City of Corvallis – 4 elementary schools: (1) Hoover Elementary School (2) Garfield Elementary School (3) Jefferson Elementary School (4) Lincoln Elementary.

Slides:



Advertisements
Similar presentations
Gadsden City High School Construction Progress. Gadsden City High School March 30, 2005.
Advertisements

City of Madras – Madras Elementary/Buff Elementary School: Sidewalk construction, crosswalk improvements, and safety.
City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy
City of Canby Safe Routes To School – 6 schools: ( 1) Howard Eccles Elementary School (2) William Knight Elementary School (3) Philander Lee Elementary.
City of Umatilla – McNary Heights Elementary / Clara Brownell Middle School Sidewalk/curb extension/pathway/bus driveway construction; crosswalk/lighting.
Portland Bureau of Transportation Lent Elementary/Mill Park Elementary School.
Road Diets and Roundabouts
Who we are these people? Gabriela Vega – Transportation Planner, DDOT/PPSA George Branyan – Pedestrian Program Coordinator, DDOT/PPSA Trey Dickerson –
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Goodwood Property Owners’ Association
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Examples of Context Sensitive Solutions in an Urban Environment ITD Project Development Conference April 7, 2005 Doug Camenisch, P.E. Parametrix.
Capital Improvement Program City of Warren, Ohio April 2012.
Parking Stadium Dr. Middle Dixon Cedar Blvd Wildcat Bleachers Dixon Park Fields.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
38 th Street to Kessler Boulevard Traffic Engineering Review Summary For Historic Midtown Initiative (HARMONI) By HNTB Corporation June, 2010.
ZHA Zimmerman / Volk Associates, Inc. Martin / Alexiou / Bryson, Inc. Recommendation Six Re-Configure Street Sections to Accommodate On-Street Parallel.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Slide 1. Slide 2 Introduction How did you get to school as a child?
Parallel and perpendicular. Parallel lines do not ever cross.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
City of Evansville and Vanderburgh County Intersection Crash Analysis.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
2.75 Miles Route A 2.75 Miles Route A Presidential SP Quarter mile markers are marked with orange circles at the locations designated
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office.
With Pictures.  Bus Bus Schedule CarBike BicycleTruck.
Vocabulary for Envelope Addressing Copyright 2015 Donna Barr All rights reserved by author
Agreement with Town of Tioga, LLC. Total Cost Estimate: $6,420,000 Total Estimate for Agreement Portion: $3,700,000 Developer responsible for 9.7% of.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
LearnZillion Notes: --This is your hook. Start with a question to draw the student in. We want that student saying, “huh, how do you do X?” Try to be specific.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
SAFE ROUTES TO SCHOOL: INFRASTRUCTURE DESIGN TO CONSTRUCTION.
The Prater Company st Avenue NE Fayette, AL
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works.
No Parking Drop & Go Only - No Parking No Parking No Parking on Grass Median No Parking No Parking with 10 Feet of Fire Hydrant Brookside Elementary School:
City of Belmont Pavement Reconstruction Project October 15, 2014.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
Integrity Innovation Accountability Commitment to Excellence Teamwork Values Item 5O Approve the proposed sidewalk projects for construction using FY
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
BIKE WALK CIVICS KING STREET NEIGHBORHOOD GREENWAY PILOT March 9, 2017.
City of Gresham – Hauton B
Area (Name MUST be on list)
Sherwood Drive Wolfville
ELM AVENUE STREETSCAPE & SAFETY IMPROVEMENTS (University Parks Dr
Adoption of the FY Capital Improvement Program Budget & Amendments to FY 17 CIP May 8, 2017.
Citrus Park Drive Extension
Transportation Projects
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Project Scope of Work Project Contacts
Bike Boulevard 4.6 miles of bike lanes, bike dots, shared lane markings and guide signs on collector and local streets. March-April 2012.
PROJ. 566(17) LOR PID MAJOR WIDENING
Adoption of the FY Capital Improvement Program Budget
Lincoln Common Redevelopment Construction Update.
City Council March 18, 2014.
State Aid Standards Development
April 25, 2016 Randy Mabson, Program Coordinator
Meadow Lake Boulevard Street Extension Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
DDOT Western Avenue, NW Project
St. Andrews Agenda Item 11.A & 11.B
Presentation transcript:

City of Corvallis – 4 elementary schools: (1) Hoover Elementary School (2) Garfield Elementary School (3) Jefferson Elementary School (4) Lincoln Elementary School

City of Corvallis – Garfield Elementary School Intersection Garfield Avenue/12 th Street Curb extension Garfield Avenue 12 th Street

City of Corvallis – Garfield Elementary School Intersection NW Highland Drive/NW Garfield Avenue Curb extensions on 3 sides of intersection NW Garfield Avenue NW Highland Drive

City of Corvallis – Hoover Elementary School Intersection Walnut Boulevard/Glenridge Drive Sidewalk Construction Walnut Boulevard Glenridge Drive

City of Corvallis – Jefferson Elementary School Intersection NW Circle Boulevard/NW 27 th Street Curb extension NW Circle Blvd NW 27 th St

City of Corvallis – Jefferson Elementary School NW Circle Boulevard Speed Feedback Sign Installation