Previously Evaluated Alternatives Out of Corridor October 2005.

Slides:



Advertisements
Similar presentations
Routing Routing in an internetwork is the process of directing the transmission of data across two connected networks. Bridges seem to do this function.
Advertisements

Joint PDT/CAC Meeting June 16, 2010 Citizens Advisory Committee Project Development Team OR 62 Corridor Project Date: Wednesday, June 16 th 2010 Time:
City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June , Santa Barbara, CA SR 46 Improvement PSR/PDS Study.
Great Western Corridor Feasibility Study
What are these?. What is this? What are these?
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
U.S Aerial View of construction Distant shot of Intersection of Hwy 71/20.
January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 Riverside County - Orange County.
Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator.
CITY OF LEANDER June 10, 2013 Williamson County Bond Projects Requests.
May 5, 2014 Connected Corridors I-210 Pilot Project City of Pasadena City Council.
Environmental Assessment Public Meeting
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Welcome to El Dorado Hills. Goals of Presentation Summarize growth, traffic, and road network state affecting planning in EDH - Especially where not easily.
> >
1 times table 2 times table 3 times table 4 times table 5 times table
River to Sea TPO CAC A Presentation to: May 19, 2015.
Interlocal Agreement – Transportation Impact Fees City Council Workshop July 9, 2013.
HSL Helsinki Region Transport Local Rail Projects in Finland Arttu Kuukankorpi Head of Route Network and Timetable Planning Group.
Florida Gas Transmission Section #1 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Compressor Station 30 (Plant City West) to Main Line.
Current Construction Projects Major Projects Pinellas County.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
November 5, 2010 ITSO Trans Talk Vern Swing, P.E. & Steve Manhart, P.E., PTOE, PTP November 5, University of Minnesota DIVERGING DIAMOND INTERCHANGE.
Driving Directions You may take 470 northbound, just after exiting the airport (see map), and follow it northwesterly 18.5 miles to I-25. User without.
Cape Fear Skyway STIP Project No. U-4738 Federal Aid Project No. STP-0017(53) WBS No New Hanover and Brunswick Counties, North Carolina October.
RPS Modeling Results Presentation to RPS Policy Committee Brian Gregor Transportation Planning Analysis Unit June 6,
Area Between Curves. Area Between Curves With a few modifications, we can extend the application of definite integrals from the area under a curve to.
Tennessee Statewide Model Subarea Model Development and Analysis Tennessee Model Users Group Meeting October 24, 2007 Presented by: Dean Munn Senior Transportation.
City of Palm Coast Northeast Corridor Projects. Northeast Corridor - Project Status Palm Coast Parkway Matanzas Woods Parkway Palm Harbor Parkway Extension.
8/7/02 Dane County Vandewalle & Associates Strand Associates William O’Connor Roadway Concept Select Link Traffic Modeling August 7, 2002.
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
Presentation to Traffic Working Group February 6, 2014.
2040 Long Range Transportation Plan for River to Sea TPO CAC and TCC Meetings May 19, 2015.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
Transpo 2012 Yan Xiao, Mohammed Hadi, Maria Lucia Rojas Lehman Center for Transportation Research Department of Civil and Environmental Engineering Florida.
Tables Learning Support
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Role in a Livable Community April 5,  Over it’s 40 year history, RVTD has seen service grow in the first 20 years and steady decreases over the.
CPPJ Meeting January 27, 2014 Project Team. Lake Charles MPO - Calcasieu Parish Chapters: 1.Introduction and Transportation Planning Process 2.Regional.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
A Position Statement 14th October 2016
Times Tables.
A Presentation to: River to Sea TPO Board May 27, 2015.
Guelph – Wellington – Waterloo Regional Road Network
Bi-County Parkway Evaluation of Impacts on Fairfax County Roads
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
4 × 6 = 24 8 × 6 = 48 7 × 6 = CONNECTIONS IN 6 × TABLE
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
Stockton City Council December 6, 2007 Land Use Diagram Changes
10 × 8 = 80 5 × 8 = 40 6 × 8 = CONNECTIONS IN 8 × TABLE MULTIPLICATION.
3 × 12 = 36 6 × 12 = 72 7 × 12 = CONNECTIONS IN 12 × TABLE
3 times tables.
6 times tables.
5 × 12 = × 12 = × 12 = CONNECTIONS IN 12 × TABLE MULTIPLICATION.
City of Edinburgh Council Transport & Environment Convener
5 × 9 = 45 6 × 9 = 54 7 × 9 = CONNECTIONS IN 9 × TABLE
3 × 7 = 21 6 × 7 = 42 7 × 7 = CONNECTIONS IN 7 × TABLE
Extended Registration KS3
Presentation transcript:

Previously Evaluated Alternatives Out of Corridor October 2005

Alt.DescriptionComments Meets P & N Further Study Scenario 3000 Hwy 140 ExtensionExtend Hwy 140 west to I-5s NO Scenario 3001 White City / Table Rock with Table Rock I-5 Interchange Improves Table Rock Rd with a new interchange at I-5 NO Scenario 3002 Hwy 140 Extension with N-S Roadway Improvements Extends Hwy 140 W to I-5; improves Table Rock Rd., Vilas Rd (east), Coker Butte & Foothills Pkwy. NO Scenario 3003 Hwy 140 Extension with N-S Roadway Improvements and Hwy 62 Connection to Biddle Same as #3002 with improved connections to Biddle Rd. NO Scenario 3004 I-5 Bypass RouteRe-routes I-5 east of Hwy 62 NO Out of Corridor Alternatives