Status of PDC’07 Latchezar Betev TF meeting – April 5, 2007.

Slides:



Advertisements
Similar presentations
THIS TEXT WILL NOT BE SHOWN DURING PRESENTATION! Design by Jon Angelo Gjetting Reproducability not allowed without explicit.
Advertisements

ALICE G RID SERVICES IP V 6 READINESS
Sue Foffano LCG Resource Manager WLCG – Resources & Accounting LHCC Comprehensive Review November, 2007 LCG.
CREAM: Update on the ALICE experiences WLCG GDB Meeting Patricia Méndez Lorenzo (IT/GS) CERN, 11th March 2009.
15/07/2010Swiss WLCG Operations Meeting Summary of the last GridKA Cloud Meeting (07 July 2010) Marc Goulette (University of Geneva)
Financial Upgrade 8.8 Update. Status Fit Gap Complete Fit Gap Complete Design in Progress Design in Progress Development in Progress Development in Progress.
Torrent-based Software Distribution in ALICE.
ALICE Operations short summary and directions in 2012 Grid Deployment Board March 21, 2011.
ALICE Operations short summary LHCC Referees meeting June 12, 2012.
ALICE Operations short summary and directions in 2012 WLCG workshop May 19-20, 2012.
Patricia Méndez Lorenzo (IT/GS) ALICE Offline Week (18th March 2009)
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
Status of WLCG Tier-0 Maite Barroso, CERN-IT With input from T0 service managers Grid Deployment Board 9 April Apr-2014 Maite Barroso Lopez (at)
ALICE Roadmap for 2009/2010 Patricia Méndez Lorenzo (IT/GS) Patricia Méndez Lorenzo (IT/GS) On behalf of the ALICE Offline team Slides prepared by Latchezar.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
John Gordon STFC-RAL Tier1 Status 9 th July, 2008 Grid Deployment Board.
Status of the production and news about Nagios ALICE TF Meeting 22/07/2010.
Agenda and NDGF status Olli Tourunen HIP-NDGF meeting CSC, May 7 th 2007.
Status of PDC’06 Latchezar Betev TF meeting – September 28, 2006.
WLCG GDB, CERN, 10th December 2008 Latchezar Betev (ALICE-Offline) and Patricia Méndez Lorenzo (WLCG-IT/GS) 1.
MW Readiness Verification Status Andrea Manzi IT/SDC 21/01/ /01/15 2.
Status of the Production and Nagios news ALICE TF Meeting 29/07/2010.
PDC’06 – production status and issues Latchezar Betev TF meeting – May 04, 2006.
ALICE Grid operations: last year and perspectives (+ some general remarks) ALICE T1/T2 workshop Tsukuba 5 March 2014 Latchezar Betev Updated for the ALICE.
Status of PDC’07 and user analysis issues (from admin point of view) L. Betev August 28, 2007.
EGEE is a project funded by the European Union under contract IST EGEE Services Ian Bird SA1 Manager Cork Meeting, April
CERN – Alice Offline – Thu, 20 Mar 2008 – Marco MEONI - 1 Status of Cosmic Reconstruction Offline weekly meeting.
Rutherford Appleton Lab, UK VOBox Considerations from GridPP. GridPP DTeam Meeting. Wed Sep 13 th 2005.
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
Phase 2 of the Physics Data Challenge ‘04 Latchezar Betev ALICE Offline week Geneva, September 15, 2004.
Plans for Service Challenge 3 Ian Bird LHCC Referees Meeting 27 th June 2005.
AliEn central services Costin Grigoras. Hardware overview  27 machines  Mix of SLC4, SLC5, Ubuntu 8.04, 8.10, 9.04  100 cores  20 KVA UPSs  2 * 1Gbps.
Status of the Production ALICE TF MEETING 11/02/2010.
DJ: WLCG CB – 25 January WLCG Overview Board Activities in the first year Full details (reports/overheads/minutes) are at:
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
Patricia Méndez Lorenzo (CERN, IT/GS-EIS) ċ. Introduction  Welcome to the first ALICE T1/T2 tutorial  Delivered for site admins and regional experts.
SL5 Site Status GDB, September 2009 John Gordon. LCG SL5 Site Status ASGC T1 - will be finished before mid September. Actually the OS migration process.
Christmas running post- mortem (Part III) ALICE TF Meeting 15/01/09.
Status of AliEn2 Services ALICE offline week Latchezar Betev Geneva, June 01, 2005.
Data transfers and storage Kilian Schwarz GSI. GSI – current storage capacities vobox LCG RB/CE GSI batchfarm: ALICE cluster (67 nodes/480 cores for batch.
PDC’06 - status of deployment and production Latchezar Betev TF meeting – April 27, 2006.
ALICE Grid operations +some specific for T2s US-ALICE Grid operations review 7 March 2014 Latchezar Betev 1.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
CREAM CE: upgrades in the system  Migration of the ALICE production queue in the CREAM CE: DONE  From pps-cream-fzk.gridka.de:8443/cream-pbs-pps to.
ALICE Physics Data Challenge ’05 and LCG Service Challenge 3 Latchezar Betev / ALICE Geneva, 6 April 2005 LCG Storage Management Workshop.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPIX, BNL 13 Oct 2015.
ALICE computing Focus on STEP09 and analysis activities ALICE computing Focus on STEP09 and analysis activities Latchezar Betev Réunion LCG-France, LAPP.
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
Dissemination and User Feedback Castor deployment team Castor Readiness Review – June 2006.
The ALICE Production Patricia Méndez Lorenzo (CERN, IT/PSS) On behalf of the ALICE Offline Project LCG-France Workshop Clermont, 14th March 2007.
Best 20 jobs jobs sites.
Pledged and delivered resources to ALICE Grid computing in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
Maria Alandes Pradillo, CERN Training on GLUE 2 information validation EGI Technical Forum September 2013.
Offline week meetings CERN – June 25, 2009 CAF user experience Maria Nicassio (INFN Bari)
A Nordic Tier-1 for LHC Mattias Wadenstein Systems Integrator, NDGF Grid Operations Workshop Stockholm, June the 14 th, 2007.
A Distributed Tier-1 for WLCG Michael Grønager, PhD Technical Coordinator, NDGF CHEP 2007 Victoria, September the 3 rd, 2007.
Availability of ALICE Grid resources in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
Status of the SL5 migration ALICE TF Meeting
Piotr Bała, Marcin Radecki, Krzysztof Benedyczak
NDGF The Distributed Tier1 Site.
ALICE internal and external network
Virtualization and Clouds ATLAS position
Operations and plans - Polish sites
Latest WMS news and more
Torrent-based software distribution
MC data production, reconstruction and analysis - lessons from PDC’04
Torrent-based software distribution
Simulation use cases for T2 in ALICE
AliEn central services (structure and operation)
Presentation transcript:

Status of PDC’07 Latchezar Betev TF meeting – April 5, 2007

Status of PDC’07 2 Central services  Stable operation  95+ % availability  ApiService - couple of short hiccups this week, strongest one this morning at 09:50  Closure of high (>2000) ports in the CERN firewall (June) We need to delcare all ports (TPC/UDP) needed for the central services ApiService, alien.cern.ch machines already done aliendbx - list is being prepared Site services  Analysis queue is still suffering from problems with the CERN VO-boxes. Multitude of sensors deployed by IT and us

Status of PDC’07 3 Nordic sites  Jyvaskyla (Finland) - running  Aalborg, NBI - not running yet Next week - NDGF expert in charge of ALICE will be at CERN for training  Norway, Sweden - no progress  Storage - part of the storage suffered serious hardware malfunction (offline) dCache not updated yet Polish sites  Cyfronet running - recompilation of AliRoot for Itanium on SLC3 is needed  Poznan - to be debugged  Warsaw - to be installed (LCG/AliEn?) Additional regional expert from WTU to be trained at CERN soon

Status of PDC’07 4 Job profile All started with a bunch of boxes… A bit of screwing around…