Prepare LSR/SUPP using electronic system AT&T Prepares Order to send to BST Order Type? 1.0 AT&T Coordination required? Non-Mechanized Mechanized or Partially.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Kapitel 21 Astronomie Autor: Bennett et al. Galaxienentwicklung Kapitel 21 Galaxienentwicklung © Pearson Studium 2010 Folie: 1.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
REQ Enrollment in Demand Response Programs Process Flow Engineering Firm Retail Customer Demand Response Service Provider (DRSP) Distribution Company.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Child Health Reporting System (CHRS) How to Submit VHSS Data
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
Prepare LSR/SUPP using electronic system AT&T Prepares Order to send to BST Order Type? 1.0 AT&T Coordination required? Non-Mechanized Mechanized or Partially.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
ABC Technology Project
1 ITSS This overview deck contains two sections. Please use the links below to navigate –How to Register for ITSS Application AccessHow to Register for.
© S Haughton more than 3?
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
1..
Do you have the Maths Factor?. Maths Can you beat this term’s Maths Challenge?
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Januar MDMDFSSMDMDFSSS
REGISTRATION OF STUDENTS Master Settings STUDENT INFORMATION PRABANDHAK DEFINE FEE STRUCTURE FEE COLLECTION Attendance Management REPORTS Architecture.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
New Rubrics? Create Assignment and Project Templates and Send the Assignments in Tk20 Must do before you can use updated rubrics Theresa Dorn.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
Section 1: Process to create EAS Interface File  DoD Batch and Timecard Status Report  DoD Employee Missing Payroll Data Report  Distribute Labor Cost.
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
Presentation transcript:

Prepare LSR/SUPP using electronic system AT&T Prepares Order to send to BST Order Type? 1.0 AT&T Coordination required? Non-Mechanized Mechanized or Partially Mechanized 6 5 No Selection of Coordination or time specific boxes on LSR Select Coordination Box on LSR Time Specific? Yes No Select time specific box & indicate time 3 Yes No 3 B B 9 2 AT&T Complete LSR Attachment 2 Exhibit C Coordinated Hot Cut Process Ordering & Provisioning of Unbundled Loops with Number Portability Page 10 FL 6/16/00 2 Order Type? AT&T Mechanized or Partially Mechanized AT&T Non-Mechanized Send LSR to BST via electronic interface Send LSR to BST via fax BST does system check to verify facility records BST makes physical Inspection of Facilities Records Inadequate/ unavailable? Yes No C

AT&T OK? BST Notify AT&T via Clarification AT&T Corrects & Issues Supp. 5 No C AT&T BST return FOC to AT&T AT&T Receives FOC Is due time different than request? Note Order Log No Yes Notify End User of due date & time Acceptable? D AT&T Update ASR Attachment 2 Exhibit C Coordinated Hot Cut Process Ordering & Provisioning of Unbundled Loops with Number Portability Page 11 FL 6/16/

D Yes No AT&T Perform internal steps to ready for cut Negotiate/request new due date & time 6 BST Places Loop Assignment info on service order BST sends service Order to CPG 7 BST Wires COSMOS Frame Wired By Plant Test Date? E E BST Test for dial tone and verify ANI BST Notifies AT&T via jeopardy 7 No Yes Good? Yes 8 No AT&T BST Refer no dial tone to AT&T AT&T Receives No Dial Tone Call AT&T Perform Internal Test F Page 12 FL 6/16/00 Attachment 2 Exhibit C Coordinated Hot Cut Process Ordering & Provisioning of Unbundled Loops with Number Portability AT&T Send create message to NPAC to prepare for cut BST sends concurrence message to NPAC within 18 hours of create being done

F Fixed? Yes END NoAT&T Dispatch Technician Problem fixed? Yes No END AT&T Notify BST to dispatch Technician AT&T BST to Dispatch Technician AT&T Dispatch Technician to meet BST G AT&T Fix by Due Date? Yes No END AT&T 9 Fix Problem AT&T Notifies BS & Issues SUPP BST Problem AT&T Problem Page 13 FL 6/16/00 Attachment 2 Exhibit C Coordinated Hot Cut Process Ordering & Provisioning of Unbundled Loops with Number Portability

G AT&T Yes No AT&T Tech meets BST Tech & jointly isolate & repair trouble BST 48 hours call to AT&T BST verifies dial tone & ANI on day of cut as a precaution/ safety check OK? BST Cut Order as requested/agreed by AT&T BST verifies ANI after cut has been performed BST Contact AT&T & issues jeopardy AT&T/BST negotiates new date & new time 10 H 8 H AT&T OK? No AT&T Performs Internal verification tests Yes AT&T END BST Tech calls AT&T after cut AT&T notifies BST of Acceptance BST Closes all associated BST Orders AT&T notifies BST of problem & Non-Acceptance BST Investigates & issues trouble ticket & resolves 11 AT&T AT&T Verify Problem Resolved Resolved? No Yes Page 14 FL 6/16/00 12 Attachment 2 Exhibit C Coordinated Hot Cut Process Ordering & Provisioning of Unbundled Loops with Number Portability BST Tech meets AT&T Tech & jointly isolate & repair trouble