Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, 2008 1 WPM & HLS Status and Schedule Franz Peters, Georg Gassner.

Slides:



Advertisements
Similar presentations
The York College Radio Telescope Ian OLeary, Tim Paglione, & Waynewright Joseph (York College, CUNY) Introduction Radio telescopes allow us to observe.
Advertisements

Basic Jens Neigaard.
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
October 21, 2005 Internal LCLS Undulator Alignment and Motion Review Georg Gassner, SLAC / MET 1 HLS Monitoring System Georg.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wire Position System The Undulator.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
D. Schultz FAC 6/17/08 1 Undulator Travel and Girder Assembly Undulator commissioning Translation limits Interference The plan.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
Three types of network cabling Star Topology Tree Topology Linear Bus.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 1 LCLS Undulator Undulator Network.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
J T Volk Fermilab April 2008 Ground Motion Studies at Fermi National Accelerator Laboratory James T Volk Applications Physicist II Vladimir Shiltsev, Shavkat.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
Installation status of the HLS system Aug. 12, 2009 G. Gassner, M. Masuzawa, R. Ruland, M. Satoh and R. Sugahara.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
Sector 0 To improve the performance of FACET, sectors 2-6 and (a total of 900m beam-line) were realigned using the laser alignment system as their.
PACMAN : technical objectives Hélène Mainaud Durand.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
SUPERKEKB MAIN RING TUNNEL MOTION M. Masuzawa, T. Adachi, H. Iinuma, T. Kawamoto and Y. Ohsawa, KEK Tsukuba, Japan
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
The LCLS-II project consists of a new gun, a new superconducting linac, and new variable gap undulators. Civil construction will be at a minimum, and existing.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
Some movement monitor systems at DESY
STF Wire Position Monitor
BCTW calibration status and future
XFEL Vacuum System Commissioning
Need for Alignment Position of off-momentum proton w.r.t. beam
SCU Next Phase Meeting July 8, 2014.
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
LCLS Undulator System Production Management
Undulator Integration Test Status
Fixed Support Design & Testing
Electron Beam Systems ETC and Methodology
Alignment Diagnostic System Status
Breakout Session SC3 – Undulator
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner SLAC / MET  Reminder  Hardware  Status  Schedule  Reminder  Hardware  Status  Schedule

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, Reminder Undulator Length = 132 Meter plus… 33 U-Segments need to be stable in a line within a few microns X & Y- Motion of single U - Segments could be larger, eventually… Vertical U-Position = f (Support temperature) = ~ 15 Micron/ºC Unpredictable motions may occur by several reasons, as … Undulator Length = 132 Meter plus… 33 U-Segments need to be stable in a line within a few microns X & Y- Motion of single U - Segments could be larger, eventually… Vertical U-Position = f (Support temperature) = ~ 15 Micron/ºC Unpredictable motions may occur by several reasons, as …

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM = Wire Position Monitor HLS = Hydro Leveling System Conductive wire is stretched (140 m) inside a conductive tube (8 mm) RF Signal (CW) is transmitted along this air isolated “coaxial cable” RF loops inside the tube. Loop currents determines the wire position Conductive wire is stretched (140 m) inside a conductive tube (8 mm) RF Signal (CW) is transmitted along this air isolated “coaxial cable” RF loops inside the tube. Loop currents determines the wire position Pipe ½ filled with water. Water surface used as common reference Capacitive sensors measure the distances to this common reference Ultrasonic sensor detects distance of surface to under water plains Pipe ½ filled with water. Water surface used as common reference Capacitive sensors measure the distances to this common reference Ultrasonic sensor detects distance of surface to under water plains Reminder

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM measures: X & Y- Positions relative to two stretched wires HLS measures: Y - Positions relative to the water surface Common Task: X & Y Positon monitoring of U-Segments Resolution: < Micrometer Data rate:Every few minutes Operation: Continously, no drifts 1400 mm WPM & HLS will operate as one Alignment Diagnostic System, ADS Reminder

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, Reminder ADS Position sensors at the girders LeftRight

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, ADS Sensors Left to right: Wire Position Monitor - Four loops with SMA con. Field distribution - 4 Loops around the wire WPM gap view - Gap = 8 x 8 mm Left to right: HLS Capacitive sensor - Shown, down side up HLS Pot & Sensor - Pot with pipe adapter - Bracket to the girder - Sensor on top, ready to go

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, HLS Hardware Water pipes and pots Bellows Ultrasonic sensor Capacitive sensor Water pipe inside girder

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, HLS Hardware Integration of LTU beam line monitorsWater refill station Undulator HLS Sensors HLS Pipe Beam dump LTU beam line WPM End station Top view HLS Sensors HLS Pipe Beam dump LTU beam line WPM End station Undulator

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM Hardware Monitors at a short break sectionWire tube support system

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM Hardware Monitor cabling Electronics sub-stationWire position monitorMonitor signal cabling Signal cabling

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM Hardware Wire End Station < Wire terminals < Aluminum supports Anocast stands (Granite + Epoxy) Wire vibration needs to be minimized! First harmonic frequency ~ 0.5 Hz Coupling to the ground is crucial…

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, HLS Status Hardware Level sensors 100% completed Tube system90% completed Network & cables80% completed Sensor calibration70% completed Hardware Level sensors 100% completed Tube system90% completed Network & cables80% completed Sensor calibration70% completed Software Interface with sensors completed and tested Interface with LCLS controls defined and tested Data exchange between data dump and analysis computer tested Data analysis theory defined, but not coded Software Interface with sensors completed and tested Interface with LCLS controls defined and tested Data exchange between data dump and analysis computer tested Data analysis theory defined, but not coded

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM Status Wire tube support system100% completed Local computers & ADC Interfaces100% completed Monitor signal cable assemblies 100% completed Wire end stations & terminals90 % completed Wire position monitors90% completed Wire tubes & tube connections90% completed Local electronics stations 80% completed Signal processing & Data acquisition70% completed Software, Application & Analysis50 % completed Wire tube support system100% completed Local computers & ADC Interfaces100% completed Monitor signal cable assemblies 100% completed Wire end stations & terminals90 % completed Wire position monitors90% completed Wire tubes & tube connections90% completed Local electronics stations 80% completed Signal processing & Data acquisition70% completed Software, Application & Analysis50 % completed

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, ADS Schedule Water tube system comes assembled with girders, installationJune to 25/10/08 Installation of sensors and cable connectionsJuly to 25/10/08 HLS will be commissioned partly in sections of some girder July to November Commissioning of entire HLS needs time after last girder is placed. Water tube system comes assembled with girders, installationJune to 25/10/08 Installation of sensors and cable connectionsJuly to 25/10/08 HLS will be commissioned partly in sections of some girder July to November Commissioning of entire HLS needs time after last girder is placed. HLS Girders has to be in place, before wire tube installation can start June to 25/10/08 Installation of substations and cabling can be done any timeJuly to 25/10/08 Due to stretched wires are needed, commissioning starts November 08 Pre-checks of the system will minimize, but not wipe out time for commissioning. Girders has to be in place, before wire tube installation can start June to 25/10/08 Installation of substations and cabling can be done any timeJuly to 25/10/08 Due to stretched wires are needed, commissioning starts November 08 Pre-checks of the system will minimize, but not wipe out time for commissioning. WPM In general Schedule needs to be synchronized with installation of the Undulator Segments

Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, End of Presentation