Piceance Basin Natural Gas Development Program

Slides:



Advertisements
Similar presentations
Fort Myers/Lee County Enterprise Zone. Enterprise Zone Areas targeted for economic revitalization Areas targeted for economic revitalization Prior to.
Advertisements

Pivotal and Jefferson Island Storage and Hub Update March 18, 2005.
creating a sustainable world The Chesapeake Bay TMDL A Policy Model for Nutrient Pollution Reductions James Noonan October.
Event Title Name Erasmus Coordinator Workshop June 2009 David Hibler.
Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4.
September 10, Overview The purpose of the presentation is to provide an update on the status of the opening of school. The purpose of the presentation.
Education – 17 August 2011 HUMANITARIAN ACTION COMMITTEE MEETING - LIBERIA SECTORAL UPDATE IRC distribution in Yeaplay (Logwato border)
EU Assistance to Northern Municipalities Kjartan BJORNSSON European Commission Liaison Office to Kosovo Head of Operations 06 July 2011 European Commission.
Edwardsport IGCC Mine Stabilization Project Construction at the Largest Remediation Mine Grouting Project in North America Presented by: Howard Concrete.
$63.9 Million to $87.2 Million. CIAP Energy Policy Act of 2005 allocated $250 Million annually to 6 states for 4 years Alaska Alabama California Louisiana.
Rulison and Rio Blanco Sites U.S. Department of Energy Office of Legacy Management Northwest Colorado Oil and Gas Forum September 4, 2008.
1 Williams Current Drilling and Producing Operations n Currently have 25 drilling rigs operating in Garfield and Rio Blanco Counties. 16 in Valley and.
Northwest Colorado Oil & Gas Forum September 4, 2008 Northwest Colorado Oil & Gas Forum September 4, 2008.
© Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry June 5, 2008.
1 Williams Current Drilling and Producing Operations n Currently have 25 drilling rigs operating in Garfield and Rio Blanco Counties. 18 in Valley and.
Report to Northwest Oil & Gas Forum Garfield County Fairgrounds, Rifle, CO | September 4, 2008 David Grisso, Operations Field Leader, South Piceance.
Northwest Colorado Oil & Gas Forum June 5, 2008 Northwest Colorado Oil & Gas Forum June 5, 2008.
Report to Northwest Oil & Gas Forum
5 th - Number Sense. 1. Which is the same as 13? A B. 10 × 3 C D. 1 × 3.
Energy, Water Consumption & Carbon Emissions June 2010.
Second Amendment to Cooling Water and Landfill Gas Sale and Purchase Agreements December 16, 2008.
RANCHERS EVALUATE REMOTE STOCK WATER MONITORS DURING FIRST YEAR OF OPERATION Kevin Heaton Utah State University Extension Kane, Garfield & Washington Counties.
Cadiz Valley Water Conservation, Recovery & Storage Project July 2013.
Mojave Water Agency: How we are trying to avoid our own liquidity crisis Kirby Brill General Manager, Mojave Water Agency Business Development Association.
1 CWAG 2010 WATER LAW CONFERENCE The Broadmoor Colorado Springs, Colorado April 29 – 30, 2010.
Station Fire Project Status Presented by Los Angeles County Flood Control District.
NORTHEAST VALLEY COALITION AGAINST METHAMPHETAMINE.
2014 Industry Outlook Forum Cook Inlet Energy, LLC Operational Update.
© 2009 Dominion August 5, 2009 Underground Transmission Lines at Dominion Virginia Power Update for the Joint Committee on Technology and Science Presented.
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
A Watershed Approach to Environmental Restoration in Mecklenburg County David A. Woodie, PE, CPSWQ Mecklenburg County Land Use & Environmental Services.
A sampling of stream and watershed improvement projects in the Lower Gallatin watershed.
July 16, 2010 Becky Kelley, Director We're Horse Friendly in Georgia.
Robert Weber PA Fish and Boat Commission Fisheries Biologist Fish Management Division.
FM Area Diversion International Legislators Forum June 27, 2014 Keith Berndt PE Cass County ND Administrator.
 Review of Servicing Initiative Mandate  Sanitary Sewer Concept  Storm Sewer Concept  Water Main Concept  Principles of A Joint Servicing Agreement.
$ TOTAL INCOME 100 Quick Start 4 Within 30 Days of Start Date.
July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
Overview of British Columbia’s Infrastructure Royalty Credit Program
Special Board Meeting October 18, 2010 Capital Project Update Neighbourhoods of Learning Consultation Final Report.
HS-30 Hydrostatic Pressure Sensor Presented By Peter Ward Hydrological Services Pty Ltd.
From US 17 to SR 11 and SR 11 to Cone Road FPID No
CAP CAVSARP: Clearwater Facility. CAP (Central Arizona Project) In 1980, Arizona overdraft: 2.5 million acre feet year (afy) groundwater deficit due to.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee August 24, 2010 Metro Permit Reissuance Proposed.
Local Government Assessment of Pipeline Safety and Planning Issues Technical Assistance Grant Association of Washington Cities (AWC)
IMSA Dedicated to providing quality certification programs for the safe installation, operation and maintenance of public safety systems; delivering value.
A collection and extraction system for wastewater is installed between the liner system and the waste disposed in the landfill. All wastewater flows to.
GARFIELD COUNTY OIL & GAS SUMMARY. OPERATING GAS WELLS IN GARFIELD COUNTY PRODUCING WELLS PRODUCING WELLS
Shelley A. Wright Wyoming Pipeline Authority January 27, 2004 Expansion Projects Update.
Stormwater Permitting for Small Oil and Gas Construction Activities Garland Anderson May 10, 2005.
Wyoming Pipeline Authority August 24, 2004 Mark C. MoenchJohn R. Smith Vice President and General Counsel Director, Regulatory and Governmental Affairs.
Working to improve availability of plant materials for partner organizations Shannon Hatch DEVELOPMENT OF NATIVE PLANT MATERIALS FOR RIPARIAN RESTORATION.
BBC Research & Consulting 3773 Cherry Creek North Drive, # 850 Denver, Colorado December Committee Meeting Progress.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Transforming Three Mile Creek Protecting and enhancing the health, culture, and economic well-being of our community through responsible management of.
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
Bryan Hassler, Executive Director Society of Petroleum Engineers January 21, 2004 Rock Springs, WY.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
The Missouri Department of Transportation 2007 Update.
UTAH BOARD OF OIL, GAS AND MINING EARTH DAY AWARD NOMINATION Canyon Fuel Company, LLC - SUFCO MINE Habitat Improvement Projects Within The Muddy Drainage.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
Fulfilling the Need 1 A modern water supply and distribution system.
The Boardman: A River Reborn Removing Dams for a Free Flowing River.
> Las Vegas Valley Watershed Advisory Committee Regional Water Quality Plan.
Economic and Workforce Aspects of Energy Available Resources Scott Fast.
ESPY 1-22 Solution GROUP P: JEREMIAH LARSON, CLAYTON HAWORTH, MOHAMMED JAFFAL.
Protecting the Lives of our Community Every single day, much of what we do goes by without much notice. Without fail, we work hard to protect the lives.
Temple’s Vision 2020 A 10 Year Plan ( ).
The Boardman: A River Reborn
Potholes Supplemental Feed Route Project
Presentation transcript:

Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry September 4, 2008 Kristi Pollard – Policy, Government & Public Affairs, → Chevron Staff, based in Grand Junction Sean Norris – Coordinator for the Environmental, Social and Health Impact Assessment (ESHIA), → Chevron Staff, based in Grand Junction Aim of the meeting To provide you with more information about the project, and to answer your questions

Piceance Natural Gas Program Update Two Recent Hand Injuries that Required Medical Attention 83 Wells on 4 Pads Have Been Drilled to Date H&P Rig 318 Celebrated One Year Injury Free KSI (Construction Contractor) Completed One Year Injury Free 30 Inch Sales Pipeline Completed in August 2008 Currently Flowing 5MMCFD Gas is Being Processed by Enterprise Enhanced Performance Through Technology/Process Improvements

Well Design TD – 200’ below the WF. Average TVD ~ 5,800’. KOP – Minimum 200’ Max Build Rate – 3o / 100’ Max Inclination – 40o Max Drop Rate - 2o / 100’ Average Departure ~ 1100’. Section 25 shown with 64, 10 acre wells hit from three pads in valley location.

Piceance Natural Gas Program Update cont. ESHIA Being Implemented into Project Management Plan Plan Replaced Produced Water Pond with Tanks Steadily Expanding Environmental Monitoring Programs – Water Quality and Wildlife Finalized $25M Agreement with Garfield County for CR 204 Granted a $45K Grant to the De Beque School District for a Computer Lab, Software and Hardware

Piceance Natural Gas Program Update cont. Partnering with the Tamarisk Coalition on the Watson Island Project Eradication and Re-vegetation along a 70 mile stretch of the Colorado River Major Sponsor for the Robb River Rally on Sept. 13th A Community Biking/Running Event to Continue the Vision of Completing a Trail System Along the Colorado River from Garfield County to Utah and from Grand Junction to Delta along the Gunnison River

The Future of the Piceance Program Continue Operating the Current Two Drilling Rigs Until Mid 2010. Continue Infrastructure Installation in the Clear Creek Valley. Central Production Facility Commissioning Targeted for Second Quarter 2009. Continue Interim Production Operations Until Facility Commissioning. Limited Well Completion Activity Until Second Quarter 2009.