Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.

Slides:



Advertisements
Similar presentations
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Advertisements

Joint PDT/CAC Meeting June 16, 2010 Citizens Advisory Committee Project Development Team OR 62 Corridor Project Date: Wednesday, June 16 th 2010 Time:
ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
11 C E T A S Preferred Alternative Presentation April 4, 2013 OR 62 I-5 to Dutton Road City of Medford, Jackson County Key #:
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee October 3, 2007 Workshop.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
1 March 14, 2013YMPO RTP Technical Advisory Committee Meeting.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
New I-65 Interchange at Worthsville Road Welcome!.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
December 13, 2010 Developing Bicycle Performance Measures for Integrated Multi-Modal Corridor Management.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
The US 101 Mobility Study will -  Examine current and future conditions, identify key deficiency areas and propose multi-modal improvement packages along.
Public Open House February 6, Study Overview - Study Area South North.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
Elk Grove – Rancho Cordova – El Dorado Connector Project Elk Grove – Ranch Cordova – El Dorado Connector Joint Powers Authority Project Briefing JPA Board.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
2016 Cape Cod Regional Transportation Plan Development 16 MARCH 2015 CAPE COD METROPOLITAN PLANNING ORGANIZATION.
Improving Your World. RS&H tradition began in 1941 Employee-owned company Six programs of client-focused services Multi-disciplined team of planners,
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
The purpose is to explore methods to improve the safety, capacity, and mobility of Falling Springs Boulevard, US 60, and adjoining roads.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
PALM BEACHCOUNTY PALM BEACH COUNTYFLORIDAWhere “TRANSPORTATION MATTERS” PALM BEACHCOUNTY PALM BEACH COUNTYFLORIDAWhere “TRANSPORTATION MATTERS”
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
On the Road to a New Metropolitan Transportation Plan Spokane Regional Health District Board of Health April 25, 2013.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
Andrew Winga, P.E. – WisDOT Project Manager.  Background on numerous Transportation Studies  What is a Planning & Environment Linkage Study  Problem.
Amherst County Comprehensive Plan (Update)
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
Anchorage Metropolitan Area Transportation Solutions Freight Advisory Committee (FAC) Freight and Land Use: Making the Connection December 15, 2010 Ms.
Connector Ahead Capital SouthEast Connector Project Sheldon/Wilton Community Workshop #3
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
Safety-Based Deployment Assistance for Location of V2I Applications Carol Tan, FHWA and Kim Eccles, VHB Traffic Records Forum, 2015.
Presented to presented by New Mexico Transportation Planning Partners 2040 New Mexico Statewide Long-Range Multi-Modal Transportation Plan New Mexico Department.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
INTEGRATING ASSESSMENT OF THE ECONOMIC BENEFITS OF TRANSPORTATION IMPROVEMENTS IN PROJECT-LEVEL ALTERNATIVES ANALYSIS Meiwu An, Pikes Peak Area Council.
Unit 2 DEVELOPMENT OF THE LONG RANGE TRANSPORTATION PLAN (LRTP) LCTCC Educational Program.
Planning and Environmental Linkages MPO/COG Conference February 24, 2016.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Unit 1 THE TRANSPORTATION PLANNING PROCESS AND THE ROLE OF THE MPO LCTCC Educational Program.
Alternative Alignments Public Meeting
Chelan County Transportation Element Update
Willow Meadows Civic Club Meeting September 13, 2011
Technical and Public Advisory Committee Meeting #3
Draft Transportation Element September 6, 2017
San Mateo Countywide Transportation Plan update
Presentation transcript:

Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013

Oregon 62: I-5 to Dutton Rd. (Medford) Objectives Provide an overview of work to date Explain the process and alternatives that were consider in DEIS Show a summary of project impacts Share next steps

Oregon 62: I-5 to Dutton Rd. (Medford) Study Area The project study area is a 7.9-mile corridor extending from I-5 through White City Oregon 62

Oregon 62: I-5 to Dutton Rd. (Medford) Project Purpose The purpose of the proposed action is to: Improve transportation mobility and safety in the OR62 corridor; Simplify transportation system connections; Identify potential improvements for non-highway modes; and Maintain the regional economic role of the OR62 corridor.

Oregon 62: I-5 to Dutton Rd. (Medford) Project Need DEFICIENT ROADWAY SYSTEM Confusing road system connections Lacks hierarchy of connections that aids through travelers in finding their way. COORIDOR CONGESTION Existing congestion is high and projected to worsen in the future. 4 of 9 signalized intersections exceed performance targets currently By 2035, 8 of 9 signalized intersections will exceed targets SAFETY High crash rates Multiple Top 5 and 10% SPIS Locations Limited and deficient pedestrian, bicycle and transit infrastructure/service

Oregon 62: I-5 to Dutton Rd. (Medford) Decision-Making Process Project Decision Needed CAC, using input from public and staff, makes a recommendation to PDT PDT, after considering all input, decides whether to act on the CAC recommendation Staff provides technical input Community (general public, local jurisdictions, businesses, and others) provides valuable input If PDT doesn't act on CAC recommendation, more information is gathered and the process is repeated OR PDT decision is recorded

Oregon 62: I-5 to Dutton Rd. (Medford) Decision-Making Process Project Development Team (PDT) A team that includes City, County, State and Federal technical members, local stakeholders and development staff. Represent disciplines such as environmental, planning, freight, traffic analysis, regional issues, as well as. Responsible for project management decisions, technical quality of the project and assisting in the successful development of the project. Represent the best interests of the public at large. Provides overall strategy and direction to the project.

Oregon 62: I-5 to Dutton Rd. (Medford) Decision-Making Process (cont.) Citizen Advisory Committee (CAC) Includes concerned citizens from the general project area, including highway users, property and business owners. Represents disciplines such as bicyclists, pedestrians, transit, agriculture, environmental issues and other interests. Serves as a forum and community sounding board for the project. Advises the PDT to ensure that the interests, issues, knowledge and recommendations of the local community are considered in project decisions.

Oregon 62: I-5 to Dutton Rd. (Medford) NEPA Process The National Environmental Policy Act (NEPA) We are here

Oregon 62: I-5 to Dutton Rd. (Medford) How do People Use Oregon 62? Roughly 40% of the vehicles on OR 62 are traveling through the corridor The other 60% of the vehicles have either an origin or a destination within the corridor CONCLUSION: Any plan to reduce congestion in the OR 62 corridor will have to include easy access to the businesses AND a limited-access expressway for efficient through- traffic movement. Medford White City Highway 62

Oregon 62: I-5 to Dutton Rd. (Medford) Reduced Range of Alternatives Bypass Bypass with Split Diamond Interchange at I-5 Existing Highway Build Texas Turnaround

Oregon 62: I-5 to Dutton Rd. (Medford) Bypass Alternative Vilas Road Current Hwy 62 Medford Airport Delta Waters White City Agate Road Poplar is grade-separated N

Oregon 62: I-5 to Dutton Rd. (Medford) Bypass with Split Diamond

Oregon 62: I-5 to Dutton Rd. (Medford) Existing Highway Build Current Highway Cross-Section Proposed Alternative Cross-Section

Oregon 62: I-5 to Dutton Rd. (Medford) Texas Turnaround Alternative Current Highway Cross-Section Texas Turnaround Cross-Section

Oregon 62: I-5 to Dutton Rd. (Medford) Alternatives in DEIS Split Diamond Interchange at I-5 SD Alternative Directional Interchange at I-5 DI Alternative Design Options A, B and C

Oregon 62: I-5 to Dutton Rd. (Medford) Preferred Alternative: SD Interchange with Design Option C

Oregon 62: I-5 to Dutton Rd. (Medford) JTA Phase Jobs and Transportation Act - $100 M

Oregon 62: I-5 to Dutton Rd. (Medford) (info here on JTA + impacts) ie: travel time reduction using bypass) vpool mitigation site? traffic circulation (see next two slides for N.and S. terminus areas)

Oregon 62: I-5 to Dutton Rd. (Medford) JTA Phase - Southern Terminus

Oregon 62: I-5 to Dutton Rd. (Medford) JTA Phase – Northern Terminus

Oregon 62: I-5 to Dutton Rd. (Medford) Floodplains

Oregon 62: I-5 to Dutton Rd. (Medford) Floodplains contd. Researched existing stream conditions through aerial photos and site surveys Had aerial photos taken during larger storm events this past winter to aid in HEC-RAS analysis calibration Completed a HEC-RAS analysis of existing stream conditions to aid in design Install Box Culverts to provide fish passage which meets state and federal fish passage standards Current design meets FEMA standards for No Significant Impacts to existing flood elevations

Oregon 62: I-5 to Dutton Rd. (Medford) Swanson South HEC-RAS Model Hydraulic Summary Existing ConditionsProposed Conditions Design FloodBase Flood Max. Probable FloodDesign FloodBase Flood Max. Probable Flood Discharge (ft 3 /s) recurrence Interval (yrs) Approach Section W.S. Elevation (ft) Backwater (ft) Downstream Section W.S. Elevation (ft) Average Velocity at Downstream (ft/s)

Oregon 62: I-5 to Dutton Rd. (Medford) Whetstone HEC-RAS Model Hydraulic Summary Existing ConditionsProposed Conditions Design FloodBase Flood Max. Probable FloodDesign FloodBase Flood Max. Probable Flood Discharge (ft 3 /s) recurrence Interval (yrs) Approach Section W.S. Elevation (ft) Backwater (ft) Downstream Section W.S. Elevation (ft) Average Velocity at Downstream (ft/s)

Oregon 62: I-5 to Dutton Rd. (Medford) Next Steps May 2013: Publish FEIS/Record of Decision (ROD) August 2013:Permits/Approvals March 2014:Phase 1 JTA Phase Bid Date February 2016:Phase 2 JTA Phase Bid Date