The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority.

Slides:



Advertisements
Similar presentations
2.3 Waste Management – Revised IBTS
Advertisements

Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
CREW CAMP ENVIRONMENTAL REVIEW L. David Glatt, P.E. North Dakota Department of Health Environmental Health Section.
HURRICANE SANDY PASSAIC VALLEY SEWAGE COMMISSION AIR MONITORING PROJECT JEFF MEYER NORTHERN REGIONAL OFFICE AIR COMPLIANCE AND ENFORCEMENT.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Where does the sludge go? grams per person per day Sludge handling/disposal accounts for 25-50% of the cost –Sludge treatment:- Convert organics.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Bergen County Utilities Authority Little Ferry, NJ
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
WWT in Cromwell, Connecticut, USA The Mattabassett district wastewater treatment facility. By Stephen Schneider December 11, 2007.
AFFILIATED ENGINEERS, INC. THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON Presented to Houston Area Association of Hospital Engineering July.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Diesel Generator Reliability: Lessons Learned from Storms
Key Elements of a Safe Water Supply An Adequate and Protected Water Source A Secondary Supply A Quality Treatment System An Adequate Finished Water Storage.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
Do You Know Where Your Peak Flow Is?. - OR – Why Everyone Needs to Know About Blending Presented at BACWA Wet Weather Management Workshop May 28, 2008.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
LITTLETON/ENGLEWOOD DEWATERING FACILITY I N T R O D U C T I O N.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Water System Planning Study
Confined Space Rescue Most confined space fatalities are poorly trained rescuers…
Cheri Cousens, P.E. – Executive Director September 15, 2010.
1 Practical Tips to Emergency Preparedness John Dahlin CHT, CWS-1 Texas ESRD Emergency Coalition.
Module 7: Tank Farm and Bulk Storage Fire Incidents.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Pasadena Water and Power APPROVE A PROJECT CONTINGENCY AMOUNT OF $2,500,000 FOR EXISTING CONTRACTS RELATED TO THE LOCAL GENERATION REPOWERING PROJECT -
1 Getting to the Fiber: Lateral Builds Presented by Stephen Kankus, NYSERNet Quilt Regional Optical Networking Workshop June 22, 2004.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
UNIVERSITY OF NAIROBI PHYSICAL RESOURCES. 1. Land University of Nairobi owns 118 parcels both on leasehold and freehold interest basis. Forty nine (49.
14/10/2015European Agency for Reconstruction1 Water & environment.
Bio-Gas in the Wastewater Sector Milwaukee Metropolitan Sewerage District Kevin Shafer, PE Executive Director.
By Jack, Mike, Terrance, and Mohammad. Construct a city that consumes hydrogen as its primary fuel, we need an abundant energy and water supply, a hydrogen.
The OSB Environmental and Natural Resources Section The Promise of Development: Natural Resource Issues in a New Economy May 7-8, 2009.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
THE FUTURE OF SLUDGE DISPOSAL? Anthony Pilawski Bureau of Pretreatment and Residuals NJ Department of Environmental Protection P.O. Box 420 Trenton, NJ.
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
THE IMPORTANCE OF SANITARY SURVEYS by Mary L. Howell, Backflow Management Inc.
Public Information Meeting Wastewater Treatment January 26, 2016.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
David K. Paylor Virginia State Board of Health March 17, 2016.
September 11, 2012 Water Resources Statistics of the Republic of Kazakhstan A. Yepbayeva, Director of Production Statistics and Environment Department.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Power Resiliency at Water Utilities: What States Can Do Lauren Wisniewski U.S. Environmental Protection Agency ASDWA Webinar August 5, 2015.
WASTEWATER TREATMENT IN BULGARIA STATUS AND CHALANGES ORLIN DIKOV – INFRASTRUCTURE CONSULTANT.
Water Filtration Plant Improvements Project Summary
Data Center Stabilization
Ohio EPA Division of Surface Water Update
Wastewater Treatment.
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Wastewater Treatment.
City of Noblesville Wastewater Utility
One Utility’s Path to Climate Change Readiness
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Environmental Compliance
City of Janesville Wastewater Facility Plan Amendment Public Hearing
The Project Overview and Status Report
Presentation transcript:

The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority

Recent Plant Upgrade Recently completed a plant expansion, including: Increased pumping capacity based on 100 year storm Raised grade along river approximately 10 feet Upgraded backup electric including a Cogeneration facility, allowing us to go on “Island Mode” for 16 days during Superstorm Sandy (Approximate Construction Cost: $170M)

Storm Response Considerations Additional Storage Tanks; think outside the box: Utilize offline primary or secondary tanks Temporarily increase SVI in secondary Plan for out of state disposal sites Modify bid specifications for sludge disposal/hauling to include alternate

Review Possible Last Resort Options Disposal at garbage incinerator facilities – Establish which facilities are available to a plant – Review any technology limitations to accepting biosolids. – Review permit barriers and weather emergency approvals would be possible. Begin discussions with appropriate agencies. Onsite open air storage of dried/dewatered biosolids – Establish a location suitable for storage – Review storm water protection measures required

Conclusions: Advanced preparation will save time during emergency: » Plan a temporary thickening/dewatering scenario Involve vendors early to establish a plan of action and have the required utilities and piping connections available » Review options for power generation and establish backup locations where temporary generators can be connected to critical equipment May not be able to use plant distribution. Have equipment and/or building specific utility connection options.