STUBBLEFIELD LAKE ROAD Head Wall Failure
THE HEAD WALLS ARE GIVING AWAY AND THE ROAD IS SINKING
PILING TIMBERS HAVE GIVEN AWAY
EXACT DAMAGE IS NOT ACCESSIBLE UNTIL EXCAVATION BEGINS
This one is over four feet deep!!
LABOR COSTS Just recently Precinct 4 built bulkheads on Hostetter Rd. That project cost the county roughly $120 per foot. Stubblefield Lake Rd needs 180 feet of bulkheads constructed. $120/ft x 180’ = $21,600 *** This is just a rough estimate. ***
MATERIAL COSTS (STEEL) /8”Pilings, 8- 30’ x 5/16”sheet plate, 180’- 7”channel, 180’- 8”Angle, 40’-4” Angle, 40’-4” Flat Bar, 500’-3/4”Galvanized Cable, 50-3/4” Galvanized Cable Clamps $23, *** This is just a rough estimate. ***
ROAD MATERIAL COSTS Stabilized Sand 200tns * 30.14/tn = $6, Limestone Base 150tns * 24.59/tn = $3, Hot Mix 100tns * 67.69/tn = $6, $16, *** This is just a rough estimate. ***
APPROVAL REQUESTED Total Estimated Cost $61, Please approve purchasing to bid out this project.