City of Hubbard Transportation System Plan Update April 25, 2012.

Slides:



Advertisements
Similar presentations
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Advertisements

April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel.
ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
OR 22 – Greenwood Road to Doaks Ferry Road Expressway Management Plan.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
Missoula Planning Summit Milestone 14 August, 2008 Missoula, Montana.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
UATS Director’s Workshop Agenda April 30, 2001  Introduction (12:30 – 12:35)  Development Review and Mitigation (12:35 – 2:10) Break (2:10 – 2:15) 
2-10 ODOT Sign Policy and Guidelines for the State Highway System Ch. 6 – Construction and Maintenance Signs Oregon Department of Transportation Traffic-Roadway.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Publication No. FHWA-HRT Federal Highway Administration University Course on Bicycle and Pedestrian Transportation International Approaches to Bicycle.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Newport South Beach Peninsula Refinement Plan. Newport South Beach Peninsula Located on the south side of the mouth of the Yaquina Bay and the crossing.
City of Ashland Transportation System Plan Update September 6 th, 2012.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS PROPOSED HIGHWAY.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
2016 Cape Cod Regional Transportation Plan Development 16 MARCH 2015 CAPE COD METROPOLITAN PLANNING ORGANIZATION.
LOW CARBON TRANSIT OPERATIONS PROGRAM [SB 862 (2014)] DECEMBER 2014.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
2010 Wisconsin Safe Routes to School Funding SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.
Planning and Project Delivery in Lincoln City and Newport Presentation to the ODOT Planner’s Workshop October 2014.
Land Use Study for the Community of Winchester July 9, 2012.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
STA Safety Project PID #76439 December 12, 2006.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
Informing the Business Case The Woodburn Interchange ODOT Fall Forum 2015 Presented by: Terry Cole, Region 2 Lead Planner October 8, 2015.
Mobility Strategy Update Work Session November 17, 2009 Mobility Strategy Update Work Session November 17, 2009.
Trade Transportation Activities Report Bill Frawley, TTI 2012 Border to Border Transportation Conference South Padre Island, TX November 14, 2012.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
Proposed Additions to MUTCD. Chapter 8E. Busway Grade Crossings Proposed revision submitted to FHWA in June Intended for next edition of MUTCD.
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
 Connect the Coastside Presentation Half Moon Bay City Council Briefing March 15,
Public Hearings D10, E11, F12 March 26, Today’s Public Hearings D C-TRAN-2 Comprehensive Plan amendment adoption E C-TRAN-1 Comprehensive.
TRAFFIC CONTROL ORDERS DOWNTOWN MIDLAND January 23, 2017
City of New Braunfels Regional Transportation Planning Garry Ford, P.E., PTOE City Engineer June 13, 2017.
Transportation Improvement Plan (TIP) Project Solicitation
32 Transportation Midway City 2016 General Plan
City of Delavan 2017 Budget.
Project Management Team Meeting #3
MASTER THOROUGHFARE PLAN AND STREET DEVELOPMENT STANDARDS
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
Finance Committee & City Council August 8, 2016
Draft Transportation Element September 6, 2017
San Mateo Countywide Transportation Plan update
SANDY SPRINGS CITY COUNCIL MEETING
Transportation System Development Charge Working Group
Josephine County TSP Update
Proposed Driscoll Expansion Brookline, Massachusetts
Design Standards.
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
Presentation transcript:

City of Hubbard Transportation System Plan Update April 25, 2012

Project Overview & Financially Constrained Project List

Summary of Deficiencies 1999 TSP does not address UGB expansion areas Many streets dont meet existing design standards Railroad crossing issues High crash rates on OR 99E Three intersections do not meet ODOT standards in the 2035 No-Build Scenario Meets performance target Does not meet target

Recommended Alternative Improvements Includes all pedestrian and bike projects identified in TM#3 (not cost constrained) Refined cost estimates (including right-of-way)

Summary of OR 99E Alternatives 1.Extend the 3-lane cross section –D Street and G Street intersections dont meet standards –Queues exceed available storage at D Street, G Street, and J Street 2.Extend the 3-lane cross section & add signal at G Street –Signal warrants and spacing standards not met 3.Construct a 5-lane cross section throughout Hubbard –All intersections meet standards and no queuing issues –Inadequate right-of-way and funding 4.Extend the 3-lane section. Construct 5-lanes between D & G –All intersections meet standards and no queuing issues 5.Extend 3-lane section. Construct southbound right- turn/through lane between A & J Street. –All intersections meet standards and no queuing issues

Financially Constrained Alternative - Roads Interim improvements needed to meet ODOT mobility standard

Financially Constrained Alternative - Bikes Survey results –Mixed support for bicycle facilities –Bike lanes on OR 99E are a priority Removed all bike projects except Highway 99E bike lanes to free funds for sidewalk improvements

Financially Constrained Alternative - Sidewalks OR 99E, D Street, 3 rd Street sidewalks 7 th Street, G Street, J Street, and 5 th Street sidewalks Mill Creek Trail OR 99E crossing improvements at A Street –State Traffic Engineer approval needed once part of funded project Railroad crossing improvements –Engineering study to assess grade issues –Construct sidewalks on both sides of road (5 feet from signal arms) –Potential additional costs based on study results and coordination with ODOT Rail and Union Pacific

Financially Constrained Alternative - Sidewalks

Policy and Code Amendments

Future Street Plan New collectors –G Street –10 th Street –A Street –Dunn Road –Painter Loop –1999 TSP Loop Road –New UGB Streets Local street grid in UGB expansion areas

Proposed Street Design Standards (Reflects Downtown Revitalization Plan Recommendations)

Proposed Street Design Standards (Reflects Downtown Revitalization Plan Recommendations) (Same as Existing Standard)

Proposed Street Design Standards

Example Crossover Easement Process

Transportation Financing Program

Financially Constrained Alternative Forecast Funding Amount (primarily non-discretionary formula, grant, and SDC funding)

Proposed TSDC Policy Changes Add Bicycle and Pedestrian Facilities to the TSDC Use Person Trip and Vehicle Trip Factors Maintain Similar Method of Allocating TSDCs among Res. And Non-Res. Land Use Types (as in Prior Methodology) Keep Current Exemption Policies & Escalation Policies Unchanged