Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &

Slides:



Advertisements
Similar presentations
Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
Advertisements

FPUA Storm Readiness 2007 Florida Public Service Commission Internal Affairs May 23, 2007 Craig Brewer- Superintendent of Electric T&D.
Electric Infrastructure Workshop January 23, 2005 Florida Public Utilities Company.
Electric Utility Infrastructure Florida Public Service Commission Workshop Paul Davis, Director Energy Control Center Tampa Electric Company January 23,
May 23, STORM PREPAREDNESS EMBARQ – FLORIDA, INC. Sandra Khazraee – Regulatory Manager.
Lee County Electric Cooperative 2006 Hurricane Preparedness Plan.
Hurricane Season Preparedness Briefing Gulf Power Company June 5, 2006.
Progress Energy Florida 2007 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 23, 2007.
Florida Public Service Commission Internal Affairs Hurricane Season Preparation Paul Davis, Director Energy Control Center June 5, 2006.
JEA Storm Readiness 2006 Florida Public Service Commission Internal Affairs June 5, 2006 Presenter: Ted Hobson, VP, Fuels, Purchased Power & Compliance.
Emergency Management Emergency Planning Emergency Preparedness Disaster Management Disaster Recovery Coordination Primary Functions.
1 1 First Quartile Consulting Insights Conference August 21, 2013 Presented By: Jim Lorenz Director - Electric Transmission and Distribution Construction.
FPL Hurricane Assessment Operating Committee January 25, 2005.
Westar Energy Emergency Preparedness and Restoration TFR Meeting June 26, 2012 Jim Tyler Director, Distribution Services.
A Brief Overview of Emergency Management Office of Emergency Management April 2006 Prepared By: The Spartanburg County Office of Emergency Management.
2011 Windstorm “Be Prepared: Preventing Disaster/ Planning for Recovery” South Bay Cities Council of Governments 13 th Annual General Assembly February.
Facilities Management Post Hurricane Building Assessment and Recovery June 28, 2007.
Spring 2009 San Diego State University Emergency Management Program
Expect the Best, Prepare for the Worst: Crisis Planning on College Campuses NASPA IV EAST Regional Conference November 2-4, Indianapolis IN.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
Introduction & Opening Remarks l Hurricanes of 2004 & 2005 highlight the need for a fresh look at these issues l We support this effort and will be active.
Power Outages and Emergency Communications November 13, 2012.
Florida Power & Light 2006 Hurricane Preparedness Plan June 5, 2006 Presented by: Geisha Williams.
1 Crisis Management / Emergency Management Overview.
Pipeline Safety Trust Pipeline Safety Conference New Orleans November 5-6, 2009.
January 2009 SEMO Ice Storm Extreme Measures IEEE-PES St Louis Chapter Meeting June 18, 2010 Presented by David Wakeman Vice President, Energy Delivery.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
FPSC Electric Utility Infrastructure Workshop Florida Municipal Electric Utilities Alan Shaffer Assistant General Manager - Delivery Lakeland Electric.
Electric Utility Infrastructure Commission Staff Workshop January 23, 2006.
A Brief Overview of Emergency Management Office of Emergency Management September 2004 Prepared By: Marybeth Solesbee, CEM.
Florida Municipal Electric Utilities May 6, 2009 Paul Kalv, Director City of Leesburg Electric Department Florida Public Service Commission Docket No.
1 Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 6, 2009.
Tampa Electric Company 2009 Hurricane Season Preparation Regan Haines Director, Energy Delivery May 6, 2009.
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2014 Hurricane Season Preparation Informal Meeting for Electric Utilities with Florida Public Service Commission Staff March 26, 2014.
2009 Hurricane Preparedness Richard Shaheen Sr. Director, Engineering & Technical Services May 6, 2009.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Hurricane Season Preparation Briefing Florida Public Service Commission May 1, 2008 Kevin Wailes General Manager – Electric Utility.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
Public Power in Florida Mutual Aid and Storm Readiness Barry Moline Executive Director Florida Municipal Electric Association ,
2009 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 6, 2009.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
2015 Storm Readiness Report Kurt Miller, Director of Engineering Suwannee Valley Electric Cooperative, Inc.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 1, 2008.
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
Cooperative Continuity Management Bill Willingham Florida Electric Cooperatives Association, Inc. Tallahassee, FL.
Writing an Emergency Operations Plan Why do we need to plan? Spring 2008.
Informal Meeting with FPSC Staff 2015 Hurricane Season Preparation March 18, 2015.
James Lee Witt Associates Emergency Management & Damage Mitigation Florida Public Service Commission Electric Utility Infrastructure Workshop January 23,
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
Introduction to the Emergency Operations Center City of Santa Cruz 2011 EOC Training and Exercise.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
2008 Hurricane Season Preparations
Public Power in Florida Mutual Aid and Storm Readiness
Florida Public Service Commission
HURRICANE MATTHEW AFTER ACTION REPORT.
Hurricane Preparedness Plan 2008
Ice Storm 2013 Technical Briefing
Pacific Power Seismic Preparedness Update
Progress Energy Florida 2008 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 1, 2008.
2007 Hurricane Season Preparations
Florida PSC 2014 Hurricane Season Preparation
Florida PSC Hurricane Preparedness Meeting May 6, 2009
2007 Hurricane Season Preparedness Briefing
TxMAG presentation
Disaster Recovery Operations
Presentation transcript:

Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering & Operations

KUA System Data Serves approximately 64,000 customers in Osceola County Distribution –857 Miles of Distribution Lines 41 % Overhead 59 % Underground –9 Substations –47 Feeder Circuits –15,000+ Poles (majority wood)

KUA System Data Transmission –72 Miles of Transmission Lines –230 kV and 69 kV –63% of Poles Concrete or Steel –37% Wood (will reduce to 27% by 2008)

2004 Hurricane Experience Charley –100 % Customers Lost Power Frances –36 % of Customers Lost Power Jeanne –59 % of Customers Lost Power

Lessons Learned Hired James Lee Witt, Associates to Conduct Independent Assessment of Preparation for and Recovery From Storms Improve Communications with Customers During Restoration Cant Rely Solely on Media for Communications

Lessons Learned Better Define Roles of All Employees Closer Coordination with EOC for Restoration Priorities

Hurricane Preparedness

Construction Standards Poles Designed to NESC Extreme Wind Loading –All New Construction –Major Expansions or Relocation Projects –Targeted Critical Structures

Construction Standards 27% of Wooden Transmission Poles to be Replaced with Steel and Concrete Redundant Circuits to All Hospitals with Automatic Transfer Scheme

Construction Standards Selected Overhead to Underground Conversions Underground Utilities Required in All New Subdivisions

GIS/Outage Management All Transmission & Distribution Facilities Tracked in GIS Links to Outage Management System Tracks Outages Down to Individual Customer Level

Vegetation Management Transmission Circuits –Inspected/Trimmed Annually Distribution –Three Year Trim Cycle Increased funding over 75% Since 2004

Pole Inspection Program All Wood Transmission Poles Inspected Every Two Years Wood Distribution Poles Inspected on Eight Year Cycle

Facility Inspection Program Transmission System –Annual Visual Inspections –Annual Infrared Scanning Distribution System –5 Year Cycle on Inspections –Infrared Scans of All Circuits Annually

Emergency Operations Plan All Hazards Approach Concentration on Hurricanes Reviewed and Updated Annually Follow National Incident Management System (NIMS)

Emergency Operations Plan All Employees Have Pre-assigned Roles Defined Set of Activities for Each Phase of Storm Preparation, Response and Recovery Pre-Defined List of Priority Facilities

Emergency Operations Plan Pre-Assigned Damage Assessment Teams –Circuits Pre-Assigned –Area Coordinators for Teams Developing Electronic Reporting of Damage Assessment

Emergency Operations Plan Pre-Defined List of Restoration Priorities –Typical Top Priorities – Evacuation Shelters, Emergency Operations Centers, Hospitals, etc. –Priorities Can be Changed by Directive from EOC

Annual Mock Disaster Drill Full Scale Drill Practiced Annually (April 12, 2007) All Employees Participate Evaluation Teams Rate Performance Post Drill Evaluation Conducted Action Items – Changes to Processes, Facilities, Plan

Storm Response and Recovery Crews Assigned to Ride Out Storm at Selected Fire Stations –Assist First Responders with Wires Down Situations –Assist with Fire Calls for Power Disconnects

Storm Response and Recovery Personnel Assigned to EOC at All Times Regular Status Updates Given to EOC Close Coordination with EOC for Restoration Priorities

Storm Response and Recovery Mutual Aid Agreements –Florida Municipal Electric Association (Florida Municipal Utilities) –American Public Power Associations (National Municipal Electric Utilities) –Florida Coordinating Group (Florida Municipal, Investor Owned and Cooperative Utilities)

Storm Response and Recovery Pre-Arranged Agreements –Transmission and Distribution Line Contractors –Outside Engineering (damage assessment and construction management) –Vegetation Management (Tree Clearing) –Lodging, Catering, Laundry, etc.

Customer Communications Call Centers Fully Staffed 24/7 Throughout Recovery Process Provide Status Updates to Customers – s –Voice Mails or Text Messages –Physically Place Door Hangers

QUESTIONS? Kissimmee Utility Authority Ken Davis Vice President Engineering & Operations Phone: (407) Ext