P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the H.E.S.S. cameras Pascal Vincent (LPNHE.

Slides:



Advertisements
Similar presentations
Exploiting VERITAS Timing Information J. Holder a for the VERITAS Collaboration b a) School of Physics and Astronomy, University of Leeds, UK b) For full.
Advertisements

Bunch-by-Bunch Instrumentation Module Design Goals: –Unified conceptual design for all bunch-by-bunch instrumentation Beam position monitoring Bunch tune.
UNIVERSITA’ DEGLI STUDI DI NAPOLI FEDERICO II Luigi Cimmino November 12 th, Tokyo INTERNATIONAL WORKSHOP ON MUON & GEO-RADIATION PHYSICS FOR EARTH.
The Pierre-Auger PMT Test Stand Chris Jillings Feb 6, 2002.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Investigation for Readout Electronics of WAC in LHAASO Shubin Liu University of Science & Technology of China April 22nd, 2009.
Multichannel Analyzers A multichannel pulse-height analyzer (MCA) consists of an ADC, a histogramming memory, and a visual display of the histogram recorded.
Prototype string for a km3 Baikal neutrino telescope Roma International Conference on Astroparticle Physics V.Aynutdinov, INR RAS for the Baikal Collaboration.
Pascal Vincent, LPNHE Paris An advanced Facility for ground-based gamma-ray Astronomy CTA Paris meeting, 1-2 nd march 2007 Camera and electronics Manel.
F. Goebel, MPI München, 4 May 2006, Berlin Florian Goebel Max-Planck-Institut für Physik (Werner-Heisenberg-Institut) München for the MAGIC collaboration.
Leroy Nicolas, HESS Calibration results, 28 th ICRC Tsukuba Japan, August Calibration results of the first two H·E·S·S· telescopes Nicolas Leroy.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
May 4-5, 2006 T.Schweizer, CTA meeting Berlin Concept idea for a future telescope array observatory CTA meeting Berlin May 4-5, 2006 Thomas Schweizer.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
PSD upgrade: Ar-present and Xe-future 1.- Status of the PSD upgrade 2.- PSD performance after upgrade 3.- Problems during the Ar-run 4.- Future scenarios.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
RICH 2004, Playa del Carmen, G.Vasileiadis The HESS Experiment G.Vasileiadis GAM-Univ.Montpellier II For the HESS Collaboration.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Jamie Holder University of Leeds August 2005 Status and Performance of the First VERITAS Telescope.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Overview on H.E.S.S. camera designs P. Vincent for the HESS collaboration LPNHE – IN2P3/CNRS – Université Paris VI & VII H.E.S.S.-MAGIC-CTA meeting in.
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
Design for Wide FOV Cherenkov telescope upgrading THE 2 nd WORKSHOP OF IHEP Shoushan Zhang Institute of High Energy Physics.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD.
Sampling chip psTDC_02 Jean-Francois Genat – Herve Grabas Mary Heinz – Eric Oberla 1/27/ psTDC_02 presentation.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
D. Bertrand, J. De Bruyne, P. De Harenne, L. Etienne, S. Hannaert, G. Van Beek The Arch.
Jean-François Genat Fast Timing Workshop June 8-10th 2015 FZU Prague Timing Methods with Fast Integrated Technologies 1.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
Aurore Savoy-Navarro 1), Albert Comerma 2), E. Deumens 3), Thanh Hung Pham 1), Rachid Sefri 1) 1) LPNHE-Université Pierre et Marie Curie/IN2P3-CNRS, Fr.
Update on works with SiPMs at Pisa Matteo Morrocchi.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
H.Ohoka, H.Kubo, M.Aono, Y.Awane, A.Bamba, R.Enomoto, D.Fink, S.Gunji, R.Hagiwara, M.Hayashida, M.Ikeno, S.Kabuki, H.Katagiri, K.Kodani, Y.Konno, S.Koyama,
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
 13 Readout Electronics A First Look 28-Jan-2004.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
The dynamic range extension system for the LHAASO-WCDA experiment
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Front-end Electronic for a neutrino telescope : a new ASIC SCOTT
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
CTA-LST meeting February 2015
Readout electronics for aMini-matrix DEPFET detectors
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Ewald Effinger, Bernd Dehning
Hellenic Open University
EMC Electronics and Trigger Review and Trigger Plan
A First Look J. Pilcher 12-Mar-2004
Front-end electronic system for large area photomultipliers readout
VELO readout On detector electronics Off detector electronics to DAQ
PID electronics for FDIRC (Focusing Detector of Internally Reflected Cherenkov light) and FTOF (Forward Time of Flight) Christophe Beigbeder and Dominique.
BESIII EMC electronics
ME instrument and in-orbit performance
PID meeting Mechanical implementation Electronics architecture
Presented by T. Suomijärvi
Presentation transcript:

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the H.E.S.S. cameras Pascal Vincent (LPNHE – Universites Paris 6 & 7) for the H.E.S.S. collaboration HESS (high energy stereoscopic system)28 th ICRC Tsukuba Japan - 5, August 2003

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the HESS cameras28 th ICRC Tsukuba Japan - 5, August 2003Pascal Vincent - LPNHE-Paris P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 LPNHE-Paris J-P.Denance, J.Guy, J-F.Huppert, P.Nayman, M.deNaurois, M.Rivoal, L.Rolland, J-P.Tavernet, F.Toussenel, P.Vincent LLR L-M.Chounet, B.Degrange, G.Fontaine, P.Manigot PCC P.Espigat, M.Punch MPIK-Heidelberg G.Herman, A.Kohnle, C.Masterson, T.Saitoh

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120 GeV Dynamic range up to few 10 TeV Good collection efficiency Energy resolution ~ 10-20% Fast trigger. Modularity : easy to repair Fully embedded system P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 OG 2.5 Poster 2-P-112, A K Konopelko et al.

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Camera Mechanics Modular system of 60 drawers of 16 phototubes each Only 3 cables for power supply, central trigger and network. WaterProof (pneumatic front lid protection against sun & water) Weight ~ 900 Kg

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Winston cones In the front of the camera 960 Winston cones collect ~70% of light

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Front-end electronics 60 drawers of 16 PMs (photonis PMT XP 2960) : QE ~ 25% + active bases DC-DC converter V HV & current readout Current limit 1 "Slow Control" card : High voltage control and monitoring Temperature & Current monitoring Counting scalers 2 cards with Analogue Memory ship (x8 PMTs).

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Analogue Memory ARS0 Analogue Memory ARS0 built for ANTARES experiment (SEI- Dapnia) 5 buffers /chip, 128 cells per channel. 1 GHz Readout ~ 1 Mhz Controlled by two parameters Readout window (~16 ns) Readout delay (50-70 ns) Readout : Sampling or integrated charge mode

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Readout & First level trigger ARS0 Connection to photo-tubes Trigger channels Analogue Fpga 8 x comparators Adder Enable/disable (4 channels) output local trigger Fanout signal entry Amplifications Buffers 12 bits ADC Digital Multiplexor Readout channels

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Camera trigger based on sectorisation (x64 pixels) 38 overlapping sectors

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Parallel transfer on 4( ↗ 8) busses Acquisition system Readout system

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Linearity High gain 1 ⇨ 200 e Low gain 10 ⇨ e

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Single e of gain

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Calibration System for the first camera LED system 960 LEDs with programmable intensity from 0.6 to more than e Pulse width of ~ 2 ns Synchronisation < 1ns Controlled by camera CPU Camera response

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Second Calibration System LED system for gain single e P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 First light june 11, 2002 Installation of the first camera, by the end of may 2002 Installation of the second camera, february 2003 New busses & CPU © W.Hofmann

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Camera 3 & 4 under construction Camera 3 Camera 4 P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Busses x 4( ↗ 8) busses

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Camera 3 has left construction area for Namibia August 31, 2003 for the opening ceremony of the 28 th ICRC

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Acquisition speed Limited by : readout of the analogue memories. data transfer on the drawer's busses. readout by the CPU. Dead 250 Hz

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Camera installation schedule Camera 1 Camera 2 +Upgrade of camera 1 Camera 3 Camera 4 +Upgrade of Cameras 1, 2 & 3 Ju ne Fevr uary Septem ber De ce m be r P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 That's all folks!