Cooperative Continuity Management

Slides:



Advertisements
Similar presentations
Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
Advertisements

FPUA Storm Readiness 2007 Florida Public Service Commission Internal Affairs May 23, 2007 Craig Brewer- Superintendent of Electric T&D.
Public Power in Florida Mutual Aid and Storm Readiness Barry Moline, Executive Director Florida Municipal Electric Association (850) , ext. 1
Storm Preparedness Workshop Verizon Florida, LLC May 23, 2007.
Electric Infrastructure Workshop January 23, 2005 Florida Public Utilities Company.
Electric Utility Infrastructure Florida Public Service Commission Workshop Paul Davis, Director Energy Control Center Tampa Electric Company January 23,
May 23, STORM PREPAREDNESS EMBARQ – FLORIDA, INC. Sandra Khazraee – Regulatory Manager.
Progress Energy Florida 2007 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 23, 2007.
JEA Storm Readiness 2006 Florida Public Service Commission Internal Affairs June 5, 2006 Presenter: Ted Hobson, VP, Fuels, Purchased Power & Compliance.
Presentation to June 25, 2008 Northeast States-EPA Workshop Siting Renewable Energy Projects at Closed Solid Waste Landfills and Contaminated.
How to use this presentation. How Power is Restored After a Severe Storm Presented by YOUR NAME YOUR TITLE.
Catastrophic Event. An event that results from Earth processes and that can cause damage and endanger human life Weather Geologic –tornadoearthquake –hurricane.
Feeder Maintenance Program. The purpose of the Cooperative is to provide safe, reliable, low-cost energy services in fiscally responsible partnership.
New Product Overview Homac STORM SAFE™ Connector Systems Presented by: Presented by: Roy Jazowski - Director of R&D Mark Hammer – Director of Marketing.
1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.
Tallahassee, FL 02/17-18, 2015 Florida Kidney Day
Horizontal Wind Turbine Pros and Cons. Pros Almost never collapse Does not require much material to make it Catch steady winds rather than shifting winds.
Experience you can trust. Hurricane Hardening Commission Staff Workshop on Electric Utility Infrastructure Richard E. Brown, PhD, PE Tallahassee,
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
BHARTI MPH. CONTENTS DISASTER DISASTER TYPES OF DISASTER TYPES OF DISASTER EARTHQUAKES EARTHQUAKES LANDSLIDES LANDSLIDES FLOODS FLOODS CYCLONES CYCLONES.
Why Make NJ Energy Strong? Sandy, Hurricane Irene and the October 2011 snow storm represent extreme weather patterns that may become commonplace. For.
WORKSHOP. Agenda n Examine Firewise concepts n Learn hazard assessment tools & techniques n Review community development & land use planning processes.
Storm Hardening Workshop Docket No Verizon Florida, Inc. July 13, 2006.
2015 IEEE REPC Engineering Analysis of
After the Storm Recreated from Carolina Country, the monthly magazine of the N.C. Association of Electric Cooperatives The steps to restoring power Click.
Hazard Mitigation Assistance Hazard Mitigation means any action taken to reduce or eliminate the long-term risk too human life and property from natural.
Experience you can trust. 1 Electric Infrastructure Hardening Rebuilding Utility Infrastructure LSU Center for Energy Studies Bill Snyder
JH-KEADLE Catastrophic Events.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Infrastructure Development & Needs From a Commercial Viewpoint Chris Hendrix General Manager, Texas Retail Energy, LLC Manager of Energy Procurement, Wal-Mart.
FPSC Electric Utility Infrastructure Workshop Florida Municipal Electric Utilities Alan Shaffer Assistant General Manager - Delivery Lakeland Electric.
1 Benefits of Transmission Ownership Bob Johnston CEO of MEAG Power.
Electric Utility Infrastructure Commission Staff Workshop January 23, 2006.
CLEARLY WE KNOW HOW TO BURY LARGE STRUCTURES. DRILLING AND BURYNG ALONG THE SAME ROUTE AS THE “POLES” SHOWS IT CAN BE DONE !!
Florida Municipal Electric Utilities May 6, 2009 Paul Kalv, Director City of Leesburg Electric Department Florida Public Service Commission Docket No.
© Information Technology Services, Florida State University C6100 University Center Tallahassee, FL | 850/
Tampa Electric Company 2009 Hurricane Season Preparation Regan Haines Director, Energy Delivery May 6, 2009.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Hurricane Season Preparation Briefing Florida Public Service Commission May 1, 2008 Kevin Wailes General Manager – Electric Utility.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
© 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Wildfires, Vegetation Management and Powerlines Presented to Senator.
Public Power in Florida Mutual Aid and Storm Readiness Barry Moline Executive Director Florida Municipal Electric Association ,
Meteorological And Hydrologic Cooperation: “Impacts Of Weather, Water And Climate Information on Disaster Preparedness”
2015 Storm Readiness Report Kurt Miller, Director of Engineering Suwannee Valley Electric Cooperative, Inc.
May 6, STORM PREPAREDNESS EMBARQ – FLORIDA, INC. Sandra Khazraee – Regulatory Manager.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
Cooperative Continuity Management Bill Willingham Florida Electric Cooperatives Association, Inc. Tallahassee, FL.
James Lee Witt Associates Emergency Management & Damage Mitigation Florida Public Service Commission Electric Utility Infrastructure Workshop January 23,
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Pasadena Water and Power Final Projects for Completion of Underground Utility Program City Council March 14, 2016 Item 16.
Home Inspection Broward - Florida Inspections Unlimited (954)
Florida Public Service Commission’s 2007 Storm Preparedness Workshop
Public Power in Florida Mutual Aid and Storm Readiness
Florida Public Service Commission
EMBARQ – FLORIDA, INC STORM PREPAREDNESS May 1, 2008
MONROE COUNTY EMERGENCY MANAGEMENT
is followed by strong winds that greatly affect a habitat.
Progress Energy Florida 2008 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 1, 2008.
Factors to Consider when Designing a Reliable Power Grid
2007 Hurricane Season Preparations
Florida PSC 2014 Hurricane Season Preparation
Florida PSC Hurricane Preparedness Meeting May 6, 2009
Factors to Consider when Designing a Reliable Power Grid
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Available at © University of Florida 2009.
Pole Position Student Points Time
A B C D.
Presentation transcript:

Cooperative Continuity Management Bill Willingham Florida Electric Cooperatives Association, Inc. Tallahassee, FL

Approximately 900 coops and 2,000 municipally-owned electric utilities

Mitigation/Hardening There are several things that co-ops can do to “harden” the system, but they are not cheap or without complications

Overhead Pole Inspections Vegetation Management Design/Construction Standards

Vegetation Management

Design/Construction Standards Overhead facilities can be built to withstand higher winds if money is not an issue, but even the strongest designs cannot withstand trees, debris, tornados, or microbursts Florida Keys EC is building to extreme wind standard

Underground Problems flexibility in rural areas cost longer non-disaster outages coastal areas flood prone areas trees