Status Current machining capacity = 2700 pieces per week: Casting capacity = 2375 pieces per week Current Ford demand is 2734 which exceeds the current.

Slides:



Advertisements
Similar presentations
Pull System Workshop THE GOAL: Directly link all processes - from the customer back to raw material suppliers - to improve responsiveness, shorten lead.
Advertisements

FY12 Expenditures and Caseload Update Fiscal Committee September 10, 2012.
Right the st 1 Time! Pacific Steel Casting Company Est
Chapter 11 Strategic Capacity Management
MBA 570 Summer How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities.
Calibration Stand Update
Status of MODIS Production (C4/C5 Testing) Mike Teague 1/5/06.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Phases of the Business Cycle
Strategic Capacity Planning Prepared by Bhakti Joshi June 20, 2014.
Short-Term Scheduling
Operations Management Just-in-Time Systems Supplement 12
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Operations Planning Horizons
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Business Plug-in B8 SUPPLY CHAIN MANAGEMENT.
Who is Caterpillar? Cat Dealers Cat Business Units World’s leading manufacturer of construction & mining equipment; diesel & natural gas engines; and industrial.
2006 Palisade User ConferenceNovember 14 th, 2006 Inventory Optimization of Seasonal Products with.
Chamdor Plant Tungsten Street Plant Cobalt Street Plant Dedicated Welding And QC Facility Machine Shop THREE FOUNDRIES AND SUPPORTING PLANTS.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
Confidential S&OP March th March Confidential.
LEAN MANUFACTURING IMPLEMENTATION -- Lean Supply Chain
Master Scheduling Chapter 3.
FY14 Budget and Caseload Update Fiscal Committee March 3, 2014.
Summary Report Version th June Contents 2 1.Finances and Recovery Plan 1.Cash position /14 performance against plan 3.Cost run rate.
1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.
1 Slides used in class may be different from slides in student pack Chapter 11 Strategic Capacity Planning  Strategic Capacity Planning Defined  Capacity.
Replenishment. Pull It Scan It Capture It Send It Customer’s System Analyze Customer’s Needs Trigger Reorder Point Pull It Scan It Capture It Send It.
1 Purchasing Year End Presented by Donnita Thomas Revised April 19, 2012.
1 Given the following data, calculate forecasts for months April through June using a three- month moving average and an exponential smoothing forecast.
1 MTAC eVS®/PTS User Group Thursday November 10, 2011.
1 Dumex Malaysia Workshop 1 Finished Goods Inventory at Nilai FGS July 9, 2008.
Micro and Nano Characterization Facility Girish Kunte July 1 st 2014.
IE450 Models Relating Cycle-time, Throughput, WIP and Batch Sizes
For exact time – “At nine o´clock.” Meal times. – “ at breakfast.” Specific parts of the day.- “ at night” Some time expressions.- “ at the moment,
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
Tata McGraw CHAPTER 5 Strategic Capacity Management.
© BMA Inc All rights reserved. Decision Making.
P RODUCTION PLANNING What do we need to produce? Process Machinery & Equipment Labor Skills Material 1.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
The Business Cycle Using aggregate supply, aggregate demand, and GDP to measure an economy.
The following variables play a key role in the 3rd and 4th quarter hog outlook, and will largely determine whether a repeat of 1998 is in store. We will.
Chapter 3 Linear Programming Applications
FY14 Budget and Caseload Update Fiscal Committee April 7, 2014.
Estimates Training Financial Analysis & Accountability Branch May 2012.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
The Calendar.
TIM 270 Service Engineering and Management Lecture 6: Forecasting.
OPERATIONS MANAGEMENT Business Research and Service Institute LLC
Hit or Miss Classification
Chapter 4.
Massachusetts Department of Environmental Protection
LABOR SUPPLY / DEMAND ANALYSES
Capacity Planning.
Why Manufacturing Matters (in Thailand)
THE LABOR SUPPLY / DEMAND ANALYSES THE “HATRAK” APPROACH TO USING
Council of Governors Meeting
Introduction to Production Planning
Texas A&M Industrial Engineering
Capacity Planning.
Energy Intensive User Group Generation Maintenance Update
The Challenge Thermal Efficiency & Ventilation Air Vents (air bricks)
April May April May June July July June August Sept August
Sandip Sharma ERCOT Manager, Operations Planning
The Transformation of A Small Company Into A Golden Legend
UK Link Manual Update (UNC Modification 0613)
Manufacturing Throughput DI E2E Metal Prelam
Xoserve IX Refresh Customer Update 05/03/2019.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Revised Tender Timescale for DN Interruption Arrangements
F&A Meeting June 19, 2018.
Presentation transcript:

Status Current machining capacity = 2700 pieces per week: Casting capacity = 2375 pieces per week Current Ford demand is 2734 which exceeds the current contracted APW/MPW by 274/151 Week of April 27 th : Kings manufacturing plan = 2375 pieces versus Ford manufacturing plan of 2734: (-359 pieces ) April 27 th 28 th : 906 pieces produced versus a forecast of 750: (+21% / +156 pieces) April 29 th : 469 – 375 (+25% / +94) Explanation of Variance Recovery Plan Puma RWD Ladderframe– Kings Automotive UK SLIDE 1 of 4 Daily Average/ Week Daily Production ( One Month Look Ahead) April 30, 2015 Kings Manufacturing Plan Forecast Actual Ford Manufacturing Plan Production Plan: P818 APW/MPW 2460/2583

Status Kings Machining capacity = 6200 pieces per week: Casting capacity = 6000 pieces per week. Current Ford demand is 6347 which exceeds the current contracted APW/MPW by 523/224 Week of April 27 th : Kings manufacturing plan = 6000 pieces versus Ford manufacturing plan of 6347: (-347 pieces) April 27 th 28 th : 2074 pieces produced versus the Kings forecast of 1896: (+9% / +178 pieces) April 29 th : 1027 – 948 (+8% / +79) Explanation of Variance Recovery Plan Puma FWD Ladderframe– Kings Automotive UK SLIDE 2 of 4 Daily Average/ Week Daily Production ( One Month Look Ahead) April 30, 2015 Kings Manufacturing Plan Forecast Actual Ford Manufacturing Plan Production Plan: P818 APW/MPW 5824/6123

Status Plan for week April 27 th is 8375 which is 706 less than the Ford manufacturing plan (restricted by casting availability) April 27 th 28 th : 2980 pieces produced: versus Kings forecast of 2646: (12%/ +334) April 29 th : 1496 – 1323 (+13% / +173) Explanation of Weekly Variance Recovery Plan SLIDE 3 of 4 King Automotive Manufacturing Plan Forecast Actual Ford Manufacturing Plan: P818 APW/MPW):8284/8706 Date to Green MPW /07/15 April 30, 2015 Weekly Shipping Plan Puma FWD/RWD Ladderframe– Kings Automotive UK

Plan to Achieve: Action Plan to be update with a plan to achieve 10,375 MPW – July 30 th 2015 Puma 2.2L FWD/RWD Ladderframe– Kings Automotive UK Average weekly output FWD/RWD combined: APW/MPW7178/8285 vs MCPV APW/MPW :8284/8706 (based on last 6 weeks average performance) ActionLeadTimingIncremental Weekly Improvement ActualPlanned 1Additional 3 rd CNC added to Surrogate cellG Storr/ S Vaughan 8 th April Complete 250 2Production JMC RWD parts become available to ship to DEP End April – 300 parts week of 11 th May P Turton/R Mansfield 11 th May Kings identified external machinist (Shield Eng) to allow for maintenance at Kings to ensure installed capacity achieved P Reynolds / S Vaughan 18 th May Additional 4 th CNC to be added to Surrogate cellG Storr/ S Vaughan 25 th May Increase external casting capacity at LavendersG Storr/ S Vaughan 8 th May209 Castings 6Amtek Kidderminster (Panther facility) to install casting capacity for Puma R Carr / S Vaughan 1 st June July Castings 3000 Castings 7Additional weekend shifts to be worked at Amtek WithamL Hurley1 st June420 Castings 8Dedicated weekend machining shifts at KingsG Storr8 June288 9Use machines arriving for Panther to machine Puma Ladderframes in interim – pull forward timing if possible Kings/Ford20 July Sept Total Planned Actions Based On 5 Day Operating Pattern (APW)3350