WISDOM WP7 Dissemination & Exploitation Start M0, End M36 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC.
Advertisements

STRENGTHENING COOPERATION ON CYBER SECURITY WITHIN THE ASEAN REGION
Linn OHLSSON, IATI Secretariat Rudolphe PETRAS, Development Co-operation Directorate, OECD IATI Steering Committee, 3 October 2013 The Common Standard.
MAMA - Network Project WP 7. MAMA-AWARE Coordinated by UNEP/MAP (MB 11) – MED POL Unit.
1 Meeting: 20 th January, Rome P. Zakynthinos WP#2: Applications of Silicon-Organic Hybrid (SOH) and Device Specification.
Probabilistic Adaptive Real-Time Learning And Natural Conversational Engine Seventh Framework Programme FP7-ICT
Final Review Meeting – Brussels 22-April FP6 IST “Broadband for all” Network of Excellence Project e-Photon/ONe+ “Optical Networks: Towards.
1 23/05/2015 Networking Research Infrastructure NCPs National Hellenic Research Foundation (EKT/NHRF) Project Monitoring & Coordination Unit EuroRIs-NET.
1 CES IASSIST 2002, June 2002 University of Connecticut MetaNet: Standardising Statistical Metadata Methodology Karen Brannen University of Edinburgh,
Simulation of All-optical Packet Routing employing PPM-based Header Processing in Photonic Packet Switched Core Network H. Le Minh, Z. Ghassemlooy and.
Network of Excellence “Dissemination & Awareness Strategy” meeting, Luxembourg February 2006 Dr Nozha Boujemaa INRIA Imedia, Paris MUSCLE NoE.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
The Future for BRC Global Standard Food Safety David Brackston Senior Technical Service Manager BRC.
1 IEEE Intelligent Transportation Systems (ITS) Council, International Collaboration to help People Travel Smarter Daniel J Dailey Ph.D. Past President.
Multilateral Project for Transfer of Innovation Project Duration: 24 months Partners’ Kick-off Meeting, November 2009, Sofia Tanya Pancheva/University.
The Preparatory Phase Proposal a first draft to be discussed.
Co-funded by the European Union "This project has been funded with support from the European Commission. This publication reflects the views only of the.
R.Burgess 2 June National Contact Point Meeting Photonic Components: Strategic Objective Ronan Burgess European Commission Directorate General Information.
WP4 – Optical Processing Sub-System Development Start M06, finish M30 UCC lead Plans for next 6 months: –Begin firmware/control work –Focus on initial.
The CCOPPS Project Dissemination Summary & Valorisation Issues Jo Davenport NAFEMS CCOPPS Partner Meeting Paris 20 th & 21 st November 2008.
Agenda TopicSpeaker Wednesday Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage reviews, updates and.
ALL-OPTICAL PACKET HEADER PROCESSING SCHEME BASED ON PULSE POSITION MODULATION IN PACKET-SWITCHED NETWORKS Z. Ghassemlooy, H. Le Minh, Wai Pang Ng Optical.
Roadmap on Long-Term US-Africa Research and Education Collaboration Joe H. Chow Rensselaer Polytechnic Institute Troy, New York, USA Third NSF Workshop.
Marketing for Maximum Visibility Sonali Dutta Int’l. Rep. Meet, January 19, 2005.
THE GEO GLOBAL CAPACITY BUILDING SYMPOSIUM Seville (Spain) September 10 & 11, 2007.
1 WERT: WP 5 RG EVANS ASSOCIATES November 2010 Aim To pilot and evaluate the content and context of the course material with target groups To help women.
WISDOM WP7 Dissemination & Exploitation Start M0, End M42 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies.
WISDOM WP7 Dissemination & Exploitation Start M0, End M36 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies.
WP4 Progress Photonic Systems Group. 2Tyndall, Photonic Systems Group 3-Gate pattern recognition system SOA1 SOA2 Repeated data 10-40Gb/s Target pattern.
RECOMMEND 2nd Working summit Comp 2 „Communication & Dissemination“ Ingrid Rozhon 28th Nov 2012 Peterborough / UK.
EU Project TEAM Communication Dr. Adam Jeff On behalf of Prof. Carsten Welsch and the Team.
Education...Discovery...Innovation...Achievement Fast Forward Growing Brand Identity and Global Recognition for the CPMT Society Potomac Communications.
Agenda TopicSpeaker Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage updatesWorkpackage leaders Demonstrator.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
-1- Elias Athanasopoulos, ICS-FORTH Software Modeling WP3 Software Modelling WISDOM Simulator Elias Athanasopoulos*, Antonis Krithinakis, George Kopidakis.
Agenda TopicSpeaker Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage updatesWorkpackage leaders Demonstrator.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
1 Dissemination and Exploitation Kick off meeting - Torino Dec 2003 Alan Gobbi.
Progress Meeting WP4 status review Teleconference with GMV, GSA Konstandinos Diamandouros 16/12/2010 GNSS for INnovative road Applications.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
Workpackage 3 New security algorithm design ICS-FORTH Ipswich 19 th December 2007.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 Work Package 11 Dissemination and.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP10: Dissemination, Transfer and Exploitation Review.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA2 – Dissemination, Outreach & Communication.
WP5 – Wirespeed Photonic Firewall Validation Start M27, finish M35 Avanex lead Description of Work –Establish test bed suitable to validated the optical.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 Work Package 11 Dissemination and.
Title of Presentation Subtitle/other information 1 EU-ASEAN S&T cooperation to jointly tackle societal challenges WP5: Communication and.
Dissemination Report on Group Discussion WP3 Meeting 4/4/2003.
Michael Abo-Bakr, JACoW, , Trieste Free Electron Laser Conference Series  Overview of FEL Conference Series  Organization & Particularities.
WISDOM meeting 29/01/07 Photonic Systems Group Tyndall National Institute R.J. Manning R.P. Webb, X.Yang, R. Giller Tyndall National Institute/University.
WISDOM WP6 Manufacturability, Scalability and Functionality Study Start M0, End M35 WP leader is CIP Objectives –Assessment of manufacturability of the.
Helix Nebula final dissemination report Daniele Catteddu Cloud Security Alliance Helix Nebula – The Science Cloud.
WP5 – Wirespeed Photonic Firewall Validation Start M27, finish M41(tbc) CIP now lead Description of Work –Establish test bed suitable to validated the.
SOLARNET DISSEMINATION AND COMMUNICATION PLAN SOLARNET DISSEMINATION AND COMMUNICATION PLAN (Outreach Plan) SOLARNET PROJECT OFFICCE.
Project Work Packages - Role And Task Of Partners, Expected Outcomes And Results Partners’ Meeting, 16 – 18 December 2007, Sofia Tanya Pancheva/University.
Pupil Health & Well-Being — an Education Priority 4 Europe’s Schools Dissemination plan.
Brussels, January 16th, Overview and status of the project.
WP9: Dissemination and Exploitation
1st Steering Committee Meeting activities from WP3 –
BRAIN Alliance Research Team Annual Progress Report (Jul – Feb
Year One: Project implementation overview
Dissemination Activities Report
WP3 - Dissemination.
WP7 - Dissemination of Results & Exploitation
WP8: Outreach and Liaison
1st Steering Committee Meeting activities from WP3 –
NEXPReS Period 3 Overview
Global Smart Card Market 2018: Analysis, Opportunities and Forecast To 2025
IEEE P Working Group for Wireless Personal Area Networks
Editor in Chief: Cosimo Stallo Executive Assistant: Judy Scharmann
Presentation transcript:

WISDOM WP7 Dissemination & Exploitation Start M0, End M36 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies and devices: target users groups. –Promote the WISDOM concept through the participation in the technical exhibition of major optical conferences and symposiums. –Prepare and distribute technical brochures. –Disseminate the scientific results by means of publications and presentations. –Establish a Web site

WISDOM WP7 Year 2 Overview –10 publications 8 conference (3 invited), 1 journal published, 1 journal submitted –2 magazine articles (Greek Economist & Components in Electronics) –CIP exhibit at ECOC07 (Berlin) and OFC08 (San Diego) & customer discussions –D7.2 produced in M18 –Webpage hits increasing

WISDOM WP7 Dissemination –Main industrial BT-Ellacoya (Arbor Networks) Ellacoya acquired in 2008 Change of roadmap (Yet to be confirmed)

WISDOM Website Some modifications & improvements

Website Statistics Continued increase in # visits Some correlation to WISDOM presentations, releases Press Release OFC08 ECOC07 OFC07

Website Visitors 2006 (June – December) Most from industry

Website Visitors 2007 (January – December) Increase in countries (low level)

Website Visitors 2008 (January – May) Increase in visits/country

Publication Details Major international conference exposure Magazine articles with wide readership –E. Athanasopoulos, G. Kopidakis and E. P. Markatos (FORTH), “Development of secure optical networks”,Greek Economist, September 2007 –G. Maxwell, A. Poustie (CIP), “Ring of Fire”, Components in Electronics Magazine - April 2008

Journal Details X. Yang, A. K. Mishra, R. J. Manning, R. P. Webb, A. D. Ellis (UCC), “All-optical 40Gb/s NRZ to RZ format conversion by cross-phase modulation in single SOA”, Electronics Letters, 2007, vol.43, no.16, pp R.P. Webb, X. Yang, R.J. Manning, G.D. Maxwell, A.J. Poustie, S. Lardenois and D. Cotter (UCC,CIP), “All-Optical Binary Pattern Recognition at 42 Gb/s”, Submitted to IEEE J Lightwave Technol.

Conference Details R.J. Manning, R. Giller, X. Yang, R.P. Webb, D. Cotter (UCC), “Faster Switching with Semiconductor Optical Amplifiers”,paper WB2.5, IEEE Photonics in Switching, San Francisco, USA, R. J. Manning, R. Giller, X. Yang, R. P. Webb and D. Cotter (UCC), “SOAs for All- Optical Switching-Techniques for Increasing the Speed”, paper Th.A2.1, The 9th International Conference on Transparent Optical Networks (ICTON), Jul. 2007, Rome, Italy. R.P. Webb, X. Yang, R.J. Manning, G.D. Maxwell, A.J. Poustie, S. Lardenois and D. Cotter (UCC, CIP), ”42Gbit/s All-Optical Pattern Recognition System”, OFC 2008, paper OTuL 2 G. Maxwell (CIP), “Hybrid Integration Technology for High Functional Devices for Future Optical Communications”, OFC2008, invited paper OWI3 X. Yang, R.P. Webb, R.J. Manning, G. Maxwell, A. Poustie, S. Lardenois (UCC, CIP),“Demonstration of All-Optical Pattern Recognition at 42Gbit/s”, submitted to ECOC 2008 X. Yang, R.P. Webb, R.J. Manning, D. Cotter, G. Maxwell, A. Poustie, S. Lardenois (UCC, CIP), “Application of Semiconductor Optical Amplifier Logic Gates in High- Speed All-Optical Pattern Recognition”, Invited paper submitted to ICTON 2008 M. Koyabe (BT), “Next Generation ICT Infrastructure Threats”, 1st ICT-FORWARD Workshop, Gothenburg, Sweden. April 17-18th 2008 M. Koyabe (BT), “Defence Against Next Generation e-Crime Threats”, EPSRC Interact India Project, City University London, 30th June 2008

Year 3 Plans CIP exhibit booth at ECOC08 and OFC09 UCC/CIP paper submitted to ECOC08 CIP invited talk at ECIO08 (Netherlands), APOC08 (China), COINS08 (Japan), UCC invited talk at ICTON08 (Greece), FORTH paper submitted to HotNets Further papers from continuing experimental work (UCC pattern match, CIP hybrid devices), potentially from security algorithm perspective Anticipate further IP generation as work progresses Continue to contact potential user groups as results become available/significant