Project Our group collaborated with students at the University of Zacatecas (UAZ) to accomplish the following: 1- Create an accurate hydrologic model which.

Slides:



Advertisements
Similar presentations
Hydrology Rainfall - Runoff Modeling (I)
Advertisements

Runoff Analysis of the Watersheds “El Arroyo El Chilito” and “La Presa Bernardez” Guadalupe, Zacatecas, Mexico Nathan Lowe, Shawn Stanley and Jeffery Crump.
CHARACTERISTICS OF RUNOFF
Introduction to Surface Water Hydrology and Watersheds Lecture 1 Philip B. Bedient Rice University November, 2000.
Forest Hydrology: Lect. 18
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Hydrologic Theory One of the principal objectives in hydrology is to transform rainfall that has fallen over a watershed area into flows to be expected.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Analysis of Hydrographs
Upper Brushy Creek Flood Study – Flood mapping and management Rainfall depths were derived using USGS SIR , Atlas of Depth Duration Frequency.
CURVE NO. DEVELOPMENT STEP 8 Soils data, land use data, watershed data, and CN lookup table are used to develop curve numbers for use in the SCS Curve.
PrePro2004: Comparison with Standard Hydrologic Modeling Procedures Rebecca Riggs April 29, 2005.
Application of HEC- HMS for Hydrologic Studies Texas A&M University Department of Civil Engineering CVEN689 – Applications of GIS in CE Instructor: Dr.
By Jennifer VerWest. Differences between Flat and Average/Steep Terrain Flat Terrain Steep/Average Terrain.
Application of GIS Tools for Hydraulic Modeling
The Hydrologic (Water) Cycle. Surface Water Oceans Rivers and streams Lakes and ponds Springs – groundwater becomes surface water.
Hydrologic/Watershed Modeling Glenn Tootle, P.E. Department of Civil and Environmental Engineering University of Nevada, Las Vegas
Texas A&M University Department of Civil Engineering Cven689 – CE Applications of GIS Instructor: Dr. Francisco Olivera Logan Burton April 29, 2003 Application.
Urban Storm-Water Management Plan Utilizing Arc View and HEC-HMS College Station, Texas Kara Corcoran CVEN 689.
Analyses of Rainfall Hydrology and Water Resources RG744
FNR 402 – Forest Watershed Management
Hydrologic Cycle. Hydrologic Cycle Processes Surface Water Soil water Atmospheric water Groundwater Processes Precipitation Evaporation Surface Runoff.
Upper Brushy Creek Water Control & Improvement District
WinTR-20 SensitivityMarch WinTR-20 Sensitivity to Input Parameters.
August 20th, CONTENT 1. Introduction 2. Data and Characteristics 3. Flood analysis 1. MOUSE 2. SOBEK 3. ARC-SWAT 4. Conclusions and suggestions.
ArcHydro – Two Components Hydrologic  Data Model  Toolset Credit – David R. Maidment University of Texas at Austin.
by David M. Beekman and Vito A. Cimino
Flood Map Modernization and North Dakota Julie Prescott, ND Map Modernization Coordinator North Dakota State Water Commission And Brian Fischer, CFM, GIS.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
1 Integrating Water Resources Engineering and Geographic Information Systems (GIS) National Weather Service NWSRFS International Workshop October 21-23,
Map-Based Flood Hydrology and Hydraulics David R. Maidment Jan 10, 1998.
Long Valley Creek: A Rainfall-Runoff Modeling Story Rob Thompson Hydrologist U.S. Army Corps of Engineers Sacramento District
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Update to the 1992 Dry Creek Watershed Flood Control Plan CESI/RBF RR/KM FEMA CTP HYDROLOGY.
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Runoff Overview Tom Hopson.
Impacts of Landuse Management and Climate Change on Landslides Susceptibility over the Olympic Peninsula of Washington State Muhammad Barik and Jennifer.
Rio Grande Rectification Reach FLO-2D Model Development Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council Project.
The Effects of Impervious Cover on a Hydrologic System BRUSHY CREEK WATERSHED By Ruth Haberman.
1 Byung Sik, Kim Kangwon National University Advanced Hydrology and Water Resources Management.
RACC High School Training June 26, 2012 Jody Stryker University of Vermont Introduction to Watershed Hydrology.
Hydrology & Water Resources Engineering ( )
SDME preparation Jan 2012 A Damming report- why are some strategies for flood management more sustainable than others? Rivers Revision.
CTC 260 Hydrology Introduction
Construction Analysis Hydrographs
Nathan Lowe, Shawn Stanley and Jeffery Crump
Prepared by: Sulyman Khraishe Madhat Z
Cristina Nelson, Term Project, CEE 6440, Fall 2007
Lesson four: Hydrographs
The Drainage Basin System
GEM 4409 Hydrology Fall 2005 TROY UNIVERSITY.
Map-Based Hydrology and Hydraulics
Warm-up What are four things that impact INFILTRATION? (the answer is in your notes) After you finish the warm-up put your river basin project in the inbox.
Hydrologic Simulation Models
Analysis of Hydrographs
Hydrologic River Routing
Hydrology.
Regional Hydraulic Model for the City of Austin
Hydrology and drainage
CTC 260 Hydrology Introduction
Weekly lesson objectives
Love Field Modernization Program
Today we are learning this content:
Presentation transcript:

Project Our group collaborated with students at the University of Zacatecas (UAZ) to accomplish the following: 1- Create an accurate hydrologic model which predicts the depth of flooding in the stream Barrio del Refugio. 2- Design a flood control structure to mitigate the flooding. Trancoso Watershed Model/Flood Protection Project Trancoso Watershed Model/Flood Protection Project Problem In recent years, the community of Trancoso, Zacatecas has suffered flooding problems, particularly in the stream Barrio del Refugio. The flooding occurs 2 to 3 times per year at a level high enough to enter the nearby homes. The flood waters present an evironmental engineering problem, as the water is contaminated by sewage and negatively affects public health and safety. Return Period (years) Precipitation (in) Peak Flow (cfs) Time to Peak (hours) Volume (ac-ft) Figure 1. A resident indicates the high water mark from a recent flood event on Barrio del Refugio. Methods ● The hydrologic model was performed using the Army Corps of Engineers’ software HEC-1. ● Spatial data sets such as elevations, land use, and soil type, were provided by the University of Zacatecas and were formated using the Watershed Modeling System software. ● Design storms of various intensities were calculated using the Weibull statistical method. ● The results from the HEC-1 model were used as input into the Army Corps of Engineers’ hydraulic modeling program HEC-RAS to calculate flood water depths. ● HEC-RAS was then used to design a channel capable of containing the flood from the 25-year storm. Sub-Basin 1 Detention Basin Start of Flooding Sub-Basin 2 Sub-Basin 3 Figure 2. Delineated Trancoso Watershed showing important locations. Results The hydrograph shown in Figure 3 represents runoff at the start of the flooded area for the 50, 25, 10, and 5 year storms. The first peak represents runoff from Sub-Basin 2. The second peak from represents water from the overtopping of the detention basin. As illustrated in the hydrograph, the detention basin overtops during the 50 and 25 year storms, but not during the 10 or 5 year storms. Table 1 summarizes the results of the hydrologic model. Figure 3. Runoff hydrograph at the start of the flooding. The first peak represents runoff from Sub-Basin 2. The second peak represents runoff that has overtopped the detention basin located between Sub-Basins 1 and 2. Table 1. Results of Hydrologic Study.

Hydraulic Model Results The following figure shows the level of the flood waters given a 5, 10, 25, and 50 year storm at peak flow. As seen, the 50 years storm experiences flood water depths as high as 2.5 meters. The surface was generated using survey data. In most places, the channel is 20 to 30 meters wide, though in a few places it is smaller. Channel Design A channel was designed to contain the peak flow from the 25-year storm. Multiple channel sizes, shapes, and slopes were run through HEC-RAS to find a preferred channel design. Engineering Disciplines This project included the following engineering discplines: 1- Water Resorces. Calculating the quantity of water of the flood water depths. 2- Geotechnical. Reading soils maps that indicate soil composition and assigning a corresponding hydrologic soil type. 3- Transportation. The current wash is used as a pedestrian walkway. The proposed channel leaves enough room on both sides of the channel to allow pedestrian passage. Realistic Constraints This project included the following constraints: 1- Economic. The Mexican city of Trancoso does not have much funding for civil engineering projects. A more complete solution, including a second detention basin at the start of the flooding zone, is not feasible, because of the high cost of re-routing roads or removing buildings. 2- Social/Cultural. The homes on either side of the channel are in the 5-year floodplain. The most effective way to mitigate such a flooding problem would be to exercise eminent domain to buy the homes then relocate the residents. The homes are of low quality and are already badly damaged by reoccuring floods. This option, though logical, did not fit within the social/cultural constraints of Mexico. One Mexican government disaster responder expalined that if the government relocates the people to new houses, the people would sell them and move back to the old abandoned houses near the dry stream. For this reason, our design solution could not relocate a single home. Elevation (m) Channel Distance (m) Station (m) 0 Elevation (m) Trancoso Watershed Model/Flood Protection Project Trancoso Watershed Model/Flood Protection Project