The Office Building Washington, D.C. Penn State Architectural Engineering Senior Capstone Project Brett Miller | Construction Option Advisor: Dr. Ed Gannon.

Slides:



Advertisements
Similar presentations
| Michael Gallagher | Construction Management AE Faculty Consultant: Dr. Riley The Pennsylvania State University AE Senior Thesis Project.
Advertisements

Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Penn State Architectural Engineering Senior Capstone Project Ramy Labna | Construction Option | Advisor: Prof Ray Sowers 2B + G + M + 7 Mansoura Development.
University Health Building Thesis Final Presentation
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Ann & Richard Barshinger Life Science & Philosophy Building Franklin & Marshall College – Lancaster, PA Michael A. Hebert Structural Option Spring 2006.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Fisk Corporate Headquarters Houston, Texas Penn State AE Senior Capstone Project Stephen Blanchard – Construction Management Option Advisor: Dr. John Messner.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
George Read Hall The University of Delaware
Jeremy Feath Construction Option University Engineering Building Mid-Atlantic University, United States ( Courtesy of Owner)
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Department of Civil Engineering,
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
The Apartment Building Rockville, MD Penn State AE Senior Capstone Project Brian Bernens | Construction Option Advisor: Dr. Rob Leicht Courtesy DAVIS.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
Senior Thesis 2006 The Pennsylvania State University
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Presented by Cameron Mikkelson April 16, 2014 Silverado Senior Living Brookfield, WI Analysis Topics On-site Prefabrication of Interior Wall Panels Installation.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
The Katzen Arts Center Washington, D.C. The Katzen Arts Center Washington, D.C. Introduction LEED Certification Analysis Excavation Support System Analysis.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
North Hills Junior High School Pittsburgh, PA Senior Thesis Final Presentation 2005 Chris Rush Lighting / Electrical Faculty Consultant: Dr. Mistrick.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Penn State AE Senior Capstone Project
North Hall | American University| Washington D.C.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Final Thesis – Nathan Braskey Construction Option Craig Dubler
Construction Project Management
Introduction James W. & Frances G. McGlothlin Medical Education Center
CT Reinforced Earth Structures
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Senior Thesis Presentation
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
Presentation transcript:

The Office Building Washington, D.C. Penn State Architectural Engineering Senior Capstone Project Brett Miller | Construction Option Advisor: Dr. Ed Gannon

Brett Miller Construction Introduction The Office Building Washington, D.C. Project Overview Analysis 1 | Foundation Walls Analysis 2 | Neighboring Foundation Support Research| Retaining Structures Analysis 3 | Value Engineering

Project Size108,000 SF Height Above Grade9 Stories Contract Value$30.5 million Dates of ConstructionMarch 2013 – March 2015 OccupantUndetermined Primary UseOffice Building OwnerMid Atlantic Realty General ContractorJames G. Davis Construction ArchitectGensler Brett Miller Construction Project Overview The Office Building Washington, D.C. Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

AdvantagesDisadvantages Sheet Piling (A)Watertight Excavation Costly Time Consuming Soldier Piles and Lagging (B) Less Expensive Faster Loud Installation Not Watertight Concrete Slurry Walls (C) Watertight Extreme Depths Foundation Walls Extremely Costly Time Consuming Top Down Construction (D) Fast Ground Stability Geotech. Considerations Brett Miller Construction Research | Retaining Structures The Office Building Washington, D.C. A B C D Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 1 | Foundation Walls The Office Building Washington, D.C. Problem Identification Extensive support of excavation 60 Foundation wall box-outs Formwork time/cost Potential Solutions Replace CIP with shotcrete to reduce formwork Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 1 | Foundation Walls The Office Building Washington, D.C. Total Cost Cast-in-Place$314, Shotcrete$237, Savings$77, % Savings Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 1 | Foundation Walls The Office Building Washington, D.C. Final Schedule Cast-in-Place48 Days Shotcrete15 Days Savings33 Days 68.8% Savings Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 1 | Foundation Walls The Office Building Washington, D.C. $77, Days Cast-in-Place Shotcrete Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 2 | Neighboring Foundation Support The Office Building Washington, D.C. Problem Identification Historic building on West property line Foundation needs supported Secant Wall duration Potential Solutions Replace Secant Wall with Slurry Wall Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 2 | Neighboring Foundation Support The Office Building Washington, D.C. 35% Increase + Total Cost Secant Wall$551,000 24” Slurry Wall$744,000 Additional Costs$193,000 Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 2 | Neighboring Foundation Support The Office Building Washington, D.C. Final Schedule Secant Wall15 Days Slurry Wall15 Days Savings0 Days 0% Savings Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 2 | Neighboring Foundation Support The Office Building Washington, D.C. $193,000 0 Days Secant Wall 24” Slurry Wall Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 3 | Value Engineering The Office Building Washington, D.C. Problem Identification Unforeseen costs Over budget Expensive copper feeder Potential Solutions Replace copper wiring with less expensive system Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 3 | Value Engineering The Office Building Washington, D.C. 15.0” 4.5” Sizing Aluminum WiringSizing Aluminum Busway Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 3 | Value Engineering The Office Building Washington, D.C. Total Cost Copper Wiring$330, Aluminum Wiring$313, Aluminum Busway$225, % Savings 5% Savings Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 3 | Value Engineering The Office Building Washington, D.C. Final Schedule Copper Wiring46 Days Aluminum Wiring50 Days Aluminum Busway41 Days Aluminum Wiring Schedule IncreaseAluminum Busway Schedule Savings 8.7% Increase10.9% Savings + Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Analysis 3 | Value Engineering The Office Building Washington, D.C. Copper Wiring Aluminum Wiring Copper Wiring Aluminum Busway 4 Days $17,000 $105,000 5 Days Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Conclusion & Recommendations The Office Building Washington, D.C. Analysis 1 | Foundation Walls Cost Impact: Save $77,000 Schedule: Save 33 Days Recommendation: Select Shotcrete Analysis 2 | Neighboring Foundation Support Cost Impact: $193,000 More Expensive Schedule: No Advantage Recommendation: Select Secant Wall Analysis 3 | Value Engineering Cost Impact: Aluminum Wire Saves $17,000 Aluminum Busway Saves $105,000 Schedule: Aluminum Wire Takes 4 More Days Aluminum Busway Saves 5 Days Recommendation: Select Aluminum Busway Total Savings $182, Days Presentation Outline Project Overview Research | Retaining Structures Analysis 1 | Foundation Walls Cost Schedule Conclusion Analysis 2 | Neighboring Foundation Support Cost Schedule Conclusion Analysis 3 | Value Engineering Electrical Breadth | Sizing wire/Busway Cost Schedule Conclusion Conclusion & Recommendations Acknowledgements

Brett Miller Construction Acknowledgements The Office Building Washington, D.C. Academic Acknowledgements Dr. Ed Gannon Dr. Robert Leicht Dr. Craig Dubler Special Thanks The DAVIS Project Team Will Cox – DAVIS Project Manager Drew Heilman – DAVIS Project Engineer Rebecca Nordby – Balfour Beatty Project Executive PACE Industry Members Friends and Family Industry Acknowledgements

SystemP1P2P3Total Cast-in-Place Shotcrete Savings SystemMaterialLaborEquipmentTotal Cast-in-Place$229,583.19$69,120.00$16,240.77$314, Shotcrete$186,587.54$30,240.00$20,989.00$237, Savings$42,995.65$38, $4,748.23$77, Brett Miller Construction Appendix A | Foundation Walls The Office Building Washington, D.C.

Brett Miller Construction Appendix A | Foundation Walls The Office Building Washington, D.C. Cast-in-Place Concrete Cost Breakdown Floor Volume (cu yd) Concrete Unit Cost ($/cu yd) Concrete Cost Formwork Unit Cost ($/ft) Formwork Cost Rebar Cost Total Material Cost Labor Unit Cost ($/Day) Labor Cost Equipment Unit Cost ($/cu yd) Equipment Cost Total P $24,274.05$78.37$25,901.29$21,021.39$71,196.73$1,440.00$34, $110, P $22,261.08$78.37$23,746.11$18,987.06$64,994.25$1,440.00$17, $86, P $31,733.88$78.37$33,855.84$27,802.49$93,392.21$1,440.00$17, $117, Total: $78, $83,503.24$67,810.94$229, $69, $16,240.77$314, Shotcrete Cost Breakdown Floor Volume (cu yd) Concrete Unit Cost ($/cu yd) Concrete Cost Rebar Cost Total Material Cost Labor Unit Cost ($/Day) Labor Cost Equipment Unit Cost ($/cu yd) Equipment Cost Total P3234$157.32$36,812.88$21,021.39$57,834.27$2,016.00$9,072.00$27.80$6,505.20$73, P2216$157.32$33,981.12$18,987.06$52,968.18$2,016.00$8,064.00$27.80$6,004.80$67, P1305$157.32$47,982.60$27,802.49$75,785.09$2,016.00$13,104.00$27.80$8,479.00$97, Total755 $118,776.60$67,810.94$186, $30, $20,989.00$237, Shotcrete Schedule Breakdown Floor Volume (cu yd) Duration (Day) P P22164 P Total75515 CIP Schedule Breakdown Floor Wall Length (ft) Duration (Day) P P P Total106648

Brett Miller Construction Appendix B | Neighboring Foundation The Office Building Washington, D.C. Cost Comparison SystemMaterialLabor / ManpowerEquipment Transportation / Mobilization Grand Total Secant Wall System$230,000$117,000$78,000$126,000$551,000 24" thick Slurry Wall$408,000$86,000$70,000$180,000$744,000 Savings-$178,000$31,000$8,000-$54,000-$193,000 Schedule Comparison SystemDuration Secant Wall System Mob/demob1 Week Wall2 Weeks 24" thick Slurry Wall Mob/demob2 Weeks Wall1 Week

Brett Miller Construction Appendix C | Electrical Breadth The Office Building Washington, D.C.

Master Format CodeDescriptionUnitLength Material Unit Cost Total Material Labor Unit Cost Total LaborTotalCrew # of Crews Labor Hours Duration (hrs) kcmil Copper Conductor CLF96.46$1,186.75$114,473.91$833.04$80,355.04$194, Elec /0 kcmil Copper Grounding Conductor CLF24.115$253.51$6,113.39$402.48$9,705.81$15, Elec " Diameter Metal Conduit LF2411.5$25.25$60,890.38$38.07$91,805.81$152, Elec Total$181, $148,959.18$330, Master Format Code DescriptionUnitLength Material Unit Cost Total Material Labor Unit Cost Total LaborTotalCrew # of Crews Labor Hours Duration (hrs) kcmil Aluminum Conductor C.L.F $398.95$49,477.78$221.52$27,472.91$76, Elec /0 Aluminum Grounding Conductor C.L.F $111.10$3,444.66$111.28$3,450.24$6, Elec " Diameter Metal ConduitL.F $25.25$78,287.63$38.07$118,036.04$196, Elec Total$131, $181,866.65$313, Master Format Code DescriptionUnitLength Material Unit Cost Total Material Labor Unit Cost Total LaborTotalCrew # of Crews Labor Hours Duration (hrs) Feeder Al Busway 2500 amp L.F200.5$484.80$97,202.40$147.68$29,609.84$126, Elec Plug-in Al Busway 2500 amp L.F144$398.95$57,448.80$126.88$18,270.72$75, Elec Busway End Box 2500 amp Ea.2$1,136.25$2,272.50$738.40$1,476.80$3, Elec Busway Elbow 2500 amp Ea.10$1,464.50$14,645.00$442.00$4,420.00$19, Elec1880 Total$171, $53,777.36$225, Brett Miller Construction Appendix D | Value Engineering The Office Building Washington, D.C. Copper Wiring BreakdownAluminum Wiring Breakdown Aluminum Busway Breakdown