Prestressed Concrete Beam Camber – 26” Slab

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
1 A B C
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AP STUDY SESSION 2.
Reflection nurulquran.com.
1
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
& dding ubtracting ractions.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
David Burdett May 11, 2004 Package Binding for WS CDL.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1 The following is an example of calculations performed to determine the time dependent camber values and prestress losses for a BT84 precast concrete.
1 1  1 =.
CHAPTER 18 The Ankle and Lower Leg
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Summative Math Test Algebra (28%) Geometry (29%)
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
Look at This PowerPoint for help on you times tables
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Slide R - 1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Prentice Hall Active Learning Lecture Slides For use with Classroom Response.
Subtraction: Adding UP
: 3 00.
5 minutes.
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
& dding ubtracting ractions.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
1.step PMIT start + initial project data input Concept Concept.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

Prestressed Concrete Beam Camber – 26” Slab The following is an example of calculations performed to determine the time dependent camber values for 26-inch precast concrete slab with a span length of 65 feet. The slab has 38 strands with properties as indicated on the Prestressed Slab Design Sheet.

Prestressed Concrete Beam Camber – 26” Slab Compute upward deflection at release of strand Assume at this point that the modulus of elasticity is 0.70 times the final value. ___ EC = (0.70) 33000K1WC1.5 √f’C (AASHTO 5.4.2.4-1) _____ = (0.70)(33000)(1.0)(0.145)1.5√(5.50) = 2991 ksi ES = 28500 (AASHTO 5.4.4.2) I = 63596 in4 A = 851 in2 yC = 5.36” w = 0.916 k/ft = 0.0763 k/in

Prestressed Concrete Beam Camber – 26” Slab Compute initial stress loss Total jacking force = (31 kips/strand)(38 strands) = 1178 kips Prestress Moment = (1178)(13.00 - 5.36) = 9000 inch kips Maximum moment from beam weight = (0.0763)(780)2 = 5803 inch kips 8 Net maximum moment = 9000 – 5803 = 3197 inch kips fcgp = Concrete stress at strand cg = 1178 + (3197)(13.00 - 5.36) = 1.77 ksi 851 (63596)

Prestressed Concrete Beam Camber – 26” Slab Prestress loss due to elastic shortening = ΔfpES = Epfcgp Ect Strain in concrete = 1.77/2991 = 0.00059177 Stress loss in strand = (28500)(0.00059177) = 16.86 ksi Assume 16.00 ksi will be the loss at release. Revised prestressed force = [ 31.0 – 16.00] (0.153)(38) = 1085 kips 0.153 Revised prestressed moment = (1085)(13.00 – 5.36) = 8289 inch kips fcgp = 1085 + (8289 - 5803)(13.00 - 5.36) = 1.57 ksi 851 (63596) Strain in concrete = 1.57/2991 = 0.000524908 Revised stress loss in strand = (28500)(0.000524908) = 14.96 ksi

Prestressed Concrete Beam Camber – 26” Slab Use a prestress loss of 15.00 ksi, prestress force = 1091 kips, and strain = 0.00052632 Prestress stress after 15.00 ksi loss = (31)/(0.153) – 15.00 = 188 ksi Use the Moment-Area method to determine the upward deflection of the slab at release. Compute the moment in the slab induced by the eccentric prestressed strands. Strand eccentricity = 26 -5.36 = 7.64 in 2 Prestress moment in slab = (1091)(7.64) = 8335 in kips This moment is assumed to be constant over the full length of the slab, neglecting the effect of debonded strands. Use the Moment Area method to determine the prestress deflection at midspan from the prestress force at release. The deflection is equal to the moment of the area of the M/EI diagram between the end of the beam and midspan about the end support.

Prestressed Concrete Beam Camber – 26” Slab The constant value of M/EI = 8335 = 0.000043819/in (2991)(63596) The moment of the area between midspan and the end of the beam about the end of the beam = (0.000043819)(780/2)(780/4) = 3.33 inches This is the upward deflection caused by the load from the prestress strand not including the weight of the beam. The downward deflection of the beam from self weight = 5wL4 384EI w = 0.0763 kips/inch, L = 780 inches, E = 2991 ksi, I = 63596 in4 ∆ = (5)(0.0763)(780)4 = 1.93 inches (384)(2991)(63596) The net upward deflection at midspan at release = 3.33-1.93 = 1.40 inches

Prestressed Concrete Beam Camber – 26” Slab Compute the upward deflection 3 months after release. The creep coefficient is determined from AASHTO formula 5.4.2.3.2-1, Ψ(t, ti) = 1.9 ks khc kf ktd ti -0.118 ks = 1.45 – 0.13(V/S) ≥ 1.0 V/S is the volume to surface ratio = (48)(26) = 8.43 (48)(2) + (26)(2) ks = 1.45 – 0.13(8.43) = 0.354 → 1.0 khc = 1.56 – 0.008H, H = 70 (From AASHTO Figure 5.4.2.3.3-1) khc = 1.56 – (0.008)(70) = 1.0 kf = 5 = 5 = 0.77 1+f’c 1 + 5.5

Prestressed Concrete Beam Camber – 26” Slab ktd = t = 90 = 0.70 61 – 4f’c + t 61 – (4)(5.5) + 90 Ψ(t, ti) = (1.90)(1.0)(1.0)(0.77)(0.70)(1.0)-0.118 = 1.02 Creep deflection = (1.02)(1.40) = 1.43 inches Compute strand stress loss due to creep. ΔfpCR = Ep fcgp Ψ(t, ti) Kid (AASHTO 5.9.5.4.2b-1) Eci Kid = 1 . 1 + EpAps [1+ Age2pg][1 + 0.7Ψb(tf, ti)] EciAg Ig

Prestressed Concrete Beam Camber – 26” Slab Ep = 28500 ksi Aps = (38)(0.153) = 5.81 in2 Eci = 2991 ksi Ag = 851 in2 epg = 13.00 – 5.36 = 7.64 in Ig = 63596 in4 Ψb = 1.02 Kid = 1 = 0.834 1 + (28500)(5.81) [1+ (851)(7.64)2][1 + (0.7)(1.02)] (2991)(851) 63596 ΔfpCR = (28500)(1.57)(1.02)(0.834) = 12.72 ksi (2991)

Prestressed Concrete Beam Camber – 26” Slab Compute strand stress loss from shrinkage ∆fpSR = εbidEpKid εbid = ks khs kf ktd 0.48x10-3 (AASHTO 5.4.2.3.3-1) khs = 2.00 – 0.014H, H=70, khs = 2.0 – (0.014)(70) = 1.02 εbid = (1.0)(1.02)(0.77)(0.70)(0.48x10-3) = 0.000264 ∆fpSR = (0.000264)(28500)(0.834) = 6.27 ksi Total stress loss from creep and shrinkage = 12.72 + 6.27 = 18.99 ksi Downward deflection from creep and shrinkage = (3.33)(18.99/188) = 0.34 inches

Prestressed Concrete Beam Camber – 26” Slab Strand stress loss from relaxation (AASHTO C5.9.5.4.2c-1) = ∆fpR1 = fpt log(24t) [(fpt/fpy) -0.55] [1- 3(ΔfpSR + ΔfpCR) ]Kid K’L log(24t1) fpt fpt = stress after transfer = 188ksi t = 90 days K’L = 45 ti = 1.0 days fpy = (0.90)(270) = 243 ksi ΔfpSR = Stress loss in strand from shrinkage = 6.27 ksi ΔfpCR = Stress loss in strand from creep = 12.72 ksi Kid = 0.834 ∆fpR1 = (188) log [(24)(90)] [(188/243) – 0.55] [1 – 3(6.27+12.72)](0.834) = 1.31 ksi (45) log [(24)(1.0)] 188 Downward deflection due to relaxation in strand = (0.98)(3.33) = 0.02 inches (188)

Prestressed Concrete Beam Camber – 26” Slab Total downward deflection due to creep, shrinkage and relaxation = 0.34 + 0.02 = 0.36” Total upward deflection at 3 months = 1.40 + 1.43 – 0.36 = 2.47 inches Compute downward deflection due to 40 psf superimposed dead load (90 days) __ ____ EC = 33000 K1 wc1.5 √f’c = (33000)(1.0)(0.145)1.5√5.50 = 4273 ksi w = uniform load/slab = (4.0)(40) = 160 lbs/ft = 0.160 kips/ft = 0.0133 kips/inch ∆ = 5wL4 = (5)(0.01333)(780)4 = 0.24” 384EI (384)(4273)(63596)

Prestressed Concrete Beam Camber – 26” Slab Compute concrete stress (tension) at strand cg from this load Moment = wL2/8 = (0.0133)(780)2/8 = 1011 inch kips Stress at strand cg at midspan = My/I = (1011)(7.64)/(63596) = 0.12 ksi Strain in concrete = 0.12/4273 = 0.00002808 Stress gain in strand = (0.00002808)(28500) = 0.80 ksi Compute deflection 5 years after release Upward at release of prestress = 1.40 inches Compute creep coefficient for 5 years = 1825 days Ψ(t, ti) = 1.9 ks khc kf ktd ti-0.118

Prestressed Concrete Beam Camber – 26” Slab ks = 1.45 – 0.13(8.43) = 0.354 → 1.0 khc = 1.56 – 0.008H, H = 70 (From AASHTO Figure 5.4.2.3.3-1) khc = 1.56 – (0.008)(70) = 1.0 kf = 5 = 5 = 0.77 1+f’c 1 + 5.5 ktd = t = 1825 = 0.98 61 – 4f’c + t 61 – (4)(5.5) + 1825 ti = 1.0 Ψ(t, ti) = (1.90)(1.0)(1.0)(0.77)(0.98)(1.0)-0.118 = 1.43 Compute creep coefficient for wearing surface load application (90 days to 5 years) Ψ(t, ti) = 1.9 ks khc kf ktd ti-0.118

Prestressed Concrete Beam Camber – 26” Slab ks = 1.45 – 0.13(8.43) = 0.354 → 1.0 khc = 1.56 – 0.008H, H = 70 (From AASHTO Figure 5.4.2.3.3-1) khc = 1.56 – (0.008)(70) = 1.0 kf = 5 = 5 = 0.77 1+f’c 1 + 5.5 ktd = t = 1825 = 0.98 61 – 4f’c + t 61 – (4)(5.5) + 1825 ti = 90.0 Ψ(t, ti) = (1.90)(1.0)(1.0)(0.77)(0.98)(90)-0.118 = 0.84

Prestressed Concrete Beam Camber – 26” Slab Upward deflection from release of prestress 5 years after release = (1.43)(1.40) + 1.40 = 3.40 inches Strain in concrete due to creep = (0.00052632)(1.43) = 0.00075264 Strand stress loss from creep = (28500)(0.00075264) = 21.45 ksi Downward deflection from wearing surface 5 years after release = 0.24 + (0.84)(0.24) = 0.44 inches Strain in concrete due to wearing surface 5 years after release = (0.84)(0.00002808) = 0.00002359 Stress gain in strand from wearing surface creep = (0.00002359)(28500) = 0.67 ksi Total strand stress gain from wearing surface = 0.80 + 0.67 = 1.47 ksi

Prestressed Concrete Beam Camber – 26” Slab Compute shrinkage coefficient Shrinkage strain (AASHTO 5.4.2.3.3-1) = εsh = ks khs kf ktd 0.48x10-3 ks = 1.45 – 0.13(8.43) = 0.354 → 1.0 khs = 2.00 – 0.014H, H=70, khs = 2.0 – (0.014)(70) = 1.02 kf = 5 = 5 = 0.77 1+f’c 1 + 5.5 ktd = t = 1825 = 0.98 61 – 4f’c + t 61 – (4)(5.5) + 1825 εsh = (1.0)(1.02)(0.77)(0.98)(0.48x10-3) = 0.0003694 Strand stress loss from shrinkage = (28500)(0.0003694) = 10.53 ksi Strand stress loss from creep, including wearing surface, = 21.45 – 1.47 = 19.98 ksi Total strand stress loss from creep and shrinkage = 19.98 + 10.53 = 30.51 ksi

Prestressed Concrete Beam Camber – 26” Slab Downward deflection due to stress loss = (30.51)(3.33) = 0.54 inches (188) Compute strand stress loss due to relaxation Strand stress loss from relaxation (AASHTO C5.9.5.4.2c-1) = ∆fpR1 = fpt log(24t) [(fpt/fpy) -0.55] [1- 3(ΔfpSR + ΔfpCR) ]Kid K’L log(24t1) fpt fpt = stress after transfer = 188ksi t = 1825 days K’L = 45 ti = 1.0 days fpy = (0.90)(270) = 243 ksi ΔfpSR = Stress loss in strand from shrinkage = 10.53 ksi ΔfpCR = Stress loss in strand from creep = 19.98 ksi

Prestressed Concrete Beam Camber – 26” Slab Kid = 1 = 0.81 1 + (28500)(5.81) [1+ (851)(7.64)2][1 + (0.7)(1.43)] (2991)(851) 63596 ∆fpR1 = (188) log [(24)(1825)] [(188/243) – 0.55] [1 – 3(10.53+19.98)](0.81) = 1.31 ksi (45) log [(24)(1.0)] 188 Downward deflection due to relaxation in strand = (1.31)(3.33) =0.02 inches (188) Total deflection at 5 years = 3.40 – 0.44 – 0.54 – 0.02 = 2.40 inches Compute final strand stress loss at 27 years (as on Slab Design Sheet) Compute creep coefficient at 27 years (9855 days) Ψ(t, ti) = 1.9 ks khc kf ktd ti-0.118

Prestressed Concrete Beam Camber – 26” Slab ks = 1.45 – 0.13(8.43) = 0.354 → 1.0 khc = 1.56 – 0.008H, H = 70 (From AASHTO Figure 5.4.2.3.3-1) khc = 1.56 – (0.008)(70) = 1.0 kf = 5 = 5 = 0.77 1+f’c 1 + 5.5 ktd = t = 9855 = 1.00 61 – 4f’c + t 61 – (4)(5.5) + 9855 ti = 1.0 Ψ(t, ti) = (1.90)(1.0)(1.0)(0.77)(1.00)(1.0)-0.118 = 1.46

Prestressed Concrete Beam Camber – 26” Slab Compute creep coefficient at 27 years (9855 days) starting at 90 days for wearing surface Ψ(t, ti) = 1.9 ks khc kf ktd ti-0.118 ks = 1.45 – 0.13(8.43) = 0.354 → 1.0 khc = 1.56 – 0.008H, H = 70 (From AASHTO Figure 5.4.2.3.3-1) khc = 1.56 – (0.008)(70) = 1.0 kf = 5 = 5 = 0.77 1+f’c 1 + 5.5 ktd = t = 9855 = 1.00 61 – 4f’c + t 61 – (4)(5.5) + 9855 ti = 90.0 Ψ(t, ti) = (1.90)(1.0)(1.0)(0.77)(1.00)(90)-0.118 = 0.86

Prestressed Concrete Beam Camber – 26” Slab Strain in concrete due to creep = (0.00052632)(1.46) = 0.00076843 Strand stress loss due to creep = (28500)(0.00076843) = 21.90 ksi Strand stress gain due to wearing surface = 0.80 ksi Strain in concrete due to wearing surface = (0.00002808)(0.86) = 0.000024149 Strand stress gain from wearing surface creep = (0.000024149)(28500) = 0.69 ksi Total strand stress loss from creep = 21.90 – 0.80 – 0.69 = 20.41 ksi Compute shrinkage coefficient at 27 years (9855 days) εsh = ks khs kf ktd 0.48x10-3

Prestressed Concrete Beam Camber – 26” Slab ks = 1.45 – 0.13(8.43) = 0.354 → 1.0 khs = 2.00 – 0.014H, H=70, khs = 2.0 – (0.014)(70) = 1.02 kf = 5 = 5 = 0.77 1+f’c 1 + 5.5 ktd = t = 9855 = 1.00 61 – 4f’c + t 61 – (4)(5.5) + 9855 εsh = (1.0)(1.02)(0.77)(1.00)(0.48x10-3) = 0.0003770 Strand stress loss from shrinkage = (28500)(0.0003770) = 10.74 ksi Total strand loss from creep and shrinkage = 21.90 - 0.80 – 0.69 + 10.74 = 31.15 ksi

Prestressed Concrete Beam Camber – 26” Slab Compute stress loss from relaxation Kid = 1 = 0.81 1 + (28500)(5.81) [1+ (851)(7.64)2][1 + (0.7)(1.46)] (2991)(851) 63596 ∆fpR1 = (188) log [(24)(9855)] [(188/243) – 0.55] [1 – 3(10.74+20.41)](0.81) = 1.48 ksi (45) log [(24)(1.0)] 188 Total stress loss = 15.00 + 31.15 +1.48 = 47.63 ksi Compute shortening 2 weeks after transfer of prestress (as on Slab Design Sheet) Compute creep coefficient at 2 weeks (14 days) Ψ(t, ti) = 1.9 ks khc kf ktd ti-0.118

Prestressed Concrete Beam Camber – 26” Slab ks = 1.45 – 0.13(8.43) = 0.354 → 1.0 khc = 1.56 – 0.008H, H = 70 (From AASHTO Figure 5.4.2.3.3-1) khc = 1.56 – (0.008)(70) = 1.0 kf = 5 = 5 = 0.77 1+f’c 1 + 5.5 ktd = t = 14 = 0.26 61 – 4f’c + t 61 – (4)(5.5) + 14 ti = 1.0 Ψ(t, ti) = (1.90)(1.0)(1.0)(0.77)(0.26)(1.00)-0.118 = 0.38 Elastic Shortening = Fps L = (1091)(780) = 0.33” AEci (851)(2991) Shortening from creep = (0.33)(0.38) = 0.13 inches

Prestressed Concrete Beam Camber – 26” Slab Compute shrinkage coefficient at 2 weeks (14 days) εsh = ks khs kf ktd 0.48x10-3 ks = 1.45 – 0.13(8.43) = 0.354 → 1.0 khs = 2.00 – 0.014H, H=70, khs = 2.0 – (0.014)(70) = 1.02 kf = 5 = 5 = 0.77 1+f’c 1 + 5.5 ktd = t = 14 = 0.26 61 – 4f’c + t 61 – (4)(5.5) + 14 εsh = (1.0)(1.02)(0.77)(0.26)(0.48x10-3) = 0.00009802

Prestressed Concrete Beam Camber – 26” Slab Shortening from shrinkage = (780)(0.00009802) = 0.076 inches Elastic shortening = 0.33 inches Neglect effects of strand relaxation Total shortening at 2 weeks = 0.33 + 0.13 + 0.076 = 0.54 inches

Prestressed Concrete Beam Camber – 26” Slab