable.htm ormsTable.htm ormsTable.htm ormsTable.htm

Future Control Device Forms AQM-4.12: Condensers AQM-4.12: Condensers Any other suggestions from the regulated community. Any other suggestions from the regulated community.

Emissions Information Form Form Number AQM-5 Form Number AQM-5 Focuses On: Focuses On: Pollutant emissions from each emission unit and after each control device Pollutant emissions from each emission unit and after each control device Overall process emissions Overall process emissions One Emissions Information Form must be completed for each process. One Emissions Information Form must be completed for each process. FormsTable.htm FormsTable.htm FormsTable.htm FormsTable.htm

Air Emissions Modeling Form Form Number AQM-6 Form Number AQM-6 Focuses On: Focuses On: SCREEN3 Modeling SCREEN3 Modeling The Air Emissions Modeling Form is optional. The Air Emissions Modeling Form is optional. Completing this form may speed up the permitting process. Completing this form may speed up the permitting process. If included, one Air Emissions Modeling Form must be completed for each process. If included, one Air Emissions Modeling Form must be completed for each process. FormsTable.htm FormsTable.htm FormsTable.htm FormsTable.htm

The Future The forms are evergreen. The forms are evergreen. AQM will be accepting comments on the forms and updating them once per year. AQM will be accepting comments on the forms and updating them once per year. AQM plans to create a comment webpage where comments on the forms can be posted and reviewed. AQM plans to create a comment webpage where comments on the forms can be posted and reviewed.

Example New Facility New Facility Not located in Coastal Zone Not located in Coastal Zone Makes wooden office desks Makes wooden office desks Wood shop controlled by a baghouse Wood shop controlled by a baghouse Coating spray booth with a 16 MMBTU/hr natural gas fired oven Coating spray booth with a 16 MMBTU/hr natural gas fired oven

How to Complete Application Two processes Two processes Wood shop and baghouse Wood shop and baghouse Spray booth and oven Spray booth and oven Forms to complete Forms to complete One AQM-1 One AQM-1 Two AQM-2s Two AQM-2s One for wood shop and baghouse One for wood shop and baghouse One for spray booth and oven One for spray booth and oven

How to Complete Application Forms to Complete Forms to Complete Two AQM-3s Two AQM-3s One AQM-3.1 (Generic Equipment) for wood shop One AQM-3.1 (Generic Equipment) for wood shop One AQM-3.4 (Coating Operations) for spray booth and oven One AQM-3.4 (Coating Operations) for spray booth and oven One AQM-4 One AQM-4 One AQM-4.6 (Baghouses) for Baghouse One AQM-4.6 (Baghouses) for Baghouse

How to Complete Application Forms to Complete Forms to Complete Two AQM-5s Two AQM-5s One for wood shop and baghouse One for wood shop and baghouse One for spray booth and oven One for spray booth and oven Two AQM-6s (Optional) Two AQM-6s (Optional) One for wood shop and baghouse One for wood shop and baghouse One for spray booth and oven One for spray booth and oven

Example AQM-1

Example AQM-2

Example AQM-3.1

Example AQM-4.6 Will be made when form is finalized Will be made when form is finalized

Example AQM-5 Will be made when form is finalized Will be made when form is finalized

Example AQM-6 Will be made when form is finalized. Will be made when form is finalized.

Where to Find the Forms ervices/permits.htm ervices/permits.htm ervices/permits.htm ervices/permits.htm eg2/ eg2/ eg2/ eg2/

Contact Information Amy Mann Engineer III (302)