STUBBLEFIELD LAKE ROAD Head Wall Failure. THE HEAD WALLS ARE GIVING AWAY AND THE ROAD IS SINKING.

Slides:



Advertisements
Similar presentations
RETAINED SOIL WALL SYSTEM™
Advertisements

Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Skyscraper Construction
McElroy Mine Shaft Explosion Investigation Summary This presentation is for illustrative and general educational purposes only and is not intended to substitute.
Architectural Drawing
Foundations Excavations
Retaining Wall Design Slope Stability on US-189 MAQuiGr Engineering
Teresita S. Arlante Naga City Science High School.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
CON 4003, CVE 4073, CVE 5073 Construction Estimating Prof R. V. Locurcio, PE.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Mechanically Stabilized Earth (MSE) Wall Project Geotechnical Design CEG 4801 Fall 2010 Kamal Tawfiq, Ph.D., P.E. Due Date: 9/30/2010.
FOOTINGS.
The development of Roofs Roof are one of a building’s primary elements and play a major part in giving a building its character. A roof must be weather.
1. By Dr. Attaullah Shah Swedish College of Engineering and Technology Wah Cantt. Reinforced Concrete Design-II Lec-3 Retaining walls.
Holt CA Course Estimating with Fractions x = = = Warm Up Solve. x = 24.6 x = x = x t 4.1 x 15.1.
RELATED RATES Mrs. Erickson Related Rates You will be given an equation relating 2 or more variables. These variables will change with respect to time,
Chapter 4 Measuring Concrete Work
The Pythagorean Theorem Part 2. The bases on a baseball diamond are 90 feet apart. How far is it from home plate to second base? 90 ft c a b.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
Investigator Casualty Guide Identifying & Assessing Damage “Looking Deeper” March 2013.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
A group of friends recently took a vacation at one of New York’s Finger Lakes and Shortly After decided to invest in a newly built and furnished home.
Agricultural Mechanics Fundamentals & Applications
BILL OF MATERIALS. BEGINNING THOUGHTS ► IDENTIFY ONE MACHINE THAT YOU WILL USE TO BULID YOUR CONCRETE FLOAT? ► WHY MUST YOU USE A RULER WHILE BUILDING.
Earls Mill Road Retaining Wall Ground Anchors and Strengthening.
CON 4003 Construction Estimating Prof R. V. Locurcio.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
Objective Calculate the amount of materials needed for a construction project.
Proposed answers to lesson 2 calculations. Walls – 13mm Aqualine,fixed to timber, stopped to level 4 (m2) Materials - 13mm Aqualine (1.20 x 2.70) = $48.60.
Types of Metal.
Site Work.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
UNIT I RETAINING WALLS.
CON 4003 Construction Estimating Prof R. V. Locurcio.
The Pythagorean Theorem Part 2. The bases on a baseball diamond are 90 feet apart. How far is it from home plate to second base? 90 ft c a b a² + b² =
City of Marshall Development Proposal to Ralco Nutrition, Inc. August 7, 2012.
Point Value : 50 Time limit : 5 min #1 At a sand and gravel plant, sand is falling off a conveyor and into a conical pile at the rate of 10 ft 3 /min.
Objective 39 Honors Geometry WP: Pythagorean Theorem.
Chapter 5: Trigonometric Functions Whiteboard Practice Session Lessons 1, 2, & 4 Mrs. Parziale.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
Various shapes and sizes of steel are available for different purposes. Blooms, billets, and slabs arrive at finishing mills, where they are formed into.
3.10 – Related Rates 4) An oil tanker strikes an iceberg and a hole is ripped open on its side. Oil is leaking out in a near circular shape. The radius.
August 6, 2013 LAKE FORREST DRIVE UPDATE. sandyspringsga.gov Lake Forrest Drive Update  Actions To-Date Work Orders – 13 since 2009 for clean-up, 8 of.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
Snohomish County Fire Chiefs Training Division
SARDAR PATEL INSTITUTE OF TECHNOLOGY
MULTI-DIGIT MULTIPLICATION AND ESTIMATION SEPTEMBER 24, 2014.
E. Mountain Drive Sink Hole Call received Ms. White March 7 th Response Richard Navarro March 7 th.
Sardar Patel Institute Of Technology
MOVING FORWARD!!.
How To Write An Approvable Change Order
Building Construction Technology I
Area of Shapes.
SHERINE RAJ AP/CIVIL ENGINEERING DEPARTMENT OF SCD
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
MATERIALS AND CONSTRUCTION I
Landforms.
Concrete Structures DR. Nabil Dmaidi.
Foundations Four Basic Types Footings Piers Pilings Slabs
Right Triangle Trigonometry: Applications
G.B.N GOVT. POLYTECHNIC, NILOKHERI
اصول گودبرداری و ایمن سازی
Project Comparison. Ward Shore Park Living Shoreline Project Follow Up to January 23 Presentation.
STEEL PLATES.
Types of Metal.
Stream Crossing Replacement Policy
Presentation transcript:

STUBBLEFIELD LAKE ROAD Head Wall Failure

THE HEAD WALLS ARE GIVING AWAY AND THE ROAD IS SINKING

PILING TIMBERS HAVE GIVEN AWAY

EXACT DAMAGE IS NOT ACCESSIBLE UNTIL EXCAVATION BEGINS

This one is over four feet deep!!

LABOR COSTS Just recently Precinct 4 built bulkheads on Hostetter Rd. That project cost the county roughly $120 per foot. Stubblefield Lake Rd needs 180 feet of bulkheads constructed. $120/ft x 180’ = $21,600 *** This is just a rough estimate. ***

MATERIAL COSTS (STEEL) /8”Pilings, 8- 30’ x 5/16”sheet plate, 180’- 7”channel, 180’- 8”Angle, 40’-4” Angle, 40’-4” Flat Bar, 500’-3/4”Galvanized Cable, 50-3/4” Galvanized Cable Clamps $23, *** This is just a rough estimate. ***

ROAD MATERIAL COSTS Stabilized Sand 200tns * 30.14/tn = $6, Limestone Base 150tns * 24.59/tn = $3, Hot Mix 100tns * 67.69/tn = $6, $16, *** This is just a rough estimate. ***

APPROVAL REQUESTED Total Estimated Cost $61, Please approve purchasing to bid out this project.